Dromineer , Nenagh , Co. Tipperary
CONDITIONALPlanning application 19601203
Tipperary - Tipperary County Council
Proposed Development
and completion of domestic garage and retention of alterations to house; roof windows, stairs and bedroom in converted attic including additional floor area 5.3 sq. m. 2) windows at ground floor level 3) entrance porch
Application Timeline
Application received
30 Oct 2019
Further information requested
11 Dec 2019
Further information received
29 May 2020
Decision: CONDITIONAL
21 Jul 2020
Decision due
29 Jul 2020
Grant issued
24 Aug 2020
Application Details
- Location
- Dromineer , Nenagh , Co. Tipperary
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.166 ha
Timeline
- Registration Date
- 30 October 2019
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 21 July 2020
- Grant Date
- 24 August 2020
- Permission Expires
- 23 August 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
a) proposed new part dormer, part single storey dwelling, b) proposed treatment system, percolation area, c) proposed new single storey garage, d) proposed new entrance from public road and e) all associated site works/services
Dromineer , Co. Tipperary
a new extension to the side of the existing dwelling and for alterations to the front elevation of the existing dwelling and all associated siteworks
Dromineer , Nenagh , Co. Tipperary
a) the provision of additional berthing facilities for 10 boats in the outer basin and associated works, b) the removal of existing earthen berm and widening of the marina outer basin on its western side, c) a new gabion retaining wall c. 10.5m long, composed of steam washed selected stone, to southern edge of widened marina basin, d) the installation of new 2m wide pontoon walkway, supported off steel piles, and six number 1m wide pontoon finger walkways and timber fendering to west side of the widened marina outer basin, e) the increase in width of existing concrete slipway located at south-east edge of outer basin from 4.75 metres to 6.5 metres, f) the installation of temporary water filled cofferdam to mouth of outer basin to enable short term drainage of the basin and which temporary cofferdam will be removed on completion of works to the outer basin, g) the installation of temporary panel barrier to channel between outer and inner basin to enable short term drainage of the outer basin and which temporary barrier will be removed on completion of works to the outer basin, h) the removal of spoil from the outer basin and from the channel connection to inner basin, i) all enabling and site development works, landscaping, paving, boundary treatment, plant areas, services provision and connections, waste management facilities and all other ancillary works. A Natura Impact Statement will be submitted to the planning authority with the application
Shannon Sailing Marina , Dromineer Nenagh , County Tipperary
minor modifications to the granted planning permission (Ref. No. 2360651). The modifications will consist of the following: mixed-use building, additional below-ground back-of-house and plant space at lower ground floor level, additional plant space within the roof areas including screening, minor internal space modifications and adjustments at upper ground floor level resulting in ca 43sqm of additional area, minor modifications to elevations reflecting layout changes. Terrace units: internal layout modifications allowing for subdivisions and interconnection of bedrooms resulting in the potential to provide 3 additional bedrooms with an area increase of approximately 10sqm, minor modifications to elevations reflecting layout changes. Apartment Units: internal layout amendments to a block of Type 1 apartment units, allowing for subdivisions and interconnection of bedrooms, resulting in the potential to provide 4 additional bedrooms, with minor modifications to elevation windows reflecting layout changes, internal layout amendments to a block of Type 2 apartment units, allowing for subdivisions and interconnection of bedrooms, resulting in the potential to provide 3 additional bedrooms with minor modifications to elevation windows reflecting layout changes. Existing Waterside Cottages: 6no additional single-story extensions to houses No. 5,6,8,9,10 and 11, accommodating en-suite bathrooms. All associated site development works
Dromineer Bay Hotel and Waterside Cottages , Dromineer , Nenagh
installation of a new floating jetty, which will consist of five new finger pontoons along with an adjoining new end jetty in the inner harbour. The plan includes the relocation of an existing refurbished foul-water pump-out on the existing harbour breakwater to a more accessible and more effective location
Dromineer Harbour , Dromineer , Co. Tipperary
the construction of a 1st floor extension to existing dwelling and all ancillary site works
Dromineer , Nenagh , Co. Tipperary
the provision of a 25m² wooden gazebo and all associated works necessary to facilitate the development including landscaping and lighting
Dromineer Harbour , Dromineer , Nenagh
the provision of a 25m² Wooden Gazebo and all associated works necessary to facilitate the development including landscaping and lighting
Dromineer Harbour , Dromineer , Nenagh
development of a proposed floating moorings and wastewater pump-out, the proposed works involve the installation of a new floating jetty, which will consist of five new finger pontoons along with an adjoining new end jetty in the inner harbour, the plan includes the relocation and replacement of the existing refurbished foul water pump-out on the existing inner harbour wall with a new facility in a more accessible location on the harbour breakwater wall
Dromineer Harbour , Dromineer , Co. Tipperary
a redevelopment of the former Domineer Bay Hotel site and, modification and development within the adjacent (‘Waterside Cottages’) holiday home complex to provide for a mixed-use commercial and tourism enterprises and, provision of new associated short-stay tourism accommodation. The proposed development includes; 1.Demolition of existing hotel structure and adjacent reception building and shed and construction of a two-storey mixed use building comprising of; (i) event spaces with ancillary reception/lobby, office, bar, kitchen and associated stores and WC facilities; (ii) 1 no. tourism related retail/commercial space; (iii) 1 no. restaurant with associated kitchen, stores, staff changing and WC; (iv) 1 no. retail unit; (v) 1 no. café; and (vi) external terrace; 2.Provision of new accommodation intended for tourism use associated with the proposed events spaces and the existing holiday home complex (‘Waterside Cottages’) including construction of: (i) 6 no. 1-bed, 2-storey terrace units, and (ii) 14 no. 1-bed apartments comprising: (a) one 2-storey block consisting of 6 no. 1-bed apartment units, and (b) one 2-storey block consisting of 8 no. 1-bed apartment units; 3.Modifications to existing holiday houses and complex (‘Waterside Cottages’) to enhance accommodation provision in the form of: (i) Provision of single-storey extension to rear elevation of existing holiday house Nos. 1, 2, 4 and 7; (ii) Provision of 2-storey extension to side elevation of existing holiday house Nos. 3, 4, 6 and 10; and (iii) modifications to internal access road, parking and amenity area arrangements; 4.Construction of new vehicular access from the public road (R495) with provision of additional parking; 5.Reconfiguration of existing car parking area associated with the former hotel located on the northern side of the hotel building; 6.Enhancement of existing surface water arrangements including provision of surface water attenuation system within the northern carpark and provision of petrol interceptor; 7.Landscaping, signage and all associated site development works. A Natura Impact Statement has been submitted.
DROMINEER BAY HOTEL , AND WATERSIDE COTTAGES , DROMINEER
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?