Redmondstown , Clonmel , Co. Tipperary
CONDITIONALPlanning application 201256
Tipperary - Tipperary County Council
Proposed Development
1) First Aid Room (55.7m2), 2) Warehouse (1212.28m2), 3) LPG Storage Tank & Pump Shed (20m2), 4) Overburden Storage area (3370m2), 5) Log Storage Area (2.98 Ha), 6) Fuel (Wood Chips) Storage Shed (758m2), 7) Diesel Stores (44.3m2), 8) Contract Cabin (22.2m2), 9) Compressor room (151.2m2), 10) Stores Building (89.2m2) & Fenced Storage area (44.2m2), 11) Oil Stores (84.6m2), 12) Maintenance Vehicle area (22m2), 13) Bike Shed (20.45m2), 14) Weighbridge (80m2), 15) 6 no. Storage Containers (81m2 = 6.5 m2 X 1 & 14.9m x 5), 16 ) Boundary Fencing (530m Long, 2m high), 17) Recycle Chip Storage Bay (300m2) within an application area of 7.0 hectares. This application relates to development for the purposes of an activity requiring an Industrial Emissions Licence
View the full application file on the council's planning portal →Application Timeline
Application received
28 Oct 2020
Decision: CONDITIONAL
15 Dec 2020
Decision due
22 Dec 2020
Grant issued
27 Jan 2021
Application Details
- Location
- Redmondstown , Clonmel , Co. Tipperary
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Tipperary County Council
Timeline
- Registration Date
- 28 October 2020
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 15 December 2020
- Grant Date
- 27 January 2021
- Permission Expires
- 26 January 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
development consists of the Retention of 1) First Aid Room (55.7m2), 2) Warehouse (1212.28m2), 3) LPG Storage Tank & Pump Shed (20m2), 4) Overburden Storage area (3370m2), 5) Log Storage Area (2.98 Ha), 6) Fuel (Wood Chips) Storage Shed (758m2), 7) Diesel Stores (44.3m2), 8) Contract Cabin (22.2m2), 9) Compressor room (151.2m2), 10) Stores Building (89.2m2) & Fenced Storage area (44.2m2), 11) Oil Stores (84.6m2), 12) Maintenance Vehicle area (22m2), 13) Bike Shed (20.45m2), 14) Weighbridge (80m2), 15) 6 no. Storage Containers (81m2 = 6.5 m2 X 1 & 14.9m" x 5), 16 ) Boundary Fencing (530m Long, 2m high), 17) Recycle Chip Storage Bay (300m2) within an application area of 7.0 hectares. This application relates to development for the purposes of an activity requiring an Industrial Emissions Licence
Redmondstown , Clonmel , Co. Tipperary
to replace an existing electrical building. This application relates to development for purposes of an activity requiring an Integrated Pollution Control License
Redmondstown , Clonmel
construction of 1.8km of boundary fencing, including access gates and associated works. This application relates to development for the purposes of an activity requiring an Integrated Pollution Control License
Redmondstown , Clonmel , Co Tipperary
demolition of existing structures consisting of two agricultural sheds, to construct access roads in and use field adjacent to existing factory log storage areas for additional log storage (this application relates to development for the purposes of an activity requiring an Integrated Pollution Prevention and Control Licence
Redmondstown , Clonmel , Co. Tipperary
construction of woodchip reception unit, a woodchip storage structure, woodchip mechanical conveyors and associated works (this application relates to development for the purposes of an activity requiring an integrated pollution prevention and control licence)
Redmondstown , Clonmel , Co Tipperary
existing garden room to front of house and Permission for renovation and extension of existing storey and a half detached dwelling to include, (a) demolition of existing sunroom side extension (b) construction of two storey front and side extensions (c) construction of first floor dormer to rear (d) window and door alterations, internal modifications and all associated site works and services
Redmondstown , Clonmel , Co. Tipperary
(a) existing garden room to front of house (b) demolition of existing sunroom side extension (c) construction of two storey front and side extensions (d) construction of first floor dormer to rear (e) window and door alterations, internal modifications and all associated site works and services
Redmondstown , Clonmel , Co. Tipperary
the conversion and change of use of an integrated garage to home office and elevational changes including relocated Velux windows in front and additional door to side
Rathloose , Clonmel , Co. Tipperary
replace and relocate fencing adjacent to site entrance (This application relates to development for the purposes of an activity requiring an Integrated Pollution Prevention and Control Licence
Redmondstown , Clonmel , Co. Tipperary
replace and relocate fencing adjacent to site entrance
Redmondstown , Clonmel , Co. Tipperary
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?