← Back to search

Cooleeny Derryfadda Derryville and Killoran , Moyne , Thurles

CONDITIONAL

Planning application 20129

Tipperary - Tipperary County Council

Proposed Development

a 10 year planning permission for modifications to Condition No. 1 of previously granted planning permission Ref. No. 18/601296. The modifications comprise an outfall drain and associated pumping station and monitoring chambers to discharge surface water and treated waste water from the Biorefinery site through the townlands of Cooleeny and Derryfadda to the Drish River; a water supply pumphouse and associated site works including access road and security fencing in the townland of Derryville and a water supply pipeline from the pumphouse to the Biorefinery facility site. A Natura Impact Statement (NIS) will accompany the application. This application relates to development which comprises or is for the purpose of an activity requiring an Industrial Emissions Licence.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    13 Feb 2020

  2. Decision: CONDITIONAL

    3 Apr 2020

  3. Decision due

    8 Apr 2020

  4. Grant issued

    27 Jun 2020

Application Details

Location
Cooleeny Derryfadda Derryville and Killoran , Moyne , Thurles
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council

Timeline

Registration Date
13 February 2020
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
3 April 2020
Grant Date
27 June 2020
Permission Expires
26 June 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

226m
2360281CONDITIONAL28 Apr 2023

development consisting of Workshop Building (1242m2), Truck Washout Building (64m2), commercial yard area, new boundary fence and entrance gates, an on-site Wastewater Treatment System and associated polishing filter bed percolation area, attenuation tank, bored well & water storage tank, rainwater harvesting tank, emergency storage tank, solar panels to roof of existing building and all associated siteworks - application is accompanied by an NIS

Killoran , Thurles , Co. Tipperary

372m
18601296CONDITIONAL26 Oct 2018

a biorefinery facility comprising of a process building with processing areas, plant rooms, stores, personnel & administrative areas; external bunded process & storage areas; vessels and tanks; CHP plant; an effluent & water treatment plant which includes bunded tanks & a building;sewage treatment plant; water storage tanks & site development works including demolition of an existing electrical building, roads, paved areas, parking areas, drains and services, bore well, lighting, fire water retention tank, attenuation pond, site fencing, alterations to the discharge pipeline from the sewage treatment plant, weighbridges & weighbridge office, connection to an existing outfall pipeline and landscaping works. The application is accompanied by an Environmental Impact Assessment Report. This application relates to development which comprises or is for the purpose of an activity requiring an Integrated Pollution Prevention and Control Licence

Killoran , Moyne , Thurles

379m
18601265N/A22 Oct 2018

a biorefinery facility comprising of a process building with processing areas, plant rooms, stores, personnel & administrative areas; external bunded process & storage areas; vessels and tanks; CHP plant; an effluent & water treatment plant which includes bunded tanks & a building;sewage treatment plant; water storage tanks & site development works including demolition of an existing electrical building, roads, paved areas, parking areas, drains and services, bore well, lighting, fire water retention tank, attenuation pond, site fencing, alterations to the discharge pipeline from the sewage treatment plant, weighbridges & weighbridge office, connection to an existing outfall pipeline and landscaping works. The application is accompanied by an Environmental Impact Assessment Report. This application relates to development which comprises or is for the purpose of an activity requiring an Integrated Pollution Prevention and Control Licence

Killoran , Moyne , Thurles

518m
211171CONDITIONAL10 Aug 2021

1) Demolition of the existing loading bay canopy 2) Change of use from maintenance depot to an agri-food sector Research and Development Unit for light indutrial use with ancillary office space 3) Extension of the existing first floor accomodation by 169 sqm. 4) Construction of an external stair to the rear, additional windows to the front and rear elevations with an external perforated printed mesh screen fixed to the front and south gable elevation, canopy over the front entrance door and an array of PV Panels fixed to the roof 5) Landscape works including a waste water treatment plant and car parking with 4 no. electric vehicle chargers

Former Maintenance Depot Former Lisheen Mine , Kiloran , Moyne Thurles Co. Tipperary

583m
20825CONDITIONAL28 Jul 2020

works within the boundary of the existing Lisheen 110 kV Substation, the proposed works will comprise: replacement and improvement works to an existing electrical transformer bund; construction of two new concrete plinths for associated electrical infrastructure; installation of electrical infrastructure; and underground cable connection from the electrical infrastructure to the existing substation control building. The application is accompanied by a Planning and Environmental Report and Appropriate Assessment Screening Report

Killoran , Templetuohy , Co Tipperary

623m
2460936CONDITIONAL2 Nov 2024

construction of an anaerobic digestion plant comprising: 4 no. primary digester tanks (each measuring c. 7.6 m in height); 3 no. secondary digester tanks (each measuring c. 14.5 m in height); 4 no. feed hoppers; 4 no. technical rooms (ranging in size from c. 35 sq m to c. 95 sq m GFA); 2 no. biogas conditioning units; process, storage and buffer tanks (comprising: 1 no. buffer digestate storage tank (c. 7.5 m in height), 1 no. suspension buffer tank (c. 8 m in height), 1 no. process area runoff storage tank (c. 4.5 m in height); 1 no. buffer digestate process tank (c. 4.5 m in height), 1 no. treated digestate liquids recycle storage tank (c. 4.5 m in height); 1 no. roofed liquids feed-mix tank (c. 3 m in height)); these components will be located within a containment bund constructed c. 3 m below ground level. The proposed development will also consist of: feedstock storage (comprising 3 no. storage clamps (c. 1,050 sq m in area each) and 2 no. storage sheds (c. 500 sq m GFA each)); a biomethane upgrading plant (including natural gas compression unit); a biomethane loading facility (comprising 4 no. loading bays with associated gates and safety features measuring c. 490 sq m in area); a biomass boiler with its associated pellet storage silo (c. 12.5 m in height); Combined Heat and Power (CHP) plant and associated heat exchanger; a single storey bio-based fertiliser processing and storage unit (c. 3,890 sq m GFA) (including digestate dewatering plant, fertiliser pasteurisation plant and bio-based fertiliser loading facilities); a single storey office building (c. 105 sq m GFA) (including offices, meeting room, control room, laboratory, welfare facilities, storeroom and a first-aid facility); bin storage; 9 no. car parking spaces (including 5 no. standard parking spaces, 2 no. electric vehicle (EV) spaces and 1 no. accessible car parking space); electric vehicle (EV) charging infrastructure; 10 no. bicycle parking spaces; vehicular, cyclist and pedestrian access / egress and associated circulation routes; 2 no. weighbridges; a vehicle steam wash area; fuel storage tank and associated bund; an emergency flare (c. 7.6 m in height); a process area runoff lagoon; an attenuation pond; an ESB sub-station; boundary treatments [including gates, piers and fencing]; site lighting; all hard and soft landscaping; provision of sustainable urban drainage systems (SUDS); and all other associated site excavation, infrastructural and all other associated site excavation

Former Lisheen Mine Site , Killoran Moyne , Thurles Co. Tipperary

623m
2460978CONDITIONAL14 Nov 2024

a state-of-the-art healthcare waste treatment and recycling facility and a waste transfer station. The development will include the construction of 3 no. buildings; Building 1 (total gross floor area of circa (ca.) 2,242m2 and ca. 9m tall), Building 2 (total gross floor area of ca. 229m2 and ca. 6m tall) and Building 3 (total gross floor area of ca. 68m2 and ca. 4m tall) along with associated ancillary development including rooftop solar photovoltaic panels, 1no. battery energy storage system (total gross floor area of ca. 34m2 x 2m tall) and inverter, onsite tank with bunding, vehicle parking, rainwater harvesting tank, surface water retention ponds, firewater retention pond, firewater storage pillow tank, an on-site wastewater treatment system and associated polishing filter bed percolation area, dedicated container storage yard for the temporary storage of container units, signage, landscaping, perimeter security fencing and all ancillary works. The total development area will be ca. 3.75 hectares(ha). The development will intake ca. 10,000 tonnes per annum of healthcare waste for treatment and recycling and an additional ca. 15,000 tonnes per annum of hazardous waste will be accepted, temporarily stored, handled and consolidated onsite for onward transfer - an EIAR has been submitted with the application

Killoran , Thurles , Co. Tipperary

677m
2460958N/A8 Nov 2024

proposed state-of-the-art waste treatment unit and recycling facility and waste transfer station - the proposed development will disinfect and recycle healthcare waste, in addition, the other hazardous waste will be consolidated onsite for export

Killoran , Thurles , Co. Tipperary

682m
21709CONDITIONAL19 May 2021

building (3657 sq m) with a car park and access road, commercial yard area and access road, truck prep building (110 sq m), 2 m high boundary architectural fence, signage, public lighting, solar panels to the building roof, an on-site waste water treatment system and associated polishing filter bed percolation area, rainwater harvesting tank, emergency storage tank, attenuation tank, bored well and all associated site works - application is accompanied by a Natura Impact Statement (NIS)

Cooleeney and Derryfadda , Moyne , Thurles Co. Tipperary

702m
211128CONDITIONAL30 Jul 2021

construction of a Solar PV development with a maximum export capacity (MEC) of up to 122MW comprising of ca. 214,800 no. photovoltaic panels laid out in arrays, the construction of a 38kV substation, (ca.57.31m2 x 4.45m tall) along with associated ancillary development including 30 no. Transformer Stations (ca. 7.27m2 x 2.6m) with an integrated bund, 716 string Inverters, 1 no. DNO Substation Building (16.28m2 x 5.42m), 1 No. Storage and maintenance building (ca. 57.31m2 x 4.45m tall), 38 no. CCTV cameras mounted on ca. 3.8m high poles, perimeter security fenching and all ancillary works, the total development area will be ca. 77ha.

Cooleeny , Derryfadda and Killoran , Co. Tipperary