5 Ard Gaoithe Close , Clonmel , Co. Tipperary
N/APlanning application 20213
Tipperary - Tipperary County Council
Proposed Development
conversion of existing garage into a walk-in shower room (including raising the height of the flat roof) and construction of a single storey extension to the rear of the existing garage and associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
6 Mar 2020
Application withdrawn
24 Apr 2020
Application Details
- Location
- 5 Ard Gaoithe Close , Clonmel , Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
Timeline
- Registration Date
- 6 March 2020
- Status
- WITHDRAWN
- Decision
- N/A
- Withdrawn
- 24 April 2020
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
construction of a single storey extension to the rear and side of existing two storey dwelling and all associated site works
Number 22 Auburn Park , Clonmel , Co. Tipperary
construction of a single storey extension to the rear and side of existing two storey dwelling and all associated site works
No. 22 Auburn Park , Clonmel , Co. Tipperary
construction of a single storey extension to the rear and side of existing two storey dwelling and all associated site works
Number 22 Auburn Park , Clonmel , Co. Tipperary
to carry out modifications to my dwelling house including a two-storey side extension, a single-storey rear extension and modifications to the front elevation including all associated site development works
25 Auburn Park , Clonmel , Co Tipperary
the change to the front and side elevations, new signage on the building and provision of 3 no. new stand-alone signs, including all associated site development works
Cashel Road , Clonmel , Co. Tipperary
(a) increased ground floor area from that previously permitted (b) first floor area and (c) elevational changes and all associated site development works
Clonmel Business Park , Cashel Road , Clonmel
the as constructed workshop units, signage and associated site works
Clonmel business park , Cashel Road , Clonmel Co. Tipperary
a new steel 0.5m X 0.87m X 1.36m(LxWxH) approx. above ground natural gas district regulating installation to replace the existing district regulating installation complete with a 3m high lamp post style relief vent stack with all ancillary services and associated site works
Orchard Homes DRI , Cashel Court , Cashel Road Roundabout
to install a new steel 0.5m x 0.87m x 1.36m (LxWxH) approx. above ground natural gas district regulating installation to replace the existing district regulating installation complete with a 3m high 'lamp post' style relief vent stack with all ancillary services and associated site works at Orchard Homes DRI, Cashel Court
Cashel Road Roundabout , Clonmel , Co. Tipperary
• Construction of two new dwelling houses, • Renovation works to the existing house, • An extension to the existing house, • All associated site works. This includes the demolition of existing structures where required and the provision of ancillary facilities as necessary
Sunville House , Ardgeeha Lower , Clonmel
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?