← Back to search

Old Dublin Road , Barnora , Cahir

N/A

Planning application 20290

Tipperary - Tipperary County Council

Proposed Development

six parking spaces to the west facing side and relocation of the existing gas tank to the east and Permission for internal modification to existing offices, waiting area, toilets and canteen and the construction of new waiting/reception area, toilets, store at ground floor level and new first floor extension mezzanine extension consisting of staff canteen, store and open plan area (103.25 sqm) together with all associated site works

View the full application file on the council's planning portal →

Application Details

Location
Old Dublin Road , Barnora , Cahir
Applicant
N/A
Application Type
RETENTION
Planning Authority
Tipperary County Council

Timeline

Registration Date
23 March 2020
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

12m
20192N/A2 Mar 2020

internal modification to existing offices, waiting area, toilets and canteen and the construction of new waiting/reception area, toilets, store at ground floor level and new first floor extension mezzanine extension consisting of staff canteen, store and open plan area (103.25 sqm) together with all associated site works

Old Dublin Road , Barnora , Cahir

21m
20321CONDITIONAL31 Mar 2020

six parking spaces to the west facing side and relocation of the existing gas tank to the east and Permission for internal modification to existing offices, waiting area, toilets and canteen and the construction of new waiting/reception area, toilets, store at ground floor level and new first floor extension mezzanine extension consisting of staff canteen, store and open plan area (103.25 sqm) together with all associated site works

Old Dublin Road , Barnora , Cahir

109m
2460096CONDITIONAL13 Feb 2024

development of an Integrated Constructed Wetland (ICW) for the treatment and management of wash waters arising from the Mart's facility. The existing Balancing tank will be retained. Flows from the existing tank will be routed via new pipework to the ICW for treatment. The proposed ICW will consist of a screen, settlement tank, 3 ICW treatment cells, discharge tank, pipework and associated works. Discharge flows, following treatment will be to the River Suir within the ownership boundary of the site

Cahir Mart , Barnora , Co. Tipperary

157m
2560638CONDITIONAL3 Jul 2025

(i) the use of the existing building for the sale of coffee for consumption off the premises in addition to the existing established uses within the premises (ii) for new window pod extension (iii) for material alterations to the existing elevations of the existing building (iv) for new signage and all associated site works

Barnora , Cashel Road , Cahir

189m
2278CONDITIONAL1 Feb 2022

(i) domestic garage/store (ii) hipped roof to rear extension of dwelling and (iii) existing boundary walls

Cashel Road , Cahir , Co. Tipperary

195m
2561288CONDITIONAL12 Dec 2025

the construction of an acoustic wall 5m high x 38m long and associated site works

Cahir Mart , Barnora , Cahir Co. Tipperary

257m
17600619CONDITIONAL30 May 2017

permission to erect new bicycle shelter and extend existing car park area and associated site development works

Colaiste Dun Iascaigh , Barnora , Cahir

275m
2361033CONDITIONAL22 Dec 2023

a single storey extension to existing dwelling house. Retention Permission is also required for the existing porch to front of existing dwelling and all associated site works

10 Hogan's Square , Cahir , Co. Tipperary

288m
2660027N/A15 Jan 2026

development which will consist of: a) Construction of three new extensions with a total combined floor area of 2,484m², comprising - (i) Extension 1 (2,367m²), a part single storey and part two storey extension to the west of the existing school building. Extension 1 comprises a 4no. classroom SEN base, 6 no. general classrooms, 4 no. specialist classrooms, 3no. SET rooms, as well as storage, toilets, locker/social spaces, and other ancillary accommodation. Extension 1 is connected to the existing school by two short link corridors. Extension 1 includes solar PV panels on the roof, and (ii) Extension 2 (58.5m²) and Extension 3 (58.5m²), both single storey extensions located within a service yard to the east of the existing school building. Extensions 2 and 3 are both technology preparation rooms and are attached directly to existing technology classrooms, b) Demolition of part of the existing service yard, including three small stores, c) Construction of a new 2.1m high rendered wall and vehicular gates to the modified service yard, and construction of a new covered storage area, d) Modifications and extension to the existing car park to provide additional car parking spaces and an SEN set down area, e) Two new covered bicycle shelters and relocation of the two existing covered bicycle shelters, f) Provision of a new heat pump compound enclosed in 2.1m high palisade fencing, g) Construction of an SEN enclosed play area and a sensory garden, h) All ancillary site development works, including new hard and soft landscaping, an underground firefighting static storage tank, a swale and a soakaway, and i) All associated site services, including external lighting and EV charging

Coláiste Dún Iascaigh , Cashel Road , Cahir

294m
18600475CONDITIONAL18 Apr 2018

(i) Planning Permission to demolish an existing outbuilding (ii) Planning Permission to construct an extension to an existing dwelling (iii) Retention Planning Permission for an existing porch extension to the front of the existing dwelling and (iv) Retention Planning Permission for an existing garage and all associated site works

6 Hogan Square , Cahir , Co. Tipperary

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?