The Pike , Knockshigowna , Ballingarry Roscrea
CONDITIONALPlanning application 20315
Tipperary - Tipperary County Council
Proposed Development
install onsite wastewater treatment system, and all associated site works (This development is within the curtilage of a protected structure S22)
View the full application file on the council's planning portal →Application Timeline
Application received
30 Mar 2020
Decision: CONDITIONAL
1 Jul 2020
Decision due
18 Jul 2020
Grant issued
4 Aug 2020
Application Details
- Location
- The Pike , Knockshigowna , Ballingarry Roscrea
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.117 ha
Timeline
- Registration Date
- 30 March 2020
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 1 July 2020
- Grant Date
- 4 August 2020
- Permission Expires
- 3 August 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
changes to previously granted house design, ref 21/299 (the proposed development concerns the Recorded Protected Structure S548)
The Pike , Ballynahinch , Ballingarry Roscrea Co. Tipperary
construction of an extension and minor modifications to provide connection and alter the internal layout of the existing dwelling, works will also include the construction of a garage, provision of a new wastewater treatment system and the demolition of an existing outbuilding/shed to allow the provision of a vehicular entrance to the site, including all associated siteworks (the proposed development concerns the Recorded Protected Structure S548)
The Pike , Ballynahinch , Ballingarry Roscrea Co. Tipperary
construction of a single storey rear extension and minor modifications to provide connection and alter the internal layout of the existing dwelling, including the provision of a window to the existing South Elevation. Works will also include the construction of a garage, provision of a new wastewater treatment system and the demolition of an existing outbuilding/shed to allow the provision of a vehicular entrance to the site, including all associated siteworks. The proposed development concerns the Recorded Protected Structure S548
The Pike , Ballynahinch , Ballingarry
single storey stores to south side of existing garage, retention and completion of single storey turf shed to west of existing garage and the development will consist of the demolition of existing porch and Permission for the construction of a single storey extension to north side of dwelling, all the above with associated site works
The Pike , Knockshigowna , Ballingarry
the construction and operation of an agricultural feedstock based 1MW Anaerobic Digestion (AD) biomethane facility producing renewable energy facility utilising 29,800 tonnes per annum of agriculture sourced feedstocks, the proposed development will occupy an area of 2.31 hectares (5.71 acres) and will include the following elements: 1 no. single storey reception building with welfare facilities, staff and visitor car-parking, 1 no. truck delivery and pickup hardstanding area, 1 no. site perimeter low level bund, 1 no. overground water storage tank, 2 no. 40ft storage containers, 1 no. 20ft storage container, 1 no. propane storage tank, 1 no. methane storage tank, 1 no. feedstock hopper/feeder, 1 no. wheel wash, 1 no. rainwater harvesting system, 1 no. underground rainwater storage tank, 1 no. weighbridge, 2 no. anaerobic digester tanks, 2 no. digestate storage tanks, 1 no. slurry storage tank, 4 no. feed-stock clamps, 1 no. biogas and biomethane flare, condensate trap and pump, 1 no. 500 kWCHP plant, 1 no. pump and control room container, 1 no. biogas cleaning and upgrading container, 1 no. biogas compression container, 2 no. water interceptor units, 1 no. surface water soak-away designed to BRE365, surface water and feedstock leachate management infrastructure, 1 no. 6 PE wastewater treatment system, 1 no. ESB substation, new entrance off L1071, external perimeter stockproof fencing and gates, landscaping and tree screening and associated site works
Sandymount Farms , Ballingarry , Roscrea
planning permission 201340 for an agricultural feedstock based 1MW Anaerobic Digestion (AD) biomethane facility producing renewable energy facility utilising 29,800 tonnes per annum of agriculture sourced feedstocks, the proposed development will occupy an area of 2.31 hectares and will include the following elements: 1 no. single storey reception building with welfare facilities, staff and visitor car-parking, 1 no. truck delivery and pickup hardstanding area, 1 no. site perimeter low level bund, 1 no. overground water storage tank, 2 no. 40ft storage containers, 1 no. 20ft storage container, 1 no. propane storage tank, 1 no. methane storage tank, 1 no. feedstock hopper/feeder, 1 no. wheel wash, 1 no. rainwater harvesting system, 1 no. underground rainwater storage tank, 1 no. weighbridge, 2 no. anaerobic digester tanks, 2 no. digestate storage tanks, 1 no. slurry storage tank, 4 no. feed-stock clamps, 1 no. biogas and biomethane flare, condensate trap and pump, 1 no. 500 kWCHP plant, 1 no. pump and control room container, 1 no. biogas cleaning and upgrading container, 1 no. biogas compression container, 2 no. water interceptor units, 1 no. surface water soak-away designed to BRE365, surface water and feedstock leachate management infrastructure, 1 no. 6 PE wastewater treatment system, 1 no. ESB substation, new entrance off L1071, external perimeter stockproof fencing and gates, landscaping and tree screening and associated site works
Sandymount Farms , Ballingarry , Roscrea
construction of a grain storage shed and all ancillary site works thereto
Sandymount , Ballingarry , Roscrea
slatted cattle house with underground slurry storage and all associated site works which is in the curtilage of a protected structure, Knockshigowna House
Knockshigowna , Ballingarry , Roscrea Co. Tipperary
a 1-Megawatt (MV) agricultural slurry and rotation crop based Anaerobic Digestion (AD) facility. The Proposed AD Facility will utilise up to 29,800 tonnes of organic material per annum. All feedstocks will be sourced from the applicants landholding or lands leased by the applicant. It is proposed to process approximately 10,000 tonnes of liquid feedstock in the form of slurry with a further 19800 tonnes per annum of solid feedstock including rotation and catch crops such as maize, grass, triticale or whole crop. The process will be subject to a 3-stage validation process by the Department of Agriculture Food and the Marine (DAFM). The applicant also proposed to install a single storey administration building with welfare facilities, staff and visitor car-parking, truck delivery and pickup hardstanding area, water storage tank, wheel wash, rainwater harveting system, weighbridge, 2 no. digester tanks, 2 no. digestate storage tanks, 2 no. slurry storage tanks, 4 no. feedstock clamps, biogas flare, gas boiler container, pump and control room container, biogas cleaning and upgrading container, gas compression container, 2 no. surface water attenuation tanks, 2 no. surface water interceptor units, 2 no. surface water flow limited out falls, foul water treatment unit & pump sump, ESB substation, external perimeter stockproof fencing and gates, landscaping & tree screening and all associated site works
Sandymount Farms , Ballingarry , Roscrea
the construction and operation of an agricultural feedstock based 1MW Anaerobic Digestion (AD) biomethane facility producing renewable energy facility utilising 29,800 tonnes per annum of agriculture sourced feedstocks, the proposed development will occupy an area of 2.31 hectares (5.71 acres) and will include the following elements: 1 no. single storey reception building with welfare facilities, staff and visitor car-parking, 1 no. truck delivery and pickup hardstanding area, 1 no. site perimeter low level bund, 1 no. overground water storage tank, 2 no. 40ft storage containers, 1 no. 20ft storage container, 1 no. propane storage tank, 1 no. methane storage tank, 1 no. feedstock hopper/feeder, 1 no. wheel wash, 1 no. rainwater harvesting system, 1 no. underground rainwater storage tank, 1 no. weighbridge, 2 no. anaerobic digester tanks, 2 no. digestate storage tanks, 1 no. slurry storage tanks, 4 no. feed-stock clamps, 1 no. biogas and biomethane flare, condensate trap and pump, 1 no. 500 kWCHP plant, 1 no. pump and control room container, 1 no. biogas cleaning and upgrading container, 1 no. biogas compression container, 2 no. water interceptor units, 1 no. surface water soak-away designed to BRE365, surface water and feedstock leachate management infrastructure, 1 no. 6 PE wastewater treatment system, 1 no. ESB substation, new entrance off L1071, external perimeter stockproof fencing and gates, landscaping and tree screening and associated site works
Sandymount Farms , Ballingarry , Roscrea