← Back to search

Bolakeale , The Commons , Thurles

CONDITIONAL

Planning application 20648

Tipperary - Tipperary County Council

Proposed Development

construction of (i) cubicle shed with underground effluent tanks and loose straw area and all associated site works. Retention for wall silage pit with effluent tank also required

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    24 Jun 2020

  2. Decision: CONDITIONAL

    12 Aug 2020

  3. Decision due

    18 Aug 2020

  4. Grant issued

    15 Sept 2020

Application Details

Location
Bolakeale , The Commons , Thurles
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council

Timeline

Registration Date
24 June 2020
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
12 August 2020
Grant Date
15 September 2020
Permission Expires
14 September 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

18m
2660623CONDITIONAL26 Jun 2026

a) the construction of agricultural building to include milking parlour, ancillary rooms, livestock handling facilities, partially roofed collecting yard along with unroofed slatted soiled water/parlour washings tank, b) construction of silage slab & apron, c) istallation of milk silo, 2 no. water storage tanks & 2 no. meal bins, along with associated site works

Bolakeale , The Commons , Thurles

20m
20623N/A19 Jun 2020

Permission to construct (i) cubicle shed with underground effluent tanks and loose straw area and all associated site works. Retention for wall silage pit with effluent tank also required

Bolakeale , The Commons , Thurles

433m
2360402CONDITIONAL14 Jun 2023

proposed amendments to the previously consented grid connection granted under pl. ref. 21/1620 to comprise of: a) increase in number of joint bays along the extent of the grid connection from a total of 35 to 45 joint bays, b) grid connection to be operated at 38kV but installed to a 110kV underground cable design standards/infrastructure, c) minor adjustments to the route and red line boundary (Advisory Note: The full extent of the grid connection is 33.65 km and a separate amendment planning application will be made for an underground grid connection to Kilkenny County Council)

Various townlands - Coolanshinnagh Ardragh Gortfree Bolakeale , Coolanshinnagh Ardragh Gortfree Bolakeale , Co Tipperary.

451m
211097N/A27 Jul 2021

a ten year appropriate period planning permission for the installation of 2.25km of 38kV underground grid connection comprising cable ducting and associated electrical cabling and all other ancillary works including joint bays, culverts, maker posts and all associated developments in the townlands of Coolnashinnagh, Ardragh, Bolakeale & Gortfree, Co. Tipperary. Advisory Note: The full extent of the grid connection is 33.8km, and a separate planning application will be made for an underground grid connection to Kilkenny County Council. This development comprises part of an overall development for which planning permission was granted for a 9-turbine wind farm and all associated works on lands located in the townlands of Farranrory Upper, Farranrory Lower, Coolnashinnagh & Gortnasmuttan, Co. Tipperary. The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement

Coolnashinnagh Ardagh Gortfree and Bolakeale , Co. Tipperary

451m
211620CONDITIONAL5 Nov 2021

a ten-year appropriate period planning permission for development of this site: the proposed development will constitute the provision of the following: the installation of 2.25 km of 38kV underground grid connection comprising cable ducting and associated electrical cabling and all other ancillary works including joint bays, culverts, maker posts and all associated developments. Advisory Note: The full extent of the grid connection is 33.8 km, and a separate planning application will be made for a underground grid connection to Kilkenny County Council. This development comprises part of an overall development for which planning permission was granted for a 9 turbine wind farm and all associated works on lands located in the townlands of Farranrory Upper, Farranrory Lower, Coolnashinnagh and Gortnasmuttaun, Co. Tipperary. The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement

Coolanshinnagh Ardragh Gortfree Bolakeale , Co. Tipperary

1.1km
211068N/A22 Jul 2021

a ten year appropriate period planning permission for the installation of 2.25km of 38kV underground grid connection comprising cable ducting and associated electrical cabling and all other ancillary works including joint bays, culverts, maker posts and all associated developments in the townlands of Coolnashinnagh, Ardragh, Bolakeale & Gortfree, Co. Tipperary. Advisory Note: The full extent of the grid connection is 33.8km, and a separate planning application will be made for an underground grid connection to Kilkenny County Council. This development comprises park of an overall development for which planning permission was granted for a 9-turbine wind farm and all associated works on lands located in the townlands of Farranrory Upper, Farranrory Lower, Coolnashinnagh & Gortnasmuttan, Co. Tipperary. The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement

Coolnashinnagh Ardagh Gortfree and Bolakeale , Co. Tipperary

1.1km
2460280CONDITIONAL16 Apr 2024

a) an increase to the footprint of the substation compound of 381.6m2, b) an increase to the footprint of the substation building of 51.5m2, c) amendments to the layout of the offices and welfare facilities within the substation building, d) addition of 2 no. containers sized 6m by 2.43m by 2.59m in height for storage of parts and equipment during the operational phase, e) addition of 2 no. parking spaces and an extension of the access road, f) associated relocation of the permitted fence, g) amendments to the drainage design to accommodate changes to the layout, h) minor amendments to the red line of the permitted development to accommodate the above and i) addition of new joint bay

Coolnashinnagh , Ballingarry Thurles , Co. Tipperary

1.1km
211558N/A22 Oct 2021

a ten-year appropriate period planning permission for development of this site: the proposed development will constitute the provision of the following: the installation of 2.25 km of 38kV underground grid connection comprising cable ducting and associated electrical cabling and all other ancillary works including joint bays, culverts, maker posts and all associated developments. Advisory Note: The full extent of the grid connection is 33.8 km, and a separate planning application will be made for a underground grid connection to Kilkenny County Council. This development comprises part of an overall development for which planning permission was granted for a 9 turbine wind farm and all associated works on lands located in the townlands of Farranrory Upper, Farranrory Lower, Coolnashinnagh and Gortnasmuttaun, Co. Tipperary. The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement

Coolanshinnagh Ardragh Gortfree Bolakeale , Co. Tipperary

1.1km
2360367N/A31 May 2023

An amendment planning application for a planning application granted under reference PL/21/1620 in the townlands of Coolnashinnagh, Ardragh, Gortfee and Bolakeale, Co Tipperary. The previously consented planning application comprised the installation of 2.25 km of a 38kV underground grid connection comprising cable ducting and associated electrical cabling and all other ancillary works including joint bays, culverts, maker posts and all associated development. The proposed amendments to the previously consented grid connection comprise: • Increase in number of joint bays along the extent of the grid connection from a total of 35 to 45 joint bays • Grid connection to be operated at 38kV but installed to a 110kV underground cable design standards/infrastructure • Minor Adjustments to the route and red line boundary Advisory Note: The full extent of the grid connection is 33.65 km, and a separate amendment planning application will be made for an underground grid connection to Kilkenny County Council.

Various townlands - Coolanshinnagh Ardragh Gortfree Bolakeale , , Co Tipperary.

1.2km
19600105CONDITIONAL8 Feb 2019

a dwelling, domestic garage, entrance, bore well, install waste water treatment system including associated site works

Garrynagree , The Commons , Thurles

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?