Derryville , Moyne , Thurles Co. Tipperary
CONDITIONALPlanning application 20816
Tipperary - Tipperary County Council
Proposed Development
the acceptance and processing of organic waste materials at the existing Anaerobic Digestion Facility of up to 30,000 tonnes per annum; glass lined steel digestate storage tank of 46.1m in diameter and 5.67m in height; an office building of 5.83m in height, 7.6m in width and 15m in length; and all associated site development works, ancillary works and equipment. The planning application is accompanied by an Environmental lmpact Assessment Report (EIAR)
View the full application file on the council's planning portal →Application Timeline
Application received
27 Jul 2020
Further information requested
17 Sept 2020
Further information received
9 Nov 2020
Decision: CONDITIONAL
13 Apr 2021
Decision due
18 Apr 2021
Appeal submitted
10 May 2021
Grant issued
17 May 2021
Appeal decided: MODIFIED
19 Jul 2021
Application Details
- Location
- Derryville , Moyne , Thurles Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 2.3 ha
Timeline
- Registration Date
- 27 July 2020
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 13 April 2021
- Grant Date
- 17 May 2021
An Coimisiún Pleanála Appeal
- Appeal Reference
- ABP-310178-21
- Decision
- MODIFIED
- Submitted
- 10 May 2021
- Decided
- 19 July 2021
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
existing onsite weighbridge; the existing office portacabin structure of 9m in length, 3m in width and 2.6m in height until end of 2022; the existing control room of 4.31m in height, 5.1m in width and 5.06m in length; the biofilter unit and associated pipework installed in its existing orientation; the existing pump house of 2.4m in height, 2.5m in length and 1.7m in width; the plant room of 4.82m in height, 7.66m in width and 7.9m in length; and associated ancillary infrastructure including an underground holding tank of 45m3 capacity; tank bund area of 10.5m in length and 3m in width and 668 sq.m area of hardstanding with provision for 7 no. car parking spaces
Derryville , Moyne , Thurles
installation of a glass lined steel digestate storage tank of 46.1m in diameter and 5.67m in height; an office building of 5.83m in height, 7.6m in width and 15m in length; a hardstanding car parking area comprising of 7 no car parking spaces. Retention Permission for the existing onsite weighbridge; the existing office portacabin structure of 9m in length, 3m in width and 2.6m in height until 31/12/2019; the existing control room of 4.31m in height, 5.1m in width and 5.06m in length; the biofilter unit and associated pipework installed in its existing orientation; the existing pump house of 2.4m in height, 2.5m in length and 1.5m in width; the existing storage shed of 2.8m in height, 2.5m in length and 1.7m in width; the plant room of 4.82m in height, 7.66m in width, 7.9m in length and associated ancillary infrastructure including underground holding tank of 45m3 capacity; tank bund area of 10.5m in length and 3m in width
Derryville , Moyne , Thurles
installation of a glass lined steel digestate storage tank of 46.1m in diameter and 5.67m in height; an office building of 5.83m in height, 7.6m in width and 15m in length; a hardstanding car parking area comprising 7 no car parking spaces. Retention Permission of existing onsite weighbridge; the existing office portacabin structure of 9m in length, 3m in width and 2.6m in height until 31/12/2019; the existing control room of 4.31m in height, 5.1m in width and 5.06m in length; the biofilter unit & associated pipework installed in its existing orientation; the existing pump house of 2.4m in height, 2.5m in length and 1.5m in width; the existing storage shed of 2.8m in height, 2.5m in length and 1.7m in width; the plant room of 4.82m in height; 7.66m in width, 7.9m, in length & associated ancillary infrastructure including underground holding tank of 45m3 capacity; tank bund area of 10.5m in length and 3m in width
Derryville , Moyne , Thurles
the construction of an 1,800 sq.m sludge holding building of c. 60m in length, 30m in width and 13.5m in height, to incorporate an open faced biofilter to be installed at the western end of the facility building, for the acceptance and temporary storage of up to 12,000 tonnes per annum of sludges produced from wastewater treatment; internal site roads and parking; a 50 sq.m welfare/office facility of c. 10m in length, 5m in width and 5m in height; 1 no. surface mounted weighbridge; an electrical sub-station of c. 7.5m in length, 4.3 m in width and 3.2 m in height; underground holding tanks, infiltration areas and associated drainage pipework; pumphouse of c. 2.5m in width, 2.5 m in length and 2.8m in height; permeable and impermeable hardstanding; entrance gate and fencing and perimeter landscaping. An Environmental Impact Assessment Report has been submitted as a part of this application
Derryville Moyne , Thurles , Co. Tipperary
a 10-year planning permission for development of a BioProducts Campus. The Bioproducts Campus development consists of an integrated Compost / Growing Media Facility and Anaerobic Digestion Facility as well as a Biorefinery. The Compost / Growing Media Facility comprises 1 No. composting building (incorporating feedstock intake area, storage area, in-vessel tunnels, workshop), solar panels at roof level, associated biofilter and liquid storage tanks, 1 No. maturation building and 1 No. office building. The Anaerobic Digestion Facility comprises 3 No. digester tanks, 2 No. digestate storage tanks, 2 No. biogas fuelled electricity generating gas engines, 3 No. biogas processing units, associated storage tanks, bunding, plant and 1 No. gas flare. The BioRefinery includes 1 No. building (incorporating a goods inward area, processing area, drying room, process control rooms, a laboratory and offices), associated feedstock storage tanks; a BioEnergy Facility comprising 1 No. biomass boiler building, associated water storage tank, 1 No. materials storage building. The integrated Compost / Growing Media Facility and Anaerobic Digestion Facility will accept up to 80,000 tonnes of waste materials per annum. Provision of new site access from the R502, internal access roads and hardstanding, car parking, fire water tank and retention pond, ESB substation and pump house, 4 No. weighbridges, entrance gate and security fence. The proposed development includes all ancillary site development, landscaping and boundary treatment works above and below ground. The application relates to development which comprises or is for the purposes of an activity requiring an Industrial Emissions Licence. An Environment Impact Assessment Report will be submitted with this application.
Derryville , Co. Tipperary , Tipperary
alterations to previously permitted wind farm development (planning register refs 14/510138 and 15/600924 (Tipperary), 14/202, 15/629, 19/787 and 20/459 (Kilkenny) and 14/139, 19/597 and 20/386 (Laois)) where the permitted development also extends into the townland of Bruckana, Baunmore and Rathpatrick in Co. Kilkenny and Graigueadrisly in Co. Laois - the proposed alterations will consist of realignment of underground electrical and communications cable previously consented in the aforementioned permissions (omission of approx. 743 m of the permitted route and replacement with approx. 572 m of underground electrical and communications cabling) and all associated works and services
Killoran near Templetuohy , Co. Tipperary
proposed state-of-the-art waste treatment unit and recycling facility and waste transfer station - the proposed development will disinfect and recycle healthcare waste, in addition, the other hazardous waste will be consolidated onsite for export
Killoran , Thurles , Co. Tipperary
to construct a new building to incorporate offices, a store, toilet facilities and a canteen and all associated siteworks
Bruckana Windfarm , Bruckana , Johnstown
a state-of-the-art healthcare waste treatment and recycling facility and a waste transfer station. The development will include the construction of 3 no. buildings; Building 1 (total gross floor area of circa (ca.) 2,242m2 and ca. 9m tall), Building 2 (total gross floor area of ca. 229m2 and ca. 6m tall) and Building 3 (total gross floor area of ca. 68m2 and ca. 4m tall) along with associated ancillary development including rooftop solar photovoltaic panels, 1no. battery energy storage system (total gross floor area of ca. 34m2 x 2m tall) and inverter, onsite tank with bunding, vehicle parking, rainwater harvesting tank, surface water retention ponds, firewater retention pond, firewater storage pillow tank, an on-site wastewater treatment system and associated polishing filter bed percolation area, dedicated container storage yard for the temporary storage of container units, signage, landscaping, perimeter security fencing and all ancillary works. The total development area will be ca. 3.75 hectares(ha). The development will intake ca. 10,000 tonnes per annum of healthcare waste for treatment and recycling and an additional ca. 15,000 tonnes per annum of hazardous waste will be accepted, temporarily stored, handled and consolidated onsite for onward transfer - an EIAR has been submitted with the application
Killoran , Thurles , Co. Tipperary
works within the boundary of the existing Lisheen 110 kV Substation, the proposed works will comprise: replacement and improvement works to an existing electrical transformer bund; construction of two new concrete plinths for associated electrical infrastructure; installation of electrical infrastructure; and underground cable connection from the electrical infrastructure to the existing substation control building. The application is accompanied by a Planning and Environmental Report and Appropriate Assessment Screening Report
Killoran , Templetuohy , Co Tipperary
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?