← Back to search

Turraheen Lower , Rossmore , Cashel

N/A

Planning application 211089

Tipperary - Tipperary County Council

Proposed Development

new two storey extension to side (to replace existing single storey structure to be removed) and new single storey extension to rear of existing dwelling and all ancillary works

View the full application file on the council's planning portal →

Application Details

Location
Turraheen Lower , Rossmore , Cashel
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council

Timeline

Registration Date
26 July 2021
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

19m
21908N/A22 Jun 2021

new two storey extension to side (to replace existing single storey structure to be removed) and new single storey extension to rear of existing dwelling and all ancillary works

Turraheen Lower , Rossmore , Cashel

27m
201204N/A16 Oct 2020

new two storey extension to side (to replace existing single storey structure to be removed) and new single storey extension to rear of existing dwelling and all ancillary works

Turraheen Lower , Rossmore , Cashel

30m
211220N/A18 Aug 2021

new two storey extension to side ( to replace existing single storey structure to be demolished) and new single storey extension to rear of existing dwelling and all ancillary works

Turraheen Lower , Rossmore , Cashel

427m
18600144CONDITIONAL8 Feb 2018

the change of house design as granted under planning File 14600525 for two storey dwelling house

Turraheen Lower , Rossmore , Co Tipperary

793m
19600738N/A3 Jul 2019

the upgrade of existing site entrance to facilitate a timber harvest and haulage operation

Drumdiha , Kilcroe , Clogher

798m
19600789CONDITIONAL15 Jul 2019

the upgrade of an existing agricultural entrance into a forest road bellmouth to facilitate a timber harvest and haulage operation

Drumdiha , Kilcroe , Clogher

994m
19601431N/A19 Dec 2019

two storey dwelling, site entrance, waste water treatment system and all associated site works

Turraheen , Rossmore , Cashel

1.0km
2660646N/A3 Jul 2026

(i) existing employee welfare building, (ii) existing stables within a larger agricultural shed, (iii) existing storage shed, (iv) existing concrete yards, (v) existing vehicular entrance together with gates and boundary treatment, (vi) existing septic tank serving the existing employee welfare building, as well as planning permission to install a new percolation area to serve the existing septic tank - and all associated site development works

Turraheen Lower , Rossmore , Cashel

1.0km
2561093CONDITIONAL30 Oct 2025

the raw water gravity filters to be refurbished with new filter laterals, replacement media and extension of an internal weir wall, two 36m³ pre-cast concrete backwash water storage tanks to be constructed to supplement existing wash water holding tank capacity, sodium hydroxide (ph correction) kiosk with duty and standby pumps, sodium hydroxide bulk storage tank, used wash water balance tank with a holding volume of 200m³, lamella clarifier, sludge balancing tank to be located below round with a storage volume of 36m³, sludge thickener to be located above ground, thickened sludge pump station, sludge holding tank with a storage volume of 219m³, poly prep unit to be located in a kiosk (sludge poly kiosk), motor control center (mcc) container for control panels, interconnecting pipework and ducting, extended internal site access road, hardstanding around tanks and chambers, all related site works and ancillary development

Stooke Water Treatment Plant , Townland of Kilcroe , Co. Tipperary

1.0km
18600290CONDITIONAL9 Mar 2018

development consisting of the construction of 344m of 2.4m high palisade fencing and the installation of one manually operated lockable gate suited to match perimeter fencing

Rossmore Water Treatment Plant , Kilcroe , Co. Tipperary

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?