← Back to search

Derrymore , Roscrea , Co Tipperary

N/A

Planning application 211269

Tipperary - Tipperary County Council

Proposed Development

new bungalow style dwelling house, domestic garage, septic tank and percolation area, new site entrance and all associated site works

View the full application file on the council's planning portal →

Application Details

Location
Derrymore , Roscrea , Co Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council

Timeline

Registration Date
26 August 2021
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

6m
211347CONDITIONAL10 Sept 2021

new bungalow style dwelling house, domestic garage, septic tank and percolation area, new site entrance and all associated site works

Derrymore , Roscrea , Co Tipperary

582m
19601323CONDITIONAL28 Nov 2019

the erection of a 29.09 Hectare Solar PV Farm. The proposed solar farm will consist of the installation of a 40 year operation and subsequent decommissioning of a series of ground mounted solar photovoltaic PV Panels, mounted on steel support structures 2.885m in height, together with a single storey ESB Control Room, connection to nearby ESB Substation, 9 electrical transformation enclosures, underground cabling, CCTV poles and cameras, deer type security fencing around the site boundary, Site Entrance access roads, Temporary Construction Compound Area, Landscaping and other associated development works, for the purpose of generating renewable energy electricity

Derrymore , Roscrea , Co Tipperary

582m
22652CONDITIONAL28 Nov 2022

amending the design of the previously approved development (Planning Reference: 19601323, Tipperary County Council) which comprises consent for a 10 year period to construct and a 40 year period to operate a 29.09 hectare Solar PV Energy Development at Derrymore Townland, Roscrea, Co Tipperary. The proposed amendments include; (1) changes to the configuration of the Solar PV rows, (2) reduction in the height of the Solar PV panels, (3) slight increase in the bottom height of the Solar PV panels, (4) reduction in the spacing of Solar PV rows (strings), (5) increase in size of solar panels, (6) increase in solar panel output, (7) a change in solar panels tilt (degree) and (8) a decrease in the number of solar panels. A Natura Impact Statement will also be submitted to the Planning Authority for this proposed development

Derrymore , Roscrea , Co Tipperary

880m
2460549CONDITIONAL6 Jul 2024

the conversion of attic space to habitable rooms including bedrooms and home office with gable windows and roof lights to rear and all associated site works

The Sheehys , Roscrea , Co. Tipperary

880m
2560679CONDITIONAL16 Jul 2025

the extension to side of existing house, permission to renovate and extend derelict cottage on site, and permission to form new entrance to site and all associated site works

The Sheehys , Roscrea , Co. Tipperary

923m
18600931CONDITIONAL24 Jul 2018

dwellinghouse, new entrance, septic tank with standard percolation area and all associated site works

Derrymore , Roscrea , Co Tipperary

950m
20686CONDITIONAL1 Jul 2020

extension to sides of existing house and all associated site works

Derrymore , Roscrea , Co. Tipperary

964m
211779CONDITIONAL9 Dec 2021

existing side extension to dwelling

Derrymore , Roscrea , Co. Tipperary

973m
17600224N/A8 Mar 2017

for change of use of existing domestic sheds with hard standing area to commercial use as a tyre centre and car valeting service

Derrymore , Roscrea , Co. Tipperary

1.0km
19601029CONDITIONAL18 Sept 2019

the construction of a proposed two storey dwelling with domestic garage, a proposed septic tank and percolation area, all associated site works including proposed upgrade to an existing site entrance

The Sheehy's , Roscrea , Co. Tipperary

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?