Proposed Development
construction of a new dwelling with attic space, new septic tank and percolation area and associated site works
View the full application file on the council's planning portal →Application Details
- Location
- Leitrim , Fadden More , Carrig Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
Timeline
- Registration Date
- 13 September 2021
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the partially constructed single storey dwelling including foundations, blockwork to wall plate level and site boundaries, and PERMISSION for the completion of the dwelling including finishing works, installation of roof, blocks, windows, doors, internal finishes, wastewater treatment system, bored well and all associated site works
Leitrim , Faddan More , Carrig
to retain existing shed
Faddan , Carrig Birr , Co. Offaly
the existing shed
Faddan , Carrig , Birr Co. Tipperary
detached domestic garage/fuel store and pumphouse as constructed and all associated site and incidental works
Fadden More , Carrig , Birr
(1) The construction of 7 no. wind turbines and associated hardstand areas with the following parameters a) total tip height range of 179.5m – 185m, b) rotor diameter range of 149m – 163m, c) hub height range of 103.5m to 110.5m; (2) 1 no. permanent 38kV electrical substation which will be constructed in the townland of Faddan Beg consisting of a single storey control building with welfare facilities, all associated electrical plant and equipment, battery energy storage system, security fencing, all associated underground cabling, wastewater holding tank and all ancillary works and equipment; (3) All works (within County Tipperary) associated with the connection of the proposed wind farm to the national electricity grid, via the provision of underground electrical cabling (38kV) to the existing Dallow 110kV substation in the townland of Clondallow, Co. Offaly; (4) Provision of 10 no. joint bays, communication chambers and earth sheath links along the underground electrical cabling route; (5) reinstatement of the road or track surface above the proposed cabling trench along existing roads and tracks; (6) all associated underground electrical and communications cabling connecting the turbines to the proposed wind farm substation; (7) 1 no. meteorological mast with a height of 107m above ground and associated foundation and hard-standing area; (8) upgrade of existing tracks and roads and the provision of new site access roads; (9) all works associated with the provision of a new permanent site entrance off the L5040 local road; (10) provision of 5 no. new access and egress points along the L5041 local road in the townlands of Cloncorig, Faddan More and Coolderry; (11) Provision of 4 no. peat repository areas and 3 no. spoil repository areas; (12) 2 no. temporary construction compounds with temporary site offices and staff facilities; (13) Accommodation works along the public road network along the N52 national secondary road in the townland of Ballyloughnane to facilitate the delivery of turbine components and other abnormal sized loads; (14) Site Drainage; (15) Tree Felling; (16) Operational stage site signage; and, (17) all associated site development works, ancillary works and apparatus. - Works within the curtilage of Protected Structures RPS Ref. TRPS336 (Ballyloughnane Bridge) and RPS Ref. TRPS519 (Croghan Bridge)
In the townlands of Croghan Clohaskin Caherhoereigh Ballykinash Tinnakilly Arragh More Ballyloughnane Faddan Beg Coolderry , Tinlough Sharragh Doughkill Ballaghgar Faddan More , Cloncorig Killeen and Cornhill Co. Tipperary
changes to original planning permission number PLC/19222 to include the relocation of a single storey extension from the side to the rear of dwelling, relocation of septic tank and percolation area from side to the rear of the dwelling and the construction of a low level stone wall within the previously approved open plan entrance all with associated site works
Ballaghgar , Carrig , Birr
changes to original planning permission number PLC/19222 to include the relocation of a single storey extension from the side to the rear of dwelling, relocation of septic tank and percolation area from side to the rear of the dwelling and the construction of a low level stone wall within the previously approved open plan entrance and amendments to original site boundaries, all with associated site works
Ballaghgar , Carrig , Birr Co. Tipperary
dwelling, entrance, garage, sewage treatment system and all ancillary works
Clonraskin , Carrig , Birr Co. Tipperary
construction of a dormer bungalow dwelling house, detached garage, wastewater treatment system, site entrance on to existing private laneway and all ancillary site works
Ballykinash , Carrig , Birr
construction of a pitched roof over the single storey portion to the rear & side of the dwelling instead of original parapet flat roof, all with associated site works. This is a variation to the original planning permission number 18600760
Clonraskin , Carrig , Birr
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?