← Back to search

Rathkeevin , Clonmel , Co. Tipperary

N/A

Planning application 21305

Tipperary - Tipperary County Council

Proposed Development

construction of a dwelling house, entrance, driveway, treatment system, percolation area and all associated site development works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    11 Mar 2021

  2. Application withdrawn

    30 Apr 2021

Application Details

Location
Rathkeevin , Clonmel , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Floor Area
170 sq m
Residential Units
1

Timeline

Registration Date
11 March 2021
Status
WITHDRAWN
Decision
N/A
Withdrawn
30 April 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

528m
23208CONDITIONAL3 Aug 2023

(1) the relocation of main entrance, provision of a secondary entrance to rear yard, provision of pedestrian entrance, modification of internal access roads, carparking and amenity pathways, (2) timber sheds, LPG tanks, waste receptacles and external generator, modification to percolation area and associated infrastructure, (3) advertising/information signage and external light columns

Rathkeevin , Clonmel , Co. Tipperary

588m
18601254CONDITIONAL17 Oct 2018

construction of new 2.4m high perimeter fencing to all boundaries, together with new 2.4m high entrance gates

Tir na nOg , Rathkeevin , Clonmel

998m
23164N/A16 Jun 2023

a 10 year planning permission for development at lands to the north of the N24 National Road in the townlands of Jamestown, Kilmolash Upper, and Rathkeevin County Tipperary. The development will consist of; Construction and operation of a c. 60MW solar PV farm consisting of solar arrays on ground mounted steel frames, with a maximum overall height of 2.6 metres; Internal underground electrical cabling and ducting; Up to 20 no. transformers; 2 no. temporary construction compounds ; security fencing and cameras; 2 no. new gated site entrances from the R687 local road; New internal access tracks; Site drainage; Landscaping; All ancillary works. Planning permission is sought for a period of 10 years with an operational life of 40 years from the date of commissioning. A Natura Impact Statement accompanies the planning application

Jamestown , Kilmolash Upper , and Rathkeevin

1.1km
2560801CONDITIONAL15 Aug 2025

the construction of a dwelling house, entrance, driveway, treatment system and all associated site development works

Rathkeevin , Clonmel , Co. Tipperary

1.2km
21551CONDITIONAL23 Apr 2021

construction of a new two storey dwelling, garage, driveway, treatment system, percolation area and new entrance and all necessary site works

Rathkeevan , Clonmel , Co. Tipperary

1.2km
20138CONDITIONAL14 Feb 2020

construction of a dwelling house, garage, driveway, treatment system, percolation area and new entrance

Rathkeevan , Clonmel , Co. Tipperary

1.3km
21522N/A19 Apr 2021

grant of outline permission reference no. 20138 for construction of a new two storey dwelling, garage, driveway, treatment system, percolation area and new entrance and all necessary site works

Rathkeevan , Clonmel , Co. Tipperary

1.4km
21254CONDITIONAL2 Mar 2021

construction of abattoir building incorporating (i) slaughter area (ii) boning & refrigeration stores (iii) hide/offal yard (v) underground effluent tanks (iv) cover crush and holding yard (vii) offices, entrance hall with hygiene lobby (viii) new entrance and driveway with car parking and hardcore and all associated site works

Garryntemple , Clonmel , Co. Tipperary

1.4km
18600380CONDITIONAL28 Mar 2018

to construct a (i) Beef shed incorporating straw lie back areas, crush area with underground effluent tanks (ii) Walled Silage slab (iii) Walled manure pit (iv) Meal bins (v) concrete yards and all associated site works. Retention of covered feeding area is also required

Garryntemple , Clonmel , Co Tipperary

1.4km
19600240CONDITIONAL15 Mar 2019

construction of an extension to existing abattoir building for (i) new Hide store (ii) New refrigeration store (iii) hide/offal yard (iv) walled concrete yard (v) underground effluent tank and all associated site works

Garryntemple , Clonmel , Co. Tipperary

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?