Sharragh Pig Farm , Lissernane , Rathcabbin Co. Tipperary
N/APlanning application 2132
Tipperary - Tipperary County Council
Proposed Development
demolition of three pig houses and erection of two pig houses on the same site and associated site works. This development was granted permission under Pl. Ref. Nos. 12/510003 and 15/600115 subject to a completion date which expired in March 2019 and which was not met due to exceptional circumstances. The pig farm has an EPA License Ref. No. PO437-02. An Environmental Impact Assessment Report (EIAR) was submitted with the original application 12/510003.
View the full application file on the council's planning portal →Application Details
- Location
- Sharragh Pig Farm , Lissernane , Rathcabbin Co. Tipperary
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Tipperary County Council
Timeline
- Registration Date
- 15 January 2021
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
3 pig houses and an associated pig loading bay and associated site works. Demolition of 3 older pig houses and the construction of 2 of the new houses on the same site as the demolished buildings. The purpose of the 3 new pig houses is to provide improved welfare standards for the existing approved pig numbers. The pig farm has an IPPC license (Ref PO437-02) An Environmental Impact Assessment Report (EIAR) and Screening Report for Appropriate Assessment will be submitted to the Planning Authority with the application.
Sharragh Pig Farm , Lissernane , Rathcabbin
farm access roads, hard standing and an open field drain (the pig farm has an EPA licence ref no. PO437-02)
Sharragh Pig Farm , Lissernane , Rathcabbin Co. Tipperary
erect three pig houses and an associated pig loading bay and associated site works. This will require the demolition of three older pig houses and the construction of two of the new houses on the same site as the demolished buildings. The purpose of the three new pig houses is to provide improved welfare standards for the existing approved pig numbers. An environmental impact assessment report (EIAR) and screening report for appropriate assessment will be submitted to the Planning Authority with the application
Sharragh Pig Farm , Lissernane , Rathcabbin
erect 7 bay calving boxes shed, slurry drain and ancillary works
Sharragh , Rathcabbin , Roscrea
(1) The construction of 7 no. wind turbines and associated hardstand areas with the following parameters a) total tip height range of 179.5m – 185m, b) rotor diameter range of 149m – 163m, c) hub height range of 103.5m to 110.5m; (2) 1 no. permanent 38kV electrical substation which will be constructed in the townland of Faddan Beg consisting of a single storey control building with welfare facilities, all associated electrical plant and equipment, battery energy storage system, security fencing, all associated underground cabling, wastewater holding tank and all ancillary works and equipment; (3) All works (within County Tipperary) associated with the connection of the proposed wind farm to the national electricity grid, via the provision of underground electrical cabling (38kV) to the existing Dallow 110kV substation in the townland of Clondallow, Co. Offaly; (4) Provision of 10 no. joint bays, communication chambers and earth sheath links along the underground electrical cabling route; (5) reinstatement of the road or track surface above the proposed cabling trench along existing roads and tracks; (6) all associated underground electrical and communications cabling connecting the turbines to the proposed wind farm substation; (7) 1 no. meteorological mast with a height of 107m above ground and associated foundation and hard-standing area; (8) upgrade of existing tracks and roads and the provision of new site access roads; (9) all works associated with the provision of a new permanent site entrance off the L5040 local road; (10) provision of 5 no. new access and egress points along the L5041 local road in the townlands of Cloncorig, Faddan More and Coolderry; (11) Provision of 4 no. peat repository areas and 3 no. spoil repository areas; (12) 2 no. temporary construction compounds with temporary site offices and staff facilities; (13) Accommodation works along the public road network along the N52 national secondary road in the townland of Ballyloughnane to facilitate the delivery of turbine components and other abnormal sized loads; (14) Site Drainage; (15) Tree Felling; (16) Operational stage site signage; and, (17) all associated site development works, ancillary works and apparatus. - Works within the curtilage of Protected Structures RPS Ref. TRPS336 (Ballyloughnane Bridge) and RPS Ref. TRPS519 (Croghan Bridge)
In the townlands of Croghan Clohaskin Caherhoereigh Ballykinash Tinnakilly Arragh More Ballyloughnane Faddan Beg Coolderry , Tinlough Sharragh Doughkill Ballaghgar Faddan More , Cloncorig Killeen and Cornhill Co. Tipperary
construction of a milking parlour, dairy, plant room, slatted cubicle shed and underground slurry storage tank along with all associated site works
Lackabrack , Aglish , Co. Tipperary
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.