← Back to search

Lacka , Carrig , Birr

CONDITIONAL

Planning application 22359

Tipperary - Tipperary County Council

Proposed Development

new storage and wood chipping shed and associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    16 May 2022

  2. Decision: CONDITIONAL

    6 Jul 2022

  3. Decision due

    10 Jul 2022

  4. Grant issued

    9 Aug 2022

Application Details

Location
Lacka , Carrig , Birr
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
1.367 ha
Floor Area
936.4 sq m
Residential Units
1

Timeline

Registration Date
16 May 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
6 July 2022
Grant Date
9 August 2022
Permission Expires
8 August 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
201323CONDITIONAL12 Nov 2020

a) entrance road and hardcore hardstand area associated with the process of wood chipping related to the felling of forestry, this development consists of the importation of timber logs onto the site and b) Permission for extension of hardstand area on the South West corner of the site and associated site works

Lacka , Carrig , Birr Co. Tipperary

582m
24277CONDITIONAL9 Dec 2024

a. additions and alterations to existing dwelling house b. domestic polydome tunnel c. domestic glasshouse and all ancillary site works

Loughkeen , Carrig , Birr

632m
25131CONDITIONAL7 Jul 2025

demolition of an existing porch to the north west and part of a single storey extension to the south east, removal of an existing chimney and the proposed construction of single storey extensions to both north west and south west with a two-storey extension to the the south east. Proposed additions and adjustments to existing window and door opes on all elevations, works to main roof, all internal modifications. Altering of site boundary and all associated site works.

Ballaghgar , Carrig , Birr

792m
2460039CONDITIONAL22 Jan 2024

the existing agricultural livestock shed. Planning Permission is also sought for the construction of: 1) an extension of the existing agricultural livestock shed, incorporating cubicles for dairy cows; 2) an agricultural shed, incorporating milking parlour, dairy, plant, storage, drafting and handling facilities; 3) a livestock holding yard and underground effluent storage (slatted) tank; 4) a meal bin silo to the south of the proposed milking parlour, and all ancillary site works thereto

Ballaghgar , Carrig , Birr Co. Tipperary

921m
2560074CONDITIONAL5 Feb 2025

the construction of an underground slurry storage tank and yard area, with associated site works

Millbrook Farm Doughkill , Carrig Birr , Co Tipperary

960m
2560139CONDITIONAL25 Feb 2025

a new dwelling house, new domestic garage, new entrance, waste water treatment system with percolation area and all associated site works

Loughkeen , Carrig , Birr

1.0km
2417CONDITIONAL2 Feb 2024

addition & alterations to existing dwelling house and all ancillary site works

Clohaskin , Carrig , Birr

1.3km
19600720N/A28 Jun 2019

build addition and alterations to existing dwelling house, install new percolation area to service existing septic tank and all ancillary site works

Ballaghgar , Carrig , Co. Tipperary

1.3km
19600786CONDITIONAL15 Jul 2019

to demolish existing domestic shed, build addition and alterations to existing dwelling house, install new percolation area to service existing septic tank and all ancillary site works

Ballaghgar , Carrig , Co. Tipperary

1.3km
25157CONDITIONAL5 Aug 2025

amendments to addition and alterations to dwelling house previously granted permission under planning reference 19600786 to include increased floor area of addition, alteration to windows/door opes, change to design of rear roof from "A" roof to hip roof and covered rear porch area

Ballaghgar , Carrig , Co. Tipperary

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?