Proposed Development

of the upgrade of an existing off-line motorway service area in order to provide a fast charge electric vehicle hub, compressed natural gas compound and dispenser, drive-thru coffee facility, new signage and all associated site works. (1.) The fast-charge electric vehicle hub involves the conversion of 14 no. existing car park spaces into fast-charging electric vehicle spaces. (2.) The compressed natural gas compound is a single storey development consisting of a compressor building (19sq.m), covered shelter (29sq.m), cooler, 3m high lighting column and associated ground works all contained with 65m of 2.4m high palisade fence with pedestrian and vehicular entrance points. A new access road to the compound is also proposed. (3.) The drive-thru coffee facillity is a single storey building (204sq.m) containing a beverage area, seating area, toilets and back-of-house area, along with an external enclosed refuse compound, car parking spaces, footpath, drive-thru lane, circulation area, landscaping and entry/exit point. (4.) The proposed new signage consists of signage relating to the proposed drive-thru coffee facility and includes a combination of free-standing signage and signage on the building and height restriction barrier (total area of 30.24sq.m of signage). (5.) All associated site development works, including new lighting.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    20 Jan 2022

  2. Application withdrawn

    25 Jan 2022

Application Details

Location
Birdhill Service Area , Junction 7 (M7) , Lackanavea
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council

Timeline

Registration Date
20 January 2022
Status
WITHDRAWN
Decision
N/A
Withdrawn
25 January 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2660784N/A12 Aug 2026

expansion of the existing service station to accommodate a new HGV and Coach parking area, vegetated infiltration basin and dog walking trail; reconfiguration of the existing parking area to provide additional staff and customer car parking; new extended canopy and provision of 3 new pumps islands; and ancillary works including: part of canopy and pump under to be removed, relocation of HVO tank and container, landscaped areas. new internal road and paths, all associated site works

Birdhill Service Area Junction 7 (M7) , Lacken Birdhill , Co. Tipperary

2m
2288CONDITIONAL4 Feb 2022

the upgrade of an existing off-line motorway service area in order to provide a fast charge electric vehicle hub, compressed natural gas compound and dispenser, drive-thru coffee facility, new signage and all associated site works 1) the fast-charge electric vehicle hub involves the conversion of 14 no. existing car park spaces into fast-charging electric vehicle spaces, 2) the compressed natural gas compound is a single storey development consisting of a compressor building (19 sq.m), covered shelter (29 sq.m), cooler, 3m high lighting column and associated ground works all contained with 65m of 2.4m high palisade fence with pedestrian and vehicular entrance points, a new access road to the compound is also proposed, 3) the drive-thru coffee facility is a single storey building (204 sq.m) containing a beverage area, seating area, toilets and back-of-house area, along with an external enclosed refuse compound, car parking spaces, footpath, drive-thru lane, circulation area, landscaping and entry/exit point, 4) the proposed new signage consists of signage relating to the proposed drive-thru coffee facility and includes a combination of free-standing signage and signage on the building and height restriction barrier (total area of 30.24 sq.m of signage), 5) all associated site development works, including new lighting

Birdhill Service Area , Junction 7 (M7) , Lackanavea Birdhill Co. Tipperary

62m
2560089N/A12 Feb 2025

a high-power electric vehicle charging hub & associated infrastructure, consisting of the following: (i) installation of 8no. electric vehicle bays & 4no. charging points (powered by renewable energy), (ii) installation of new canopy with associated illuminated signage, (iii) new modular esb substation, (iv) associated revisions to existing parking bays incl. relocation of lighting column, landscape renewal & revised parking bay markings (zevi compliant)

Applegreen Motorway Service Area , Junction 7 (M7) , Lackanavea Birdhill Co. Tipperary

62m
2560119N/A20 Feb 2025

a high-power electric vehicle charging hub & associated infrastructure, consisting of the following: (i) installation of 8no. electric vehicle bays & 4no. charging points (powered by 100% renewable energy), (ii) installation of new canopy with associated illuminated signage, (iii) new modular esb substation, (iv) landscape renewal & (v) revised parking bay markings (zevi compliant)

Applegreen Motorway Service Area , Junction 7 (M7) , Lackanavea Birdhill Co. Tipperary

82m
17600327CONDITIONAL31 Mar 2017

installation of 6 no Tesla supercharges, 12 no chargeposts, revised parking layout, signage and a new MV substation including associated equipment and services

Applegreen Birdhill Service Station , Lackanavea , Birdhill

83m
2268N/A28 Jan 2022

the upgrade of an existing off-line motorway service area in order to provide a fast charge electric vehicle hub, compressed natural gas compound and dispenser, drive-thru coffee facility, new signage and all associated site works 1) the fast-charge electric vehicle hub involves the conversion of 14 no. existing car park spaces into fast-charging electric vehicle spaces, 2) the compressed natural gas compound is a single storey development consisting of a compressor building (19 sq.m), covered shelter (29 sq.m), cooler, 3m high lighting column and associated ground works all contained with 65m of 2.4m high palisade fence with pedestrian and vehicular entrance points, a new access road to the compound is also proposed, 3) the drive-thru coffee facility is a single storey building (204 sq.m) containing a beverage area, seating area, toilets and back-of-house area, along with an external enclosed refuse compound, car parking spaces, footpath, drive-thru lane, circulation area, landscaping and entry/exit point, 4) the proposed new signage consists of signage relating to the proposed drive-thru coffee facility and includes a combination of free-standing signage and signage on the building and height restriction barrier (total area of 30.24 sq.m of signage), 5) all associated site development works, including new lighting

Birdhill Service Area , Junction 7 (M7) , Lackanavea Birdhill Co. Tipperary

83m
2560152CONDITIONAL28 Feb 2025

a high-power electric vehicle charging hub & associated infrastructure, consisting of the following: (i) installation of 8 no. electric vehicle bays & 4 no. charging points (powered by 100% renewable energy), (ii) installation of new canopy with associated illuminated signage, (iii) new modular esb substation, (iv) landscape renewal & (v) revised parking bay markings (zevi compliant).

Applegreen Motorway Service Area , Junction 7 (M7) , Lackanavea Birdhill Co. Tipperary

640m
19600004CONDITIONAL3 Jan 2019

extensions and renovations to existing dwelling house and for a new proprietary wastewater treatment system including all associated site works

Lackenavea (Ergemont) , Birdhill , Co Tipperary

645m
18601506N/A20 Dec 2018

extensions and renovations to existing dwelling house and for a new proprietary wastewater treatment system including all associated site works

Lackenavea (Ergemont) , Birdhill , Co Tipperary

735m
19600539CONDITIONAL17 May 2019

construction of a two storey domestic dwelling house, the widening of an existing site entrance, construction of a new access road and all ancillary site works, the installation of a mechanical waste water treatment system with a polishing filter

Gortybrigane , Birdhill , Co Tipperary

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?