Horsepasture , Powerstown , Clonmel Co. Tipperary

CONDITIONAL

Planning application 2260438

Tipperary - Tipperary County Council

Proposed Development

the demolition of existing two storey extesion and develop a new two storey extension to the rear of the existing dwelling

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    25 Aug 2022

  2. Decision: CONDITIONAL

    10 Oct 2022

  3. Decision due

    19 Oct 2022

  4. Grant issued

    13 Nov 2022

Application Details

Location
Horsepasture , Powerstown , Clonmel Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.18 ha

Timeline

Registration Date
25 August 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
10 October 2022
Grant Date
13 November 2022
Permission Expires
12 November 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

20m
22471N/A15 Jul 2022

the demolition of existing two storey extension and develop a new two storey extension to rear of existing dwelling and all associated site works.

Horsepasture , Clonmel , Co. Tipperary

218m
18601037CONDITIONAL23 Aug 2018

a 5 year permission for the construction of an Energy Storage Facility comprising battery containers and associated infrastructure including combined power conversion systems, grid connection compound, electrical substation, transformers and grid compliance equipment, temporary construction compound, ducting and electrical cabling, fencing, CCTV cameras, landscaping and access tracks

Horsepasture , Clonmel , Co. Tipperary

222m
2360997CONDITIONAL15 Dec 2023

a development that will consist of amending the existing consented granted application (Planning Reference: 18601037 and ABP Reference: 303718-19) at this site. The amendment application will consist of permission to amend the design of the approved development (Planning Reference: 18601037 and ABP Reference: 303718-19) which comprises consent for an Energy Storage Facility to provide services to the national grid system on a site comprising of 24 battery containers, combined power conversion system (PCS) and transformer units, associated electrical infrastructure, fencing, access track, CCTV, landscaping, and associated ancillary development. The proposed amendments include; (1) re-location of the spare parts container; (2) re-location of drainage and; (3) project lifetime proposed to be extended from 5 to 10 years. A Natura Impact Statement (NIS) was submitted with the consented application (Planning Reference: 18601037 and ABP Reference: 303718-19)

Horsepasture , Clonmel , Co. Tipperary

250m
18600996N/A9 Aug 2018

development of a 5 year permission for the construction of An Energy Storage Facility comprising battery containers and associated infrastructure including combined power conversion systems, grid connection compound, electrical substation, transformers and grid compliance equipment temporary construction compound, ducting and electrical cabling, fencing, CCTV cameras, landscaping and access tracks

Horsepasture , Clonmel , Co Tipperary

258m
2360773N/A28 Sept 2023

amending the existing consented granted application (Planning Reference: 18601037 and ABP Reference: 303718-19) to consist of (1) re-location of spare parts container; (2) re-location of drainage and; (3) project lifetime proposed to be extended from 5 to 10 years

Townland of Horsepasture , Clonmel , Co. Tipperary

272m
2660648N/A3 Jul 2026

RED III development which will consist of the provision of new electrical plant and equipment, including; 1 no. existing Arc Suppression Coil to be retired and replace with 1 no. new Arc Suppression Coil, extension to control room building (c. 27 m2), associated and ancillary outdoor electrical equipment and other apparatus, including installation of underground cables; and all other ancillary works. (This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply)

ESB Doon 110 kV Substation , Ballyvaughan , Clonmel Co. Tipperary

527m
21934N/A25 Jun 2021

development will consist of Permission to amend the design of the substation of the approved development (Planning Reference 16601136) which comprises consent for the development of a solar farm with an export capacity of 11.188 MW comprising of photovoltaic panels on ground mounted frames with associated infrastructure including 7 no. invertor housing cabins, 1 no. control building, 1 no. customer cabin (substation), 1 no. DNO substation, temporary construction compound, ducting and electrical cabling, perimeter agricultural fencing, mounted CCTV cameras and internal access tracks

Horsepasture/Doon , Clonmel , Co. Tipperary

553m
21993N/A9 Jul 2021

to amend the design of the substation of the approved development (Planning Reference 16601136) which comprises consent for the development of a solar farm with an export capacity of 11.188 MW comprising of photovoltaic panels on ground mounted frames with associated infrastructure including 7 no. invertor housing cabins, 1 no. control building, 1 no. customer cabin (substation), 1 no. DNO substation, temporary construction compound, ducting and electrical cabling, perimeter agricultural fencing, mounted CCTV cameras and internal access tracks

Horsepasture/Doon , Clonmel , Co. Tipperary

573m
211051CONDITIONAL21 Jul 2021

to amend the design of the substation of the approved development (Planning Reference 16601136) which comprises consent for the development of a solar farm with an export capacity of 11.188 MW comprising of photovoltaic panels on ground mounted frames with associated infrastructure including 7 no. invertor housing cabins, 1 no. control building, 1 no. customer cabin (substation), 1 no. DNO substation, temporary construction compound, ducting and electrical cabling, perimeter agricultural fencing, mounted CCTV cameras and internal access tracks

Horsepasture/Doon , Clonmel , Co. Tipperary

700m
20533CONDITIONAL29 May 2020

construction of a new single storey entry porch to the front elevation of the existing single storey dwelling, alterations to elevations and associated site boundary and site development works

Powerstown , Clonmel , Co. Tipperary