← Back to search

Toureen , Cahir , Co. Tipperary

N/A

Planning application 2260630

Tipperary - Tipperary County Council

Proposed Development

(i) slatted shed with underground effluent tank (ii) agricultural entrance with new boundary wall. Demolition of existing loose shed is also required and Permission for (i) Loose area with crush, underground effluent tank and all associated site works

View the full application file on the council's planning portal →

Application Details

Location
Toureen , Cahir , Co. Tipperary.
Applicant
N/A
Application Type
RETENTION
Planning Authority
Tipperary County Council
Site Area
0.25 ha

Timeline

Registration Date
17 November 2022
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

5m
2260653N/A28 Nov 2022

the construction of a loose area with crush, underground effluent tank and all associated site works. Permission for Retention is also being sought for (i) a slatted shed with underground effluent tank (ii) an agricultural entrance with new boundary wall. Demolition of existing loose shed is also required

Toureen , Cahir , Co. Tipperary.

9m
2260677CONDITIONAL8 Dec 2022

the construction of (i) Loose shed with crush, underground effluent tank and all associated site works. permission for the demolition of existing loose shed is also required. Permission for retention is also being sought for (i) slatted shed with underground effluent tank (ii) agricultural entrance with new boundary wall

Toureen , Cahir , Co. Tipperary

60m
17601060CONDITIONAL26 Sept 2017

the following development (a) demolition of existing single storey outhouses to the north and existing extension to rear, (b) construction of part single storey and part storey and half extension to rear of existing house with packaged waste water treatment system and polishing filter, (c) external and internal alterations to existing house, (d) new vehicular entrance and associated site boundary and site development works, the existing dwelling is a Protected Structure - Ref No. S1030 in the South Tipperary County Development Plan 2009

Toureen , Cahir , Co. Tipperary

92m
2260230N/A16 May 2022

a new two-storey dwelling, a new site entrance and driveway, a new waste-water treatment system, percolation area, and all necessary services and site works

Toureen , Cahir , Co. Tipperary

101m
22369CONDITIONAL20 May 2022

a new two- storey dwelling, new site entrance and driveway, new waste-water treatment system percolation area and all necessary services and site works.

Toureen , Cahir , Co. Tipperary

101m
2460727CONDITIONAL2 Sept 2024

the alterations and amendments to the following items granted under planning reference number 22369: to amend house type and location of dwelling on original site and the addition of a garage structure, complete with all associated site works and necessary services to serve proposed dwelling

Toureen , Cahir , Co. Tipperary

835m
17601004CONDITIONAL11 Sept 2017

to retain indefinitely the conservatory to the side of my dwelling and retention of single storey domestic garage and planning permission to install a domestic effluent treatment system with percolation area and all associated works

Ballydrehid , Cahir , Co Tipperary

870m
19600359CONDITIONAL10 Apr 2019

dwelling, garage, effluent treatment system, entrance and all associated site works

Kilmoyler , Cahir , Co. Tipperary

893m
2460349CONDITIONAL8 May 2024

the existing extension to the rear of the dwelling and PERMISSION for the construction of a new extension to the side of the existing dwelling along with all associated site works

Brook Cottage , Toureen Cahir , Co. Tipperary

978m
201363CONDITIONAL18 Nov 2020

erection of a two story extension to the front of my existing dwelling, extend upwards the existing front of house flat roofed extension to create a two story extension and to reconstruct the existing dwelling to suit the new developments. I wish to carry out all the above and all ancillary site works

Bhindi , Ballydrehid Kilmoyler , Cahir

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?