← Back to search

Newpark (Fussough) , Dualla Cashel , Co. Tipperary

CONDITIONAL

Planning application 2260679

Tipperary - Tipperary County Council

Proposed Development

construction of a 400m running track, perimeter walking track, long jump & external exercise area. Reconfiguration of existing soccer field, provision of pitch drainage, and two new dugouts. Construction of a precast hurling wall, training area & basketball court, enclosed by a 2.4 meter high weld-mesh fence and 2.6 meter netting on top. Flood lighting and associated site lighting, site boundary & site development works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    8 Dec 2022

  2. Further information requested

    26 Jan 2023

  3. Further information received

    18 Jul 2023

  4. Decision: CONDITIONAL

    10 Aug 2023

  5. Decision due

    14 Aug 2023

  6. Grant issued

    13 Sept 2023

Application Details

Location
Newpark (Fussough) , Dualla Cashel , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
1.88 ha

Timeline

Registration Date
8 December 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
10 August 2023
Grant Date
13 September 2023
Permission Expires
12 September 2028

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

99m
19600305N/A29 Mar 2019

erection of a portacabin for sessional use for childcare facilities including after school care from 7.30 a.m. to 9.10 a.m. (ages 4-12 yrs), preschool care from 9.20 a.m. to 12.20 p.m. (ages 2.5-5 yrs) and after school care from 2.00 p.m. to 6.00 p.m. (ages 4-12 yrs) Monday to Friday, connection to on-site wastewater treatment system and for all associated works

Dualla Community Centre , Newpark (Fussough) , Dualla Cashel

103m
19600371CONDITIONAL12 Apr 2019

erection of a portacabin for sessional use for childcare facilities including after school care from 7.30 a.m. to 9.10 a.m. (ages 4-12 yrs), preschool care from 9.20 a.m. to 12.20 p.m. (ages 2.5-5 yrs) and after school care from 2.00 p.m. to 6.00 p.m. (ages 4-12 yrs) Monday to Friday, connection to on-site wastewater treatment system and for all associated works

Dualla Community Centre , Newpark (Fussough) , Dualla Cashel

165m
2360632CONDITIONAL17 Aug 2023

installation of a 200m3 reservoir, chlorine booster facility incorporating control kiosk, and inspection chambers on the existing Dualla water treatment plant site

Dualla , Cashel , Co. Tipperary

277m
2461014N/A28 Nov 2024

the construction of a residential development consisting of five two-storey detached dwellings plus one single storey detached dwelling, each dwelling to be served by individual waste water treatment systems, a new site entrance plus all associated site services, site enclosures and site works

Fussough , Co. Tipperary

288m
2460975N/A13 Nov 2024

the construction of a residential development consisting of five two-storey detached dwellings and one single storey detached dwelling, new site entrance plus all associated site enclosures and site works

Dualla , Cashel , Co. Tipperary

427m
20522CONDITIONAL27 May 2020

(i) reorganise the existing entrances to the car park from 3 no. existing entrances to a single entrance and a single exit, (ii) install a new surface water infiltration system, (iii) resurface the existing carpark with new parking layout, (iv) erect new car park lighting - and all associated site works

Rathclogh North , Dually , Cashel

429m
19600691CONDITIONAL24 Jun 2019

proposed new ground floor and first floor level extensions to existing dwelling, associated alterations to existing dwelling and all associated site works

No. 2 Rathclough , Dualla , Cashel

429m
201127CONDITIONAL2 Oct 2020

minor elevational change to previously granted permission (ref no. 19600691) with all associated site work

No. 2 Rathclough , Dualla , Cashel

435m
18601319REFUSED1 Nov 2018

erection of a portacabin for sessional use for childcare facilities including before school care from 7.30 a.m. to 9.10 a.m. (ages 4-12 yrs), preschool care from 9.20 a.m. to 12.20 p.m. (ages 2.5-5 yrs) and after school care from 2.00 p.m. to 6.00 p.m. (ages 4-12 yrs) Monday to Friday, connect to public services and all associated works in the curtilage

No. 13 Lios Dubhaile , Dualla Village , Co. Tipperary

443m
201384CONDITIONAL23 Nov 2020

the domestic garage/shed and associated works as constructed at the rear of my dwelling house

4 Rathclogh , Dualla , Cashel

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?