← Back to search

Dromineer Quay , Dromineer , Co. Tipperary

CONDITIONAL

Planning application 23263

Tipperary - Tipperary County Council

Proposed Development

a mobile container unit incorporating a shop, changing area and booking office - the development is adjacent to a protected structure reference TRPS569

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    4 Oct 2023

  2. Further information requested

    20 Nov 2023

  3. Further information received

    20 Dec 2023

  4. Decision: CONDITIONAL

    19 Jan 2024

  5. Decision due

    25 Jan 2024

  6. Grant issued

    22 Feb 2024

Application Details

Location
Dromineer Quay , Dromineer , Co. Tipperary
Applicant
N/A
Application Type
RETENTION
Planning Authority
Tipperary County Council

Timeline

Registration Date
4 October 2023
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
19 January 2024
Grant Date
22 February 2024
Permission Expires
21 February 2029

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

3m
23249N/A21 Sept 2023

a mobile container unit incorporating a shop, changing areas and lifeguard room (on a seasonal basis from April to October inclusive)

Dromineer Quay , Dromineer , Co. Tipperary

6m
2260155CONDITIONAL1 Apr 2022

the seasonal installation of a timber canoe and SUP storage platform and jetty from 1st May to 14th September which will be installed in conjunction with the inflatable water park and mobile service unit granted permission under Planning Ref. No. 17600541, including all associated site works. A Natura Impact Statement (NIS) has been prepared and will be submitted to the authority with the application.

Dromineer Quay , Dromineer , Co Tipperary

27m
17600541CONDITIONAL16 May 2017

on a seasonal basis from April to October inclusive, inflatable water park which includes inflatable water trampoline, inflatable climbing frames, inflatable water slides, inflatable blast bag, inflatable platforms, inflatable booms and mobile service unit

Dromineer Harbour , Dromineer

34m
2660452N/A16 May 2026

the provision of a 25m² Wooden Gazebo and all associated works necessary to facilitate the development including landscaping and lighting

Dromineer Harbour , Dromineer , Nenagh

34m
2660577N/A14 Jun 2026

the provision of a 25m² wooden gazebo and all associated works necessary to facilitate the development including landscaping and lighting

Dromineer Harbour , Dromineer , Nenagh

83m
24118N/A22 May 2024

installation of a new floating jetty, which will consist of five new finger pontoons along with an adjoining new end jetty in the inner harbour. The plan includes the relocation of an existing refurbished foul-water pump-out on the existing harbour breakwater to a more accessible and more effective location

Dromineer Harbour , Dromineer , Co. Tipperary

97m
24203N/A6 Sept 2024

installation of new floating jetty which will consist of 5 new finger pontoons along with an adjoining new end jetty in inner harbour

Dromineer Harbour , Dromineer , Co. Tipperary

98m
24164N/A19 Jul 2024

development of a proposed floating moorings and wastewater pump-out, the proposed works involve the installation of a new floating jetty, which will consist of five new finger pontoons along with an adjoining new end jetty in the inner harbour, the plan includes the relocation and replacement of the existing refurbished foul water pump-out on the existing inner harbour wall with a new facility in a more accessible location on the harbour breakwater wall

Dromineer Harbour , Dromineer , Co. Tipperary

196m
2560167N/A4 Mar 2025

minor modifications to the granted planning permission (Ref. No. 2360651). The modifications will consist of the following: mixed-use building, additional below-ground back-of-house and plant space at lower ground floor level, additional plant space within the roof areas including screening, minor internal space modifications and adjustments at upper ground floor level resulting in ca 43sqm of additional area, minor modifications to elevations reflecting layout changes. Terrace units: internal layout modifications allowing for subdivisions and interconnection of bedrooms resulting in the potential to provide 3 additional bedrooms with an area increase of approximately 10sqm, minor modifications to elevations reflecting layout changes. Apartment Units: internal layout amendments to a block of Type 1 apartment units, allowing for subdivisions and interconnection of bedrooms, resulting in the potential to provide 4 additional bedrooms, with minor modifications to elevation windows reflecting layout changes, internal layout amendments to a block of Type 2 apartment units, allowing for subdivisions and interconnection of bedrooms, resulting in the potential to provide 3 additional bedrooms with minor modifications to elevation windows reflecting layout changes. Existing Waterside Cottages: 6no additional single-story extensions to houses No. 5,6,8,9,10 and 11, accommodating en-suite bathrooms. All associated site development works

Dromineer Bay Hotel and Waterside Cottages , Dromineer , Nenagh

226m
2360651CONDITIONAL23 Aug 2023

a redevelopment of the former Domineer Bay Hotel site and, modification and development within the adjacent (‘Waterside Cottages’) holiday home complex to provide for a mixed-use commercial and tourism enterprises and, provision of new associated short-stay tourism accommodation. The proposed development includes; 1.Demolition of existing hotel structure and adjacent reception building and shed and construction of a two-storey mixed use building comprising of; (i) event spaces with ancillary reception/lobby, office, bar, kitchen and associated stores and WC facilities; (ii) 1 no. tourism related retail/commercial space; (iii) 1 no. restaurant with associated kitchen, stores, staff changing and WC; (iv) 1 no. retail unit; (v) 1 no. café; and (vi) external terrace; 2.Provision of new accommodation intended for tourism use associated with the proposed events spaces and the existing holiday home complex (‘Waterside Cottages’) including construction of: (i) 6 no. 1-bed, 2-storey terrace units, and (ii) 14 no. 1-bed apartments comprising: (a) one 2-storey block consisting of 6 no. 1-bed apartment units, and (b) one 2-storey block consisting of 8 no. 1-bed apartment units; 3.Modifications to existing holiday houses and complex (‘Waterside Cottages’) to enhance accommodation provision in the form of: (i) Provision of single-storey extension to rear elevation of existing holiday house Nos. 1, 2, 4 and 7; (ii) Provision of 2-storey extension to side elevation of existing holiday house Nos. 3, 4, 6 and 10; and (iii) modifications to internal access road, parking and amenity area arrangements; 4.Construction of new vehicular access from the public road (R495) with provision of additional parking; 5.Reconfiguration of existing car parking area associated with the former hotel located on the northern side of the hotel building; 6.Enhancement of existing surface water arrangements including provision of surface water attenuation system within the northern carpark and provision of petrol interceptor; 7.Landscaping, signage and all associated site development works. A Natura Impact Statement has been submitted.

DROMINEER BAY HOTEL , AND WATERSIDE COTTAGES , DROMINEER

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?