← Back to search

Erinagh , Capparoe , Nenagh

CONDITIONAL

Planning application 2360679

Tipperary - Tipperary County Council

Proposed Development

an extension to existing house and upgrade of the wastewater treatment system

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    29 Aug 2023

  2. Decision: CONDITIONAL

    18 Oct 2023

  3. Decision due

    23 Oct 2023

  4. Grant issued

    21 Nov 2023

Application Details

Location
Erinagh , Capparoe , Nenagh
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.35 ha

Timeline

Registration Date
29 August 2023
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
18 October 2023
Grant Date
21 November 2023
Permission Expires
20 November 2028

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

226m
2460887N/A16 Oct 2024

a two-storey pitched roof extension at the rear, featuring three dormer windows. The attic level will include three new bedrooms, two of which will have en-suite bathrooms. The ground floor will comprise a new kitchen area, utility room, pantry, and sitting room. A single-storey pitched roof extension will link the existing building to the new two-storey extension, creating a new hallway and incorporating a disabled WC and a bathroom. Additionally, there will be two gable windows on the new attic level, one on each side

Boherbaun Capparoe , Nenagh , Co. Tipperary

234m
2460932N/A31 Oct 2024

a two-storey pitched roof extension to the rear of the existing dwelling, including three dormer windows at attic level. The attic level will contain three new bedrooms (two en-suite). The ground floor will feature a new kitchen, utility room, pantry, and sitting room. A single-storey pitched roof extension will link the existing dwelling to the new two-storey extension, incorporating a new hallway, a bathroom, and a disabled WC. The attic level will include two gable windows (one on each side). Installation of a new wastewater treatment system, including a septic tank and percolation area, along with a new soakaway

Boherbaun Capparoe , Nenagh , Co. Tipperary

234m
2461094CONDITIONAL12 Dec 2024

two-storey pitched roof extension to the rear of the existing dwelling, including three dormer windows at attic level. The attic level will contain three new bedrooms (two en-suite). The ground floor will feature a new kitchen, utility room, pantry, and sitting room. A single-storey pitched roof extension will link the existing dwelling to the new two-storey extension, incorporating a new hallway, a bathroom, and a disabled WC. The attic level will include two gable windows (one on each side). Installation of a new wastewater treatment system, including a septic tank and percolation area, along with a new soakaway

Boherbaun Capparoe , Nenagh , Co. Tipperary

234m
2660716N/A23 Jul 2026

change of design to extension to existing house granted under Planning Ref. No. 2461094

Boherbaun , Capparoe , Nenagh Co. Tipperary

477m
211178CONDITIONAL11 Aug 2021

construction of a part two storey/part single storey dwelling house, garage ancillary to dwelling, septic tank and percolation area, new entrance from public road, all associated site works thereto

Gortnacleha , Capparoe , Nenagh Co. Tipperary

589m
211039CONDITIONAL16 Jul 2021

construction of a storey-and-half dwelling house, detached garage, wastewater treatment system, site entrance and all ancillary site works

Erinagh , Capparoe , Nenagh

663m
2660776N/A10 Aug 2026

partial demolition to the rear of the existing building and the construction of a 4-bed dwelling and also a driveway, landscaping, septic tank and percolation system and all associated site works and services.

Cranahurt Capparoe , Nenagh , County Tipperary

667m
21874UNCONDITIONAL15 Jun 2021

an extension to dwellinghouse, construct garage, septic tank treatment system, percolation area and a new entrance and all ancillary site works

Erinagh , Capparoe , Nenagh Co. Tipperary

678m
23174CONDITIONAL23 Jun 2023

domestic extension at rear of dwelling, with attic storage over & domestic garage at side of same dwelling

Erinagh , Capparoe , Nenagh

679m
2360436CONDITIONAL20 Jun 2023

house, carport and storage sheds as constructed

Cloonanagh , Capparoe , Nenagh

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?