18 Main Street , Templemore , Co. Tipperary
CONDITIONALPlanning application 2360861
Tipperary - Tipperary County Council
Proposed Development
(1) the demolition of an existing two storey rear extension and an existing shed (2) the construction of a new two storey rear extension together with all associated works
View the full application file on the council's planning portal →Application Timeline
Application received
26 Oct 2023
Decision: CONDITIONAL
19 Dec 2023
Decision due
20 Dec 2023
Grant issued
31 Jan 2024
Application Details
- Location
- 18 Main Street , Templemore , Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.018 ha
Timeline
- Registration Date
- 26 October 2023
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 19 December 2023
- Grant Date
- 31 January 2024
- Permission Expires
- 30 January 2029
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
installation of PV panels and associated works to the south elevation roof of my dwelling
18 Main Street , Templemore , Co. Tipperary.
changes to front elevation of property to include a new shop front and associated site works
104 Main Street , Templemore , Co Tipperary
change of use of part of existing premises from retail to a delicatessen shop to include a new shop front, new signage and associated site works
104 Main Street , Templemore , Co Tipperary
change of use of part of existing premises from retail to a delicatessen shop to include a new shop front, new signage and associated site works
104 Main Street , Templemore , Co Tipperary
changes to front elevation of property to include a new shop front and associated site works
104 Main Street , Templemore , Co Tipperary
change of use of the ground floor from retail to residential together with associated works
111 Main St. , Templemore , Co. Tipperary
a) dismantling and removal of existing ‘Shortt’s’ three-level shop, residence and out-offices and adjoining three-level residence, out-offices and walls (formally known as ‘Prout’s’), removal of boundary wall to laneway, b) formation of an opening in the Town Park wall adjacent to the heritage gate piers to Town Park to provide for a pedestrian pathway through and to improve vehicular sight-lines, c) widening of laneway to become a street with footpath, short spur road at the north end of the site, d) form a ‘pedestrian permeability’ link to ‘Pickfoot Lane’ from the proposed development, e) conservation works to a section to what is known locally as the ‘Famine Cottage’ wall; f), surface water drainage system with attenuated disposal to percolation on site, foul effluent drainage system discharging to existing public foul sewerage system, water and fire hydrant connections to existing public water supply, site lighting, g) car parking and green area at spur road, h) contribution to cost of 2 no. ‘accessible’ car park spaces at frontage to Main Street payable to the Local Authority, I) small mono-pitch single-storey estate maintenance store building on the spur road; j) 8 no. 2 bedroom apartments, and 4 no. 1 bedroom apartments and 10 no. 2 storey 2 bedroom dwellings k) private utility open space to rear of apartment building, clothes lines, bicycle parking, single-storey waste management building, small yard, side gate and boundary walls; l) associated hard and soft landscaping, etc.
Main Street / Townparks , Templemore , Co. Tipperary
the change of use of existing disused public house to creche on the ground floor and from residential to creche on the first and second floors to include the following: (A). Demolition/removal of existing internal walls, external fire escape stairs, walls and roof from existing sheds, existing flat roof to rear (B). Construction of extension to rear to provide proposed fire escape stairs & lift (C). Construction of new internal walls (D). Change of use of existing shed 1 to staff area (E). Change of use of existing shed 2 to toddler/sleeping area (F). Change of use of existing shed 3 to after school recreational area (G). Construction of extension to link existing building to shed 2 (H). Block up existing door way and create new door opening on east elevation (I). Erect proposed signage and all associated site works
Main Street , Templemore , Co Tipperary
installation of an external access stairs to the rear of property including all associated site works
119 Main Street , Templemore , Co. Tipperary
the installation and erection of a 11.4kw PV solar panel system and associated site works to the rear south facing external roof
Main Street , Templemore , Co Tipperary
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?