Knockmaroe , Milestone , Thurles
CONDITIONALPlanning application 24158
Tipperary - Tipperary County Council
Proposed Development
to relocate entrance, renovate existing dwelling, construction of a new single storey extension, new septic tank, percolation area and all associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
12 Jul 2024
Further information requested
26 Aug 2024
Further information received
7 Oct 2024
Decision: CONDITIONAL
10 Dec 2024
Decision due
17 Dec 2024
Grant issued
29 Jan 2025
Application Details
- Location
- Knockmaroe , Milestone , Thurles
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
Timeline
- Registration Date
- 12 July 2024
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 10 December 2024
- Grant Date
- 29 January 2025
- Permission Expires
- 28 January 2030
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the construction of an entrance, dwelling house, garage, private well, septic tank & percolation area together with all associated site works
Knockmaroe , Milestone , Thurles
the construction of a new longitudinal loading bay adjacent to the western side of the existing public road for temporary forest use. The longitudinal loading bay has been designed as per COFORD forest road manual and will comprise clear visibility sightlines, associated setting back of adjacent roadside boundaries, provision of associated surface water drainage and all associated siteworks
Knockduff , Milestone , Thurles
one permanent meteorological mast 35m in height and associated infrastructure
Knockcurraghbola , Crownlands , Co. Tipperary
one permanent meteorological mast 35m in height and associated infrastructure
Knockcurraghbola , Crownlands Milestone , Thurles
for an existing 30 metre telecommunications support structure carrying associated equipment, associated equipment shelters, fencing and access track. The development forms part of Vodafone Ireland Ltd's existing GSM and 3G Broadband telecommunications network
Knockmaroe , Milestone , Thurles
to extend and renovate existing house and shed, upgrade wastewater treatment system and entrance along with all ancillary site works
Graniera , Milestone Cross , Upperchurch Co. Tipperary
construction of an extension to existing dwelling house together with all associated site works
Graniera , Milestone Cross , Upperchurch
a dwelling, garage, wastewater treatment system, polishing filter, entrance and all associated site works
Loughbrck Kilcommon , Thurles , Co. Tipperary
amendments to Upperchurch Windfarm Electrical Substation, authorised under An Bord Pleanala ref no PL.22.243040; Tipperary County Council REF: NO. 13/510003. The amendments consist of: a) Increase in size of the Substation compound yard; b) Change to the layout of Electrical equipment in the substation compound yard; c) Change in size, deisgn and increase in height of the two Control Buildings and d) Ancillary works. The application is accompanied by an Appropriate Assessment Report (Stage 1 - screening) and screening for Environmental Impact Assessment (EIA) Report
Knockcurraghbola Commons , Co. Tipperary
the amendments to Upperchurch Windfarm Electrical Substation authorised under An Bord Pleanála Ref. No. Pl.22.243040 and PA92.310171. The amendments consist of a) increase in size of the substation compound yard; b) change to the layout of electrical equipment in the substation compound yard; c) change in size, design and increase in height of the two control buildings and d) ancillary works. The application is accompanied by an Appropriate Assessment Report (stage 1 – screening) and screening for Environmental Impact Assessment (EIA) report
Knockcurraghbola Commons , Upperchurch , Co. Tipperary
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?