← Back to search

Garrane , Templederry , Nenagh Co. Tipperary

CONDITIONAL

Planning application 2460161

Tipperary - Tipperary County Council

Proposed Development

the construction of a new machinery storage shed

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    4 Mar 2024

  2. Further information requested

    18 Apr 2024

  3. Further information received

    13 Jun 2024

  4. Decision: CONDITIONAL

    27 Jun 2024

  5. Decision due

    10 Jul 2024

  6. Grant issued

    31 Jul 2024

Application Details

Location
Garrane , Templederry , Nenagh Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.368 ha

Timeline

Registration Date
4 March 2024
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
27 June 2024
Grant Date
31 July 2024
Permission Expires
30 July 2029

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

20m
2460146N/A29 Feb 2024

construction of a new machinery storage shed

Gurrane , Templederry , Nenagh Co. Tipperary

60m
2660717N/A23 Jul 2026

development which will consist of planning permission for the continuance of use of the existing concrete batching plant (the concrete batching plant was previously granted for a 20-year period under Planning Application Reference Number 06510088)

Lands at the existing Sand and gravel Pit , Garrane , Templederry Nenagh

239m
2553REFUSED4 Apr 2025

extension to existing sand and gravel pit and all associated site works

Garrane , Templederry , Co. Tipperary

416m
21373CONDITIONAL25 Mar 2021

construction of a two storey dwelling house, site entrance, potable well, installation of a waste water treatment system and all ancillary site works

Garrane , Templederry , Nenagh Co. Tipperary

429m
21929CONDITIONAL25 Jun 2021

a 2.4 hectare extension to an existing sand and gravel pit which will be subject to extraction of sand and gravel material; transport of material to the existing pit for processing into various grades of aggregate; landscaping and restoration and all associated ancillary facilities and works

Garrane , Templederry , Nenagh Co. Tipperary

431m
18601404CONDITIONAL27 Nov 2018

the construction of a two storey dwelling house, site entrance, garage, potable well, installation of septic tank and percolation area, the removal of 2 no existing floor slabs and all ancillary site works

Garrane , Templederry , Nenagh

502m
2360479CONDITIONAL30 Jun 2023

the construction of a new entrance and all associated site works

Gurrrane , Templederry , Nenagh Co. Tipperary

502m
2660325CONDITIONAL16 Apr 2026

a change of design of dwelling granted under planning reference no. 2560776

Falleeny , Templederry , Nenagh Co. Tipperary

502m
2560776CONDITIONAL8 Aug 2025

construction of a dwelling house, garage, wastewater treatment system, entrance, driveway along with all ancillary site works

Falleeny , Templederry , Nenagh Co. Tipperary

504m
2260745CONDITIONAL28 Dec 2022

the construction of a dwelling house, garage, wastewater treatment system, entrance, driveway along with all ancillary site works

Falleeny , Templederry , Nenagh

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?