← Back to search

Ballycorrigan , Ballina , Co Tipperary

N/A

Planning application 2460420

Tipperary - Tipperary County Council

Proposed Development

stable building and associated site works and PERMISSION for construction of an access lane and new entrance onto a private lane and associated works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    30 May 2024

  2. Further information requested

    11 Jul 2024

  3. Further information received

    3 Oct 2024

  4. Application withdrawn

    22 Nov 2024

  5. Decision due

    26 Nov 2024

Application Details

Location
Ballycorrigan , Ballina , Co Tipperary
Applicant
N/A
Application Type
RETENTION
Planning Authority
Tipperary County Council
Site Area
0.085 ha

Timeline

Registration Date
30 May 2024Other applications received that week
Status
WITHDRAWN
Decision
N/A
Decision Due
26 November 2024
Withdrawn
22 November 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1.1km
17121N/A21 Feb 2017

to locate a cabin ( 10 x 20 ft) on a parking space on the Waterways Ireland property between the Waters, Killaloe, Co. Clare on a temporary basis from 1st May until 30th September 2017. This site will serve as an operational base for Soulkite/Soul SUP.

The Mill Yard , Killaloe , Co. Clare

1.1km
2437CONDITIONAL8 Feb 2024

to locate a cabin (10*20 ft) on a parking space on the Waterways Ireland property at Mill Yard between the Water, Killaloe Co Clare, on a temporary basis from 1st May 2024 until 30th September 2026. This site will serve as an operational base for My Next Adventure

Killaloe , Co Clare

1.1km
17162CONDITIONAL6 Mar 2017

to locate a cabin ( 10 x 20 ft )on a parking space on the Waterways Ireland property between the Waters, Killaloe, Co. Clare on a temporary basis from 1st May until 30th September 2017. This site will serve as an operational base for Soulkite/Soul SUP.

The Mill Yard , Killaloe , Co. Clare

1.1km
18108CONDITIONAL15 Feb 2018

to locate a cabin ( 10 x 20 ft ) on a parking space on the Waterways Ireland property between the Waters, Killaloe, Co. Clare on a temporary basis from 1st May until 30th September, 2018. This site will serve as an operational base for Soulkite

Killaloe , Co. Clare

1.1km
17336CONDITIONAL8 May 2017

to construct a private single boat berth, associated landscaping and site works. A Natura Impact Statement has been prepared in respect of the proposed development and submitted with this application

Abbey Street , Killaloe , Co. Clare

1.1km
2660646N/A5 Oct 2026

the development will consist of 1 no. external universal access ramp and an internal timber screen and lobby inside the main door; incorporating a draught lobby, WCs, access ramp and servery. St Flannan's Cathedral is a protected structure RPS no. 153.

St Flannan's Cathedral , Killaloe , Co Clare

1.1km
2360462CONDITIONAL3 Nov 2023

for development which will consist of 1 no. external universal access ramp and 2 no. internal universal access ramps. St. Flannan's Cathedral is a protected structure RPS no. 153.

St. Flannan's Cathedral , Killaloe , Co. Clare

1.1km
2660551N/A24 Aug 2026

the development will consist of 1 no. external universal access ramp and an internal timber screen and lobby inside the main door; incorporating a draught lobby, WCs, access ramp and servery. St Flannan's Cathedral is a protected structure RPS no. 153

St Flannan's Cathedral , Killaloe , Co. Clare

1.1km
17713CONDITIONAL21 Sept 2017

to redevelop and extend existing Bakers Cottage to comprise a 1 bed granny flat and associated site works. The proposed site is within the curtilage of protected Structure RPS No. 439 as identified in the Clare County Development Plan 2017-2023

Abbey Street , Killaloe , Co. Clare

1.2km
17591N/A1 Aug 2017

to redevelop and extend existing Bakers Cottage to comprise of 1 bed granny flat and associated site works . The proposed is within the curtilage of Protected Structure ROS No. 439 as identified in the Clare County Development Plan 2017-2023

Abbey Street , Killaloe , Co. Clare

The submission window has closed

Observations on this application closed on Wednesday 3 July 2024, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?