Gortmore , Cahir Road , Clonmel Co. Tipperary
CONDITIONALPlanning application 2461092
Tipperary - Tipperary County Council
Proposed Development
construction of new single storey extension to rear of dwelling, new entrance porch to front of dwelling, external insulation and roof coverings, new replacement waste-water treatment system and percolation area and all necessary site works and services
View the full application file on the council's planning portal →Application Timeline
Application received
12 Dec 2024
Further information requested
12 Feb 2025
Further information received
18 Feb 2025
Decision: CONDITIONAL
25 Feb 2025
Decision due
17 Mar 2025
Grant issued
31 Mar 2025
Application Details
- Location
- Gortmore , Cahir Road , Clonmel Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.15 ha
Timeline
- Registration Date
- 12 December 2024
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 25 February 2025
- Grant Date
- 31 March 2025
- Permission Expires
- 30 March 2030
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the use of existing building for tyre sales and all associated signage and ancillary site development works
Abbey Farm , Inishlounaght , Clonmel
advanced building solution consisting of office and light industrial/production spaces. Permission is also sought for vehicular/pedestrian entrance, signage, car parking, cycle shelters, landscaping, underground water storage tank, independent ESB substation & switch room building, central utility building, external plant compound, access road and all associated site works
Ballingarrane Business Science & Technology Campus , Ballingarrane , Clonmel
(a) retention of a concrete floor and rising walls, and (b) Permission to construct an agricultural storage shed over same and all associated site development works
Abbeyfarm , Inishlounaght , Marlfield Clonmel
the construction of an extension to the existing agricultural storage shed and all associated site development works
Abbey Farm , Inishlounaght , Clonmel
construct an agricultural shed and all associated site development works
Abbey Farm , Inishlounaght , Clonmel
a family entertainment centre auxiliary to the existing hotel including all external signage, the installation of photovoltaic panels on the roof structure
Poppyfield Retail Park , Ballingarrane South , Clonmel
the proposed development which will consist of the following on a site with a total area of c.3.13ha: - 96 no. (semi-detached, detached, and terraced) houses comprising 7 no. 2-bed houses, 53 no. 3-bed houses and 36 no. 4-bed houses; - A two-storey childcare facility with a total gross floor area of c. 369 sq.m and an associated outdoor play area of c. 257 sq.m; - The provision of public open space comprising 3 no. spaces including play equipment, and the provision of private open space for the proposed houses; - A total of 206 no. car parking spaces comprising 185. no. residential spaces, 8. no. visitor spaces, 6 no. creche staff parking spaces and 7 no. creche drop off spaces; - Vehicular site access to the northeast of the site to the north of the existing residential area of Gort na Manach, and a pedestrian connectivity link along the eastern boundary to the existing residential area of Gort na Manach. Provision for 2 no. potential future access links on the southeastern and western boundaries. - The proposed development also includes all associated landscaping and planting, boundary treatments, road and cycle infrastructure, bicycle parking for residents, visitors, and the childcare facility, scooter parking, EV parking and ducting, public lighting, drainage works, SuDS features and all associated and ancillary site development works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application and the NIS will be available for inspection or purchase for a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority.
Abbey Farm in the townlands of Inishlounaght and Ballingarrane South , to the south of Cahir Road (R707) and to the west of the Gort Na Manach estate , Clonmel
retain the as constructed vehicular entrance and Permission to complete same including all associated site development works
Patrickswell , Clonmel , Co. Tipperary
an Electric Vehicle (EV) Charging Station, a site of ca. 0.017ha. The development will consist of 4 no. EV charging stations, each serving 2 no. vehicle charging bays, a total of 8 no. charging points. The charging bays will be located in the existing car park replacing 10 no. standard parking bays with 8 no. EV charging bays. It is proposed to erect an ancillary building to house an ESB substation to service the proposed development, the charging bays will utilise existing established access & egress and includes all other associated above and below ground ancillary works
Poppyfield Retail Park , Cahir Rd Ballingarrane , Clonmel Co. Tipperary
an Electric Vehicle (EV) Charging Station on a site of ca. 0.017ha, consisting of 4 no. EV charging stations, each serving 2 no. vehicle charging bays, a total of 8 no. charging points. The charging bays will be located in the existing car park replacing 10 no. standard parking bays with 8 no. EV charging bays. It is proposed to erect an ancillary building to house an ESB substation to service the proposed development, the charging bays will utilise existing established access & egress and includes all other associated above and below ground ancillary works
Poppyfield Retail Park , Cahir Rd Ballingarrane , Clonmel Co. Tipperary
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?