← Back to search

Lackenavea (Egremont) , Birdhill , Co. Tipperary

REFUSED

Planning application 2461103

Tipperary - Tipperary County Council

Proposed Development

a single storey dwelling house, garage, waste water treatment system, entrance and all other ancillary works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    15 Dec 2024

  2. Decision: REFUSED

    14 Feb 2025

  3. Decision due

    17 Feb 2025

  4. Appeal submitted

    13 Mar 2025

  5. Appeal decided: REFUSED

    11 Jul 2025

Application Details

Location
Lackenavea (Egremont) , Birdhill , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.53 ha
Floor Area
180 sq m
Residential Units
1

Timeline

Registration Date
15 December 2024Other applications received that week
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
14 February 2025

An Coimisiún Pleanála Appeal

Appeal Reference
ABP-322073-25
Decision
REFUSED
Submitted
13 March 2025
Decided
11 July 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2458REFUSED21 Mar 2024

a dwelling house, entrance, wastewater treatment system and percolation area and all ancillary site works

Lackenavea (Egremont) , Birdhill , Co Tipperary

18m
2461053N/A7 Dec 2024

to construct a dwelling house, garage, waste water treatment system, entrance and all other ancillary works

Lackenavea (Egremont) , Birdhill , Co. Tipperary

418m
18600599CONDITIONAL14 May 2018

the construction of an extension to farmyard consisting of a cattle shed

Lacken , Birdhill , Co Tipperary

591m
2561230N/A29 Nov 2025

conversion of existing outbuilding into self-contained 2 bedroom apartment, associated alterations to elevations, installation of onsite wastewater treatment system, connection to necessary services together with all associated incidental and site works

Lackenavea (Dunalley) , Birdhill , Co Tipperary

591m
2660091N/A6 Feb 2026

the conversion of existing outbuilding into self-contained 2 bedroom apartment, installation of onsite wastewater treatment system, connection to necessary services together with all associated incidental and site works

Lackenavea (Dunalley) , Birdhill , Co. Tipperary

607m
2561186N/A20 Nov 2025

conversion of existing outbuilding into self-contained 2 bedroom apartment, installation of onsite wastewater treatment system, connection to necessary services together with all associated incidental and site works

Lackenavea (Dunalley) , Birdhill , Tipperary

612m
22688CONDITIONAL21 Dec 2022

internal modifications to existing dwelling, carry out alterations to an adjacent outbuilding to convert it to habitable space and to construct an extension to the rear of the proposed converted outbuilding to link same to the existing dwelling to form a single habitable unit including all associated site works

Lackenavea (Dunally) , Birdhill , Co. Tipperary

626m
2660018N/A13 Jan 2026

conversion of existing outbuilding into self-contained 2 bedroom apartment, associated alterations to elevations, installation of onsite wastewater treatment system, connection to necessary services together with all associated incidental and site works

Lackenavea (Dunalley) , Birdhill , Tipperary

785m
21685N/A17 May 2021

development at existing administration and distribution facility operated by rehabilitation equipment provider Lyncare Ltd comprising (i) partial change of use of ground floor level and extension of first floor level to provide rehabilitation centre (459sq.m) with direct links to existing warehousing and office accomodation (ii) provision of new external courtyard (45sq.m) at ground floor level to the rear of the building (iii) provision of pergola feature to primary building entrance off the western elevation, new access door to northern elevation, new window opes to northern and eastern elevations and new signage to northern and western elevations and (iv) all associated ancillary works necessary to facilitate the development

Unit 3 Shannonside Business Park , Birdhill , Co. Tipperary

787m
2260CONDITIONAL26 Jan 2022

previous administration and distribution facility consisting of partial change of use of ground floor level and extension of first floor level to provide additional offices, meeting rooms and laboratories, new access doors to the rear and side elevations, new window opes on the site elevations of the first floor level, removal of roller shutter doors on the rear elevation, new signage to the front elevation with lighting and all associated site works

Unit 4 Shannonside Business Park , Birdhill , Co. Tipperary

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?