Planning application 2461121

Tipperary - Tipperary County Council

Proposed Development

the construction of a single-storey dwelling with associated effluent treatment plant and percolation area, and all associated site development works, including alterations to existing site entrance and associated roadside boundary setback

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    19 Dec 2024

  2. Application withdrawn

    13 Feb 2025

  3. Decision due

    21 Feb 2025

Application Details

Location
Barrettsgrange , Fethard , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.464 ha
Floor Area
141.24 sq m
Residential Units
1

Timeline

Registration Date
19 December 2024
Status
WITHDRAWN
Decision
N/A
Decision Due
21 February 2025
Withdrawn
13 February 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

302m
17600537CONDITIONAL12 May 2017

demolition of an existing dwelling and construction of a single storey replacement dwelling with detached boiler house, decommission existing septic tank and construct new effluent treatment system and associated percolation bed, and all associated site development works

Prospect , Fethard , Co. Tipperary

737m
20378CONDITIONAL14 Apr 2020

sun room extension built to the gable of our dwelling including associated site works

Prospect , Fethard , Co. Tipperary

1.1km
18600081CONDITIONAL26 Jan 2018

the indefinite retention of as-constructed 4 box stables building with associated tack room

Tullamain , Fethard , Co. Tipperary

1.4km
20683CONDITIONAL1 Jul 2020

change of use of building originally built as a school, to use as a dwelling and retain all associated alterations and services, including extended area to the rear of the dwelling

Derryluskin , Fethard , Co Tipperary

1.4km
201411CONDITIONAL26 Nov 2020

extend and renovate existing dwelling, install septic tank including associated site works

Derryluskan , Fethard , Co. Tipperary

1.6km
2260708CONDITIONAL16 Dec 2022

a one and a half storey extension and granny flat to the side of existing dwelling, relocate existing vehicular entrance, upgrade septic tank and percolation area and all associated site development works

Derryluskan , Fethard , Co. Tipperary

1.6km
21358CONDITIONAL23 Mar 2021

construction of milking parlour building incorporating holding yard with crush/drafting yard, meal bin, office, flow channel, storage rooms, underground effluent tank and plant rooms and all associated site works. Demolition of milking parlour is also required

Colman (Hennessy) , Fethard , Co. Tipperary

1.7km
2561237CONDITIONAL1 Dec 2025

(i) the demolition of existing parts of the existing dwelling, (ii) the construction of a new extension to the existing dwelling including a new roof to the existing dwelling, (iii) a new waste water treatment system, (iv) new entrance and all associated site development works

Barretstown & Redcity , Fethard , Co. Tipperary

1.8km
2538CONDITIONAL24 Mar 2025

1) the deconstruction of an existing derelict dwelling; 2) the construction of a dwelling house, detached domestic garage, site entrance, septic tank and percolation area, and including all associated site development works

Coolmoyne , Fethard , Co. Tipperary

1.8km
201103CONDITIONAL28 Sept 2020

(1) construct a new agricultural shed consisting of loose houses with 2 no. tanks for effluent storage, (2) erect a roof over the existing lunging ring and (3) Permission to retain existing walled dungstead and all associated site works on my farm

Redcity , Fethard , Co. Tipperary

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.