Proposed Development
(a) the construction of a 2 bay extension with related signage to the existing garage and showroom (Previously permitted under Planning Ref No: 07/510824 and (b) all landscaping, boundary treatments and associated external site works
View the full application file on the council's planning portal →Application Timeline
Application received
4 Jul 2025
Further information requested
22 Aug 2025
Further information received
6 Jan 2026
Decision: CONDITIONAL
25 Feb 2026
Decision due
4 Mar 2026
Grant issued
31 Mar 2026
Application Details
- Location
- Lehinch , Lorrha , Nenagh
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.2427 ha
Timeline
- Registration Date
- 4 July 2025
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 25 February 2026
- Grant Date
- 31 March 2026
- Permission Expires
- 30 March 2031
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
existing dwelling house, septic tank with percolation area and all associated site works on revised site boundaries (Previous Reference no. 5114804)
Portland , Lorrha , Nenagh Co. Tipperary.
construction of a single storey detached dwelling house, detached garage, wastewater treatment system, site entrance and all ancillary site works thereto
Church Park , Lorrha , Nenagh Co. Tipperary
the construction of a single storey extension to the north eastern side of existing dwelling comprising 1 no. bedroom, en-suite bathroom and all ancillary site works thereto
Church Park , Lorrha , Nenagh
a proposed split level two-storey dwelling, a domestic garage outbuilding, a proposed wastewater treatment system, with a raised percolation area, all associated siteworks including a site entrance
Portland , Lorrha , Nenagh
for developments at; Connaught Harbour to Portumna Bridge, Fairyhill following the ESB flood embankment, through Lough Derg Water Recreation Park, Portumna to Portumna Forest Park, Portumna Demesne, County Galway. The development consists of two Phases, Phase 1: a new multi-use shared leisure route (Blueway), 2.4km in length, with tailored surface finishes, information, directional and safety signage and all other associated ancillary works. The route commences at Portumna Bridge, crosses over the ESB flood bank via a new timber boardwalk, following along the toe of the flood bank connect to Lough Derg Water Recreation Park. A new cycle advisory lane, marked parking bays upgrade to footpaths shall be constructed at Lough Derg Water Recreation. The route continues through adjacent farm land which connects to OPW lands that lead to the existing access road at Portumna Forest Park. Phase 2: a new 8 berth marina, incorporating boat pump-out at Connaught Harbour, the removal of the two existing buildings and construction of a new car parking area. Located at the existing Waterways Ireland works yard at Portumna bridge the three existing building shall be removed, for the construction of a new car parking and amenity area, including a new timber covered space incorporating a bat roost. Existing footpaths shall be repaired where required and a new Toucan road crossing shall be constructed to connect to the Blueway constructed in Phase 1. The proposal will involve works to or within the curtilage of the following protected structures; Portumna Harbour, Fairyhill (RPS 477) and Portumna Castle, Portumna Demesne (PRS 3785). A Natura Impact Statement have been prepared and included as part of the planning application
Portumna Demense Portumna Fairyhill ,
of planning ref. 19/1287 for developments at; Connaught Harbour to Portumna Bridge, Fairyhill following the ESB flood embankment, through Lough Derg Water Recreation Park, Portumna to Portumna Forest Park, Portumna Demesne, County Galway. The development consists of two Phases, Phase 1: a new multi-use shared leisure route (Blueway), 2.4km in length, with tailored surface finishes, information, directional and safety signage and all other associated ancillary works. The route commences at Portumna Bridge, crosses over the ESB flood bank via a new timber boardwalk, following along the toe of the flood bank connect to Lough Derg Water Recreation Park. A new cycle advisory lane, marked parking bays upgrade to footpaths shall be constructed at Lough Derg Water Recreation. The route continues through adjacent farm land which connects to OPW lands that lead to the existing access road at Portumna Forest Park. Phase 2: a new 8 berth marina, incorporating boat pump-out at Connaught Harbour, the removal of the two existing buildings and construction of a new car parking area. Located at the existing Waterways Ireland works yard at Portumna bridge the three existing building shall be removed, for the construction of a new car parking and amenity area, including a new timber covered space incorporating a bat roost. Existing footpaths shall be repaired where required and a new Toucan road crossing shall be constructed to connect to the Blueway constructed in Phase 1. The proposal will involve works to or within the curtilage of the following protected structures; Portumna Harbour, Fairyhill (RPS 477) and Portumna Castle, Portumna Demesne (PRS 3785). A Natura Impact Statement have been prepared and included as part of the planning application
Portumna Demense , Portumna , Fairyhill
machinery/general purpose store and all associated site work
Portland , Lorrha , Nenagh
of alterations to existing petrol station including (i) removal of stone wall and provision of bollards along Bridge Road; (ii) revisions to the height and design of the forecourt canopy inclusive of illuminated signage; (iii) additional signage inclusive of directional signage at entrance and exit of the site, the eastern and southern elevations of the former retail unit and interior of boundary fencing; (iv) replacement of 1 no. totem sign and replacement of vent pipes with 1 no. vent pipe totem sign; (v) brick paving at the entrance, under canopy and at northern, eastern and western boundaries; (vi) relocation of offset fill and associated structure at eastern site boundary; (vii) provision of 1 no. drive through car wash with associated signage and 1 no. lance car wash with associated signage, and associated pump house located to the north west of the site; (viii) ACO drainage channels around forecourt, along tanker stand and at the entrance and exit to the site; (ix) provision of apartment bin storage adjoining ‘shop compound’ comprising mini vent pipes, water tank, pumping station and oil and car wash interceptors to the north east of the site; (x) provision of 4 no. car parking spaces to serve the existing apartments; (xi) provision of new timber boundary fence on the northern, eastern and western site boundaries; (xii) change of use of retail unit to storage; (xiii) addition of fresh water tank; (xiv) all associated works inclusive of infrastructure, lighting, surface drainage, boundary treatments, and site works; and (xv) revised operating hours to provide a 24-hour self-service petrol station. Gross floor space of work to be retained: (Pumphouse) 25.77 sqm & (Change of use Commercial) 188.00 sqm
Go Station Portumna , Bridge Road Fairyhill Portumna , Co. Galway.
for the construction of a serviced dwelling house with a domestic store/garage. Gross floor space of proposed works 284.8sqm.
Gortaha ,
for the construction of a serviced dwelling house with a domestic store/garage. Gross floor space of proposed works 284.8sqm
Gortaha ,
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?