← Back to search

Barnane , Templemore , Co. Tipperary

N/A

Planning application 2560006

Tipperary - Tipperary County Council

Proposed Development

installation of sewage treatment and tertiary treatment system as well as the restoration of existing dwelling

View the full application file on the council's planning portal →

Application Details

Location
Barnane , Templemore , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.01 ha

Timeline

Registration Date
3 January 2025
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

11m
2560048CONDITIONAL28 Jan 2025

installation of sewage treatment and Tertiary Treatment system as well as the restoration of existing dwelling

Barnane , Templemore , Co. Tipperary

41m
2560029N/A21 Jan 2025

installation of sewage treatment and tertiary treatment system as well as the restoration of existing dwelling

Barnane , Templemore , Co. Tipperary

234m
21241CONDITIONAL26 Feb 2021

to construct an extension to the rear and alterations to existing school, including all associated site works

Barnane National School , Barnane , Templemore

240m
18600822CONDITIONAL29 Jun 2018

extension to existing stables to include porch and storage area. Permission to retain two number covered restricted exercise areas over existing open sand based training arenas

Barnane , Drom , Co. Tipperary

362m
21738CONDITIONAL21 May 2021

construction of a bungalow dwelling house, domestic garage, waste water treatment and disposal system, entrance and all associated site works

Killoskehane , Templemore , Co Tipperary

377m
23112CONDITIONAL27 Apr 2023

demolition of existing dwelling and structures including septic tank and construction of a part single storey, part two storey replacement dwelling, domestic garage, septic tank and percolation area together with new site entrance at existing entrance and all associated site works

Barnane , Templemore , Co. Tipperary

433m
19601180N/A24 Oct 2019

construction of single storey extension to the rear of existing dwelling house and permission to retain unauthorised front porch/extension and domestic store including all associated site works

Barnane , Templemore , Co. Tipperary

435m
19601250CONDITIONAL6 Nov 2019

construction of single storey extension to the rear and patio door to the front elevation of existing dwelling house and permission to retain unauthorised front porch/extension and domestic store including all associated site works

Killoskehane , Templemore , Co. Tipperary

471m
211714CONDITIONAL26 Nov 2021

to construct a storey and a half/single storey dwelling house, domestic garage, septic tank and percolation area, entrance and all associated site works

Barnane , Templemore , Co Tipperary

534m
2249REFUSED21 Jan 2022

renovation, extension and part change of use of existing dwelling and garden, change of use and extension of existing out buildings, alterations to existing site entrance to achieve required sightlines, new treatment system and polishing system filter, new private well and all associated site works - proposed works to include: (1) renovation and modifications of existing dwelling, single storey extension to side and rear, (2) change of use and modifications of existing outbuildings from agriculture to commercial (2 no. units - short term holiday accommodation), (3) change of use, modification and extension of exisitng outbuildings from agriculture to commercial (facilities associated with Glamping Pods), (4) part change of use from residential to commercial (8sqm), (5) part change of use of existing garden from residential to commercial (space for glamping site - 6 no. 19sqm bell tents plus associated infrastructure), (6) part change of use of existing garden to car parking area (15 no. spaces) and access road and dilapidated barn to be demolished to facilitate parking area

Kilfithmone Rectory , Killoskehan , Templemore

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?