Shronnell Beg , Tipperary , Co Tipperary
CONDITIONALPlanning application 2560684
Tipperary - Tipperary County Council
Proposed Development
extension to house and retention of as built garage
View the full application file on the council's planning portal →Application Timeline
Application received
16 Jul 2025
Decision: CONDITIONAL
5 Sept 2025
Decision due
9 Sept 2025
Grant issued
9 Oct 2025
Application Details
- Location
- Shronnell Beg , Tipperary , Co Tipperary
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.21 ha
- Floor Area
- 65.1 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 16 July 2025
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 5 September 2025
- Grant Date
- 9 October 2025
- Permission Expires
- 8 October 2030
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
(1) domestic extension to the rear of my dwelling (2) windows to the original dwelling structure (3) and including all associated site works
Roseborough , Tipperary , Co. Tipperary
the retention of external shed attached to the rear of the house; window in west gable elevation; replacement of a window with patio doors on the north elevation and full planning permission for relocation of vehicle entrance from east side to west side of front boundary and all ancillary works
Shronell Beg , Tipperary Town , Co.Tipperary
extensions and alterations to existing house to include a (1) granny flat with extended kitchen and entrance porch together with (2) works to main house to include new porch, kitchen dining, sitting area, utilities and alterations to doors and windows (3) provision of a new treatment plant and sand polishing filter bed and all ancillary works
Roesborough , Tipperary Town , Co Tipperary
construction of a replacement wastewater treatment system to include 6PE treatment unit and percolation area; and all associated site and ancillary works
Roseboro , Tipperary , Co. Tipperary
a vehicular entrance, dwelling house, garage, domestic waste water treatment system with polishing filter together with all associated site works
Barronstown (Ormond) , Emly Road , Tipperary
the extension and renovation of the existing dwelling. RETENTION PERMISSION for the domestic garage, site boundaries, position of dwelling house, entrance and front boundary wall and position of septic tank and percolation area and associated site works
Shronell Beg , Tipperary , Co. Tipperary
new dwelling, garage, septic tank, percolation area, entrance and associated works
Shronell Beg , Lattin , Co. Tipperary
a shed.
Shronell Beg , Lattin , Co Tipperary
construction of extension to cubicle shed and all associated site works
Shronell Beg , Tipperary , Co. Tipperary
RED III application for development which comprises the construction of an anaerobic digestion facility to produce renewable biomethane, CO2 (which will be captured), and a bio-based fertiliser from organic material. The total gross floor area of the proposed development (including internal plant areas and ancillary structures) will be c. 3,301 sq.m. The development will consist of the following: • 3 no. digesters (all c. 15.5m in height), 2 no. digestate storage structures (c. 15.5m and c. 12m in height), a liquid feed tank (c. 4m in height) and a pump room and O2 generation structure (with a GFA of c. 27 sq.m. and a height of c. 2.6m), located in the northern section of the site. • 4 no. pasteurisation tanks (each c. 6m in height), a post pasteurisation cooling tank (c. 4m in height) and a pre fertiliser manufacturing tank (c. 4m in height), located to the southeast of the main digesters. • A part single-storey and part two-storey reception hall (with a gross floor area (GFA) of c. 1,964 sq.m. and an overall height of c. 16.5m) to accommodate a laboratory, panel room, tool store, workshop, and storage areas, with a liquid feed intake adjacent to the reception hall, located to the centre of the site. • Two pump house structures, each with a height of c. 2.6m and GFAs of 14 sq.m. and 21 sq.m., will be provided to the west and east of the reception hall building respectively. • A single-storey solid digestate storage and a nutrient recovery building (with a GFA of c. 880 sq.m and an overall height of c. 12.4m) located to the east of the reception hall, in the central portion of the site. • Odour abatement plant (with an overall height of c. 7m) and equipment and a digestate offtake area will be provided to the east of the solid digestate storage and nutrient recovery building. • Construction of an ESB substation (with a GFA of c. 27 sq.m and a height of c. 3.4m), a grid injection unit (with a GFA of c. 22 sq.m and a height of c. 2.8m) (which will be connected to the gas grid by way of an underground connection by Gas Networks Ireland), a GNI / grid offtake skid, and a fire water storage tank (with a height of c. 7.7m) in the southern portion of the site. • Construction of 2 no. CO2 tanks (c. 10.7m in height), a CO2 loading pump (c. 2.6m in height), CO2 auxiliaries (c. 2.6m in height), CO2 liqueufactor (with an overall height of c. 8.2m), a CO2 compressor (with an overall height of c. 5.9m) and a CO2 pre-treatment skid (c. 3.5m in height), located in the we
Ballynilard , Tipperary , Co. Tipperary
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?