Ballyboe , Ballypatrick Clonmel , Co. Tipperary
CONDITIONALPlanning application 2560732
Tipperary - Tipperary County Council
Proposed Development
the as-constructed roadway and access onto the local road (L2504) and PERMISSION for construction of a fence and gate
View the full application file on the council's planning portal →Application Timeline
Application received
28 Jul 2025
Further information requested
11 Sept 2025
Further information received
25 Sept 2025
Decision: CONDITIONAL
20 Oct 2025
Decision due
22 Oct 2025
Grant issued
23 Nov 2025
Application Details
- Location
- Ballyboe , Ballypatrick Clonmel , Co. Tipperary
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Tipperary County Council
- Site Area
- 1.37 ha
Timeline
- Registration Date
- 28 July 2025
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 20 October 2025
- Grant Date
- 23 November 2025
- Permission Expires
- 22 November 2030
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
construction of an extension to ground floor areas and refurbish existing farmhouse, including all associated site works and services
Ballyboe , Ballypatrick , Clonmel
construction of an extension to ground floor areas and refurbish existing farmhouse, including all associated site works and services
Ballyboe , Ballypatrick , Clonmel
to retain an existing dormer extension and reconstruction, existing replacement entrance, to complete those works including new velux windows to front roof of the original house, replace existing front boundary fence in front of this house and associated site works
Ballynevin , Newtown Anner , Clonmel
fill the existing gravel pit and reinstate to levels including all associated site development works. This site is within the attendant grounds of Anner Castle, Ballinamore, a Protected Structure R.P.S. 2/N.I.A.H. Ref. 22207713
Ballinamore , Clonmel , Co. Tipperary
a RED III development for a period of 10 years for the construction of a solar PV energy development (renewable energy development) with a total site area of 32.6 hectares. The development will consist of PV panels mounted on metal frames, inverter station, string inverters, new access tracks, underground cabling, perimeter fencing with CCTV cameras and access gates, electrical cabling and ducting, new on-site ESB 38kV substation building, 33kV control building, lighting masts, laydown areas, landscaping and all ancillary grid infrastructure and associated works. The grid route is c. 1.06km in length. The Application Site will be accessed from two new access points off the R706, one of which was previously consented under Planning Reference: 19600239. The Proposed Development will connect with and represents an extension to the adjacent solar farm permitted under Planning Reference 19600239 and 21403. Permission is also sought for minor amendments to Planning Reference 19600239 and 21403 which comprises of (1) Minor adjustments to the perimeter fencing (length decreasing by c.1km), (2) Minor adjustments to the red line boundary (decreasing by c.1km), (3) Increase operational lifetime from 30 years to 40 years. The proposed solar farm will connect to the national grid via the new 38kV substation and will have an operational lifetime of 40 years. A Natura Impact Statement (NIS) has been prepared in respect of this application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
Within the townland of , Ballyboe , County Tipperary
the construction of a new dormer dwelling and to renovate and make minor alterations to the the existing derelict dwelling, which will be integrated into the new dwelling; installation of a new domestic wastewater treatment system and all associated works
Ballyboe , Ballypatrick , Co.Tipperary
to retain indefinitely, the development as constructed for two no single storey agricultural buildings, built around courtyard, containing 1. the construction of a stables building (for 16 horses - Area: 555sqm) 2. The construction of a hay barn (area: 125 sqm) 3. the demolition of the existing stables building (area: 52 sqm) and the construction of a staff area, storage and examination room (area: 197 sqm) 4. a urine storage tank 5. storm water soakaways. All with the associated site development working within the curtilage of Anner Castle, Ballinamore, Clonmel, Co Tipperary, a Protected Structure NIAH - 22207713 / Recorded Monument (no: TS077-089)
Anner Castle , Ballinamore , Clonmel
to retain indefinitely, the development as constructed for two no single storey agricultural buildings, built around a Courtyard, containing: 1. The construction of a stables building (for 16 horses – Area: 555sqm) 2. The construction of a hay barn (Area: 125sqm) 3. The demolition of the existing stables building (Area: 52sqm) and the construction of a staff area, storage and examination room (Area: 197sqm) 4. Liquid effluent storage tank 5. Storm water soakaways. All with the associated site development works within the curtilage of Anner Castle, Ballinamore, Clonmel, Co. Tipperary, a Protected Structure NIAH – 22207713 / Recorded Monument (No: TS077-089)
Anner Castle , Ballinamore , Clonmel
fit-out Anner Castle as a private residence following the completed fabric restoration in 2019 (Planning Ref:14/600555). This is to include the following: a- 8 bedrooms and associated bathrooms, b- Wheelchair accessible lift, c- Refurbishment and extension of the existing North Staircase, d-The completion of the 2 number ancillary circulation staircases. e- New foul water treatment system. All with the associated site development works. A Protected Structure NIAH – 22207713 / Recorded Monument (No: TS077-089)
Anner Castle , Ballinamore , Co Tipperary
the removal of the existing timber staircase in the north tower and the construction of a new hardwood octagonal staircase serving both the first floor and a new upper level (previously granted under Planning Reference No 2361015). All with the associated site development works. It is a protected structure NIAH – 22207713/recorded monument no: TS077-089
Anner Castle , Ballinamore , Clonmel
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?