← Back to search

Coille Bheithe , Nenagh , Co. Tipperary

N/A

Planning application 2560784

Tipperary - Tipperary County Council

Proposed Development

the construction of 2 no. 3-bedroom bungalows with carparking, connection to services, bin storage and ancillary site works with a new shared entrance off the Coille Bheithe estate road

View the full application file on the council's planning portal →

Application Details

Location
Coille Bheithe , Nenagh , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.095 ha
Floor Area
308.4 sq m
Residential Units
2

Timeline

Registration Date
12 August 2025
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2560936REFUSED19 Sept 2025

the construction of 2 No 3-bedroom bungalows with carparking, connection to services, bin storage and ancillary site works with a new shared entrance off the Choille Bheithe estate road

Coille Bheithe , Nenagh , Co. Tipperary

2m
23154N/A6 Jun 2023

the demolition of an existing single storey derelict dwellinghouse and the construction of 12 No 2-bedroom apartments in 3 separate Blocks

St Conlons Road , Nenagh , Co Tipperary

2m
24247N/A4 Nov 2024

the demolition of an existing single storey derelict dwellinghouse and the construction of 12 No 2 bedroom apartments in 3 separate Blocks. Block No 1 shall consist of 4 No 2 bedroom apartments in a two-storey block with car-parking, connection to services, bin storage and ancillary site works accessed off St Conlons Road. Blocks No 2 & No3 shall each consist of 4 no 2 bedroom apartments in a two storey block with car-parking, connection to services, bin storage and ancillary site works accessed from a new entrance off the Coille Beithe estate road

St Conlons Road , Nenagh , Co Tipperary

2m
23278N/A2 Nov 2023

demolition of existing single storey derelict dwelling house and construction of 12 no. two-bed apartments in 3 separate blocks - block no. 1 shall consist of 4 no. two bed apartments in a two-storey block with carparking, connection to services, bin storage and ancillary site works accessed off St. Conlons Road, block no's 2 and 3 shall each consist of 4 no. two bed apartments in a two storey block with carparking, connection to services, bin storage and ancillary site works accessed from a new entrance off the Coille Beithe estate road

St. Conlons Road , Nenagh , Co. Tipperary

13m
2560763N/A5 Aug 2025

the construction of 2 no 3-bedroom bungalows with carparking, connection to services, bin storage and ancillary site works with a new shared entrance off the Choille Bheithe Estate Road

Coille Bheithe , Nenagh , Co. Tipperary

20m
23303N/A29 Nov 2023

the demolition of an existing single storey derelict dwelling house and the construction of 12 No. 2 bedroom apartments in 3 separate Blocks. Block No. 1 shall consist of 4 No. 2 bedroom apartments in a two-storey block with car-parking, connection to services, bin storage and ancillary site works accessed off St Conlons Road. Blocks No. 2 & No. 3 shall each consist of 4 No. 2 bedroom apartments in a two storey block with car-parking, connection to services, bin storage and ancillary site works accessed from a new entrance off the Coille Beithe estate road

St Conlons Road , Nenagh , Co Tipperary

21m
24255N/A8 Nov 2024

the demolition of an existing single storey derelict dwellinghouse and the construction of 12 No 2 bedroom apartments in 3 separate Blocks. Block No 1 shall consist of 4 No 2 bedroom apartments in a two-storey block with car-parking, connection to services, bin storage and ancillary site works accessed off St Conlons Road. Blocks No 2 & No3 shall each consist of 4 no 2 bedroom apartments in a two storey block with car-parking, connection to services, bin storage and ancillary site works accessed from a new entrance off the Coille Beithe estate road

St Conlons Road , Nenagh , Co Tipperary

29m
2560772N/A6 Aug 2025

2 no. 3-bedroom bungalows with carparking, connection to services, bin storage and ancillary site works with a new shared entrance off

Coille Bheithe , Nenagh , Co. Tipperary

51m
2660283N/A31 Mar 2026

a) 6 no. two storey dwellings in 2 no. terrace blocks of 3 dwellings; b) removal of existing shed structure; c) alterations to existing boundary to provide new site entrance, access road and footpath from the existing Coille Bheithe estate; e) new site boundary treatments; f) new waste, water and utility service connections and all associated site works

Coille Bheithe Estate St. Conlan’s Road & , rear of the existing dwelling at St. Conlan’s Road , Nenagh

76m
20256CONDITIONAL13 Mar 2020

7 no. serviced sites with one detached house and storage shed on each site, access roadway off Coille Bheithe estate, public footpaths, public lighting, connections to public services and all ancillary site works

Nenagh North (tld) , St. Conlan's Road , Nenagh Co. Tipperary

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?