Fethard GAA Park , Saint Patrick's Place Fethard , Co. Tipperary

CONDITIONAL

Planning application 2560990

Tipperary - Tipperary County Council

Proposed Development

a) Construction of a new 2-storey clubhouse facility comprising of 2no. changing rooms, showers, toilet facilities, a referees’ room, a meeting room, a medical/store room and multi-purpose room; b) Demolition of existing spectator stand; c) Construction of new spectator stand; d) Installation of new hurling wall; e) Installation of a footpath and low-level; Perimeter fencing around the existing GAA pitch; f) Relocation of the existing electric scoreboard; g) Relocation of existing ball stop net; h) All associated site development works (the site is bounded to the south by Fethard Town Walls, which is a Protected Structure TRPS1743 (Tipperary County Development Plan 2022-2028))

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    3 Oct 2025

  2. Further information requested

    26 Nov 2025

  3. Further information received

    4 Feb 2026

  4. Decision: CONDITIONAL

    27 Feb 2026

  5. Decision due

    3 Mar 2026

  6. Appeal submitted

    25 Mar 2026

Application Details

Location
Fethard GAA Park , Saint Patrick's Place Fethard , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
2.46 ha

Timeline

Registration Date
3 October 2025
Status
APPEALED
Decision
CONDITIONAL
Decision Date
27 February 2026

An Coimisiún Pleanála Appeal

Appeal Reference
PL-501039-TY-26
Submitted
25 March 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

60m
2560949N/A23 Sept 2025

a) the construction of a new 2-storey clubhouse facility comprising of 2 no. changing rooms, showers, toilet facilities, a referees’ room, a meeting room, a medical/store room and multi-purpose room; b) demolition of existing spectator stand; c) construction of new spectator stand; d) installation of new hurling wall; e) installation of a footpath and low-level perimeter fencing around the existing GAA pitch; f) relocation of the existing electric scoreboard; g) all associated site development works

Fethard GAA Park , Saint Patrick's Place Fethard , Co. Tipperary

65m
18601185CONDITIONAL2 Oct 2018

extension of hours of operation of their all-weather playing pitch flood lights, currently permitted to operate from 9.00 a.m. to 9.00 p.m. with permission now sought to extend by one hour to operate from 9.00 a.m. to 10.00 p.m.

Fethard GAA Park , Fethard , Co. Tipperary

65m
17600096CONDITIONAL7 Feb 2017

construction of a 3 mt high ball stop net to top of perimeter fencing of all-weather playing pitch, as granted under previous planning ref no. 15/600756

Fethard GAA Park , Fethard , Co. Tipperary

69m
2461081CONDITIONAL11 Dec 2024

retention indefinitely the as constructed single-storey extension to the rear of dwelling and permission to construct a single-storey extension to the side of dwelling, make minor alterations to the existing dwelling and all associated site development works

4 Cois Falla , Fethard , Co. Tipperary

177m
21701REFUSED19 May 2021

erection of a 15m high monopole telecommunications support structure together with antennas, dishes and associated equipment and remove the existing 10m high timber communications pole with antenna. The proposed development is within the curtilage of a Stone Archway (RPS 219), a protected structure

Eir Exchange , St. Patrick's Place , Fethard

182m
20302CONDITIONAL25 Mar 2020

an extension to the rear and side of the existing Pharmacy consisting of the demolition of existing sheds to facilitate the proposed extension consisting of new pharmacy retail area space, along with ancillary storage space, an employee services area, treatment room, beauty room and for Retention of existing illuminated sign. Proposed works are to take place within the archaeological zone of notification for Fethard and the Architectural Conservation Area

Barracks Street , Fethard , Co. Tipperary

183m
201459N/A7 Dec 2020

erection of a 15m high monopole telecommunications support structure together with antennas, dishes and associated equipment and remove the existing 10m high timber communications pole with antenna

eir Exchange , St. Patrick's Place , Fethard

186m
17600241N/A13 Mar 2017

the installation of a CCTV system, the works include the erection of new or replacement poles and cameras and transmitters at the following locations (a) on a replacement light pole at Green Street (b) on the Garda Station at Main Street (c) on a new pole at Fethard Secondary School, Rocklow Road (d) on an existing light pole on Main Street (e) on the Tholsel (A National Monument and Protected Structure Ref RPS S210) which will include erection of transmitters to the front and side elevation and erection of pole mounted transmitter on rear elevation (f) on Academy House, Main Street (g) on the Convent Hall, Main Street (h) on new pole at the Playground on Cashel Road (I) on Dooks building, Kerry Street (j) on the Council building on the Valley (k) on a new pole at Watergate Street (l) on Gaule's Pub at Burke Street

Fethard , Co. Tipperary

203m
2560873CONDITIONAL5 Sept 2025

the installation of an ATM to the front elevation and alterations to the shopfront and signage to suit and the replacement/repair of rain water goods and all necessary associated site works

Main Street , Fethard , Co. Tipperary

205m
211368CONDITIONAL15 Sept 2021

1) proposed shop front and alterations to existing windows and doors to front elevations, proposed shop front, doors and windows will be a replica replacement of the original shop front and replica Wyatt replacements, 2) proposed alterations to existing rear elevation consisting of proposed change of window to door on first floor, proposed new stairs balcony and store to replace existing store and balcony and stairs, replace existing first floor balcony with associated site works

Main Street , Fethard , Co. Tipperary