← Back to search

McDonagh House , Dublin Road , Nenagh

N/A

Planning application 2561115

Tipperary - Tipperary County Council

Proposed Development

the material alteration of the rear elevation of the existing mixed use building (McDonagh House) consisting of the formation of two number openings, namely: an entrance door and fire escape at ground floor level and an additional window at first floor level

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    6 Nov 2025

  2. Further information requested

    18 Dec 2025

  3. Application withdrawn

    26 Jun 2026

Application Details

Location
McDonagh House , Dublin Road , Nenagh
Applicant
N/A
Application Type
RETENTION
Planning Authority
Tipperary County Council
Site Area
0.173 ha

Timeline

Registration Date
6 November 2025
Status
DEEMED WITHDRAWN
Decision
N/A
Withdrawn
26 June 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

48m
2460176CONDITIONAL12 Mar 2024

a retail unit on a gap site along with all ancillary site works

Martyrs Road , Nenagh North , Nenagh Co. Tipperary

53m
2460590N/A19 Jul 2024

a single storey extension to the rear of existing house together with all associated site works

26 McDonagh Street , Nenagh , Co. Tipperary

53m
2560480N/A28 May 2025

a single storey extension to the rear of existing house together with all associated site works

26 McDonagh Street , Nenagh , Co. Tipperary

56m
2560914N/A16 Sept 2025

change of use from general office to health centre to provide talking therapy, mental health diagnostic assessments (including neurodiversity assessments), psychiatry consultations, and GP consultations for GPs with a special interest in mental health and replacement of existing signage and all ancillary works

Front Office Unit The Hatchery , Martry's Road Nenagh , Co. Tipperary

58m
2560979CONDITIONAL1 Oct 2025

the change of use from general office to health centre to provide talking therapy, mental health diagnostic assessments (including neurodiversity assessments), psychiatry consultations, and GP consultations for GPs with a special interest in mental health. Retention permission is also sought for signage

Front Office Unit The Hatchery , Martry's Road Nenagh , Co. Tipperary

58m
2561208CONDITIONAL24 Nov 2025

Material Change of Use from Religion Service area and associated Office Use to Sport Recovery/Cafe Shop and alterations to the Shopfront and placement of Signage and all ancillary works

Martyr's Road , Nenagh , Co Tipperary

66m
2561163N/A14 Nov 2025

a development at this site Martyr's Road, Nenagh, Co Tipperary. The development will consist of - for Material Change of Use from Religion Service area and associated Office Use to Sport Recovery/Cafe Shop and alterations to the Shopfront and placement of Signage and all ancillary works

Martyr's Road , Nenagh , Co Tipperary

66m
22200N/A9 Mar 2022

change of use of the subject unit from a shop (as per condition 2 of PA Ref: 17600313) to a warehouse with ancillary trade counters selling building related products principally to trade, internally, the construction of two trade counters (one for general use and one for specialist use), externally the inclusion of a small mechanical plant area at the rear of the building, all signage including an LED downlighter on the main sign at the entrance to the proposed trade counters and all ancillary works in relation to the deveopment

Martyr's Road , Nenagh , Co Tipperary

66m
19600510CONDITIONAL15 May 2019

extension to rear of dwelling

6 Thomas McDonagh Street , Nenagh , Co. Tipperary

68m
19601086CONDITIONAL2 Oct 2019

a partial change of use from residential premises to a proposed coffee shop for consumption on and off the premises, front signage, outdoor eating area and all associated site works and permission for retention of demolition of garage and construction of side extension

25 McDonagh Street , Nenagh , Co. Tipperary

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?