Colaiste Dun Iascaigh , Cashel Road , Co. Tipperary

CONDITIONAL

Planning application 2561123

Tipperary - Tipperary County Council

Proposed Development

the construction of all-weather sports facilities to the rear of the school including the following: a) a 3 lane, 400-metre athletic running track, with a 6 lane, 100-metre sprint track, b) an all-weather pitch for soccer and GAA games, c) track and field sports including long jump, high jump, shot put, boules, miniature-golf course, d) a perimeter walkway/running track with low level lighting around the existing amenities, e) flood-lighting to the main all-weather pitch and track and field sports, f) two new paddle courts with flood lighting and associated fencing, g) proposed ball stop netting, h) proposed dugouts, i) ancillary structures such as a small retaining wall between the all-weather pitch and the existing grass pitch, steps, footpaths, fencing and gates. The works include all landscaping, drainage, ancillary works and services

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    7 Nov 2025

  2. Further information requested

    9 Jan 2026

  3. Further information received

    23 Feb 2026

  4. Decision: CONDITIONAL

    20 Mar 2026

  5. Decision due

    22 Mar 2026

  6. Grant issued

    23 Apr 2026

Application Details

Location
Colaiste Dun Iascaigh , Cashel Road , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
6.58 ha

Timeline

Registration Date
7 November 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
20 March 2026
Grant Date
23 April 2026
Permission Expires
22 April 2031

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

67m
2561066N/A23 Oct 2025

construction of all-weather sports facilities to the rear of the school including the following; a) a 400-meter athletic running track, with a 100-meter sprint track, b) An all-weather pitch for soccer and GAA games, c) track and field sports including long jump, high jump, shot put, boules, miniature-golf course, d) a perimeter walkway/running track with low level lighting around the existing amenities e) Flood-lighting to the main all-weather pitch and track and field sports f) two new paddle courts with flood lighting and associated fencing, g) ancillary structures such as a small retaining wall between the all-weather pitch and the existing grass pitch, steps, seating fencing and gates. The works include all landscaping, drainage and ancillary works and services

Colaiste Dun Iascaigh , Cashel Road , Co. Tipperary

71m
2360696CONDITIONAL3 Sept 2023

a) proposed new astro-turf training pitch complete with perimeter fencing and ball stop netting, b) proposed new 6m high hurling/football ball wall, c) proposed new floodlighting installation to new astro-turf and existing grass pitch to include new lighting poles, d) all associated site works

Cashel Road , Cahir , Co. Tipperary

82m
19600652CONDITIONAL13 Jun 2019

construction of a free-standing, single-storey, prefabricated, two classroom ASD unit with associated ancillary spaces and covered walkway to the rear (south west) of existing building and associated site drainage and site development works

Colaiste Dun Iascaigh , Barnora , Cahir

119m
20421N/A27 Apr 2020

the installation of 40 kW of solar PV panels (approximately 201 meters squared) on the roof of the gym

Farranlahassery , Cahir , Co. Tipperary

128m
20477CONDITIONAL18 May 2020

the installation of 40 kW (201 m2) of photo-voltaic panels on the roof of an existing building

Farranlahassery , Cahir , Co. Tipperary

148m
2660071CONDITIONAL29 Jan 2026

a) the construction of four new extensions with a total combined floor area of 2,522.50m², comprising - (i) extension 1 (2,367m²), a part single storey and part two storey extension to the west of the existing school building. Extension 1 comprises a 4 no. classroom SEN base, 6 no. general classrooms, 4 no. specialist classrooms, 3 no. SET rooms, as well as storage, toilets, locker/social spaces, and other ancillary accommodation. Extension 1 is connected to the existing school by two short link corridors. Extension 1 includes solar PV panels on the roof; (ii) extension 2 (58.5m²) and extension 3 (58.5m²), both single storey extensions located within a service yard to the east of the existing school building. Extensions 2 and 3 are both technology preparation rooms and are attached directly to existing technology classrooms, and; (iii) extension 4 (38.5m²), a single storey external store extension; b) demolition of part of the existing service yard, including four small stores (total area 67.4m²); c) construction of a new 2.1m high rendered wall and vehicular gates to the modified service yard, and construction of a new covered storage area; d) modifications and extension to the existing car park to provide additional car parking spaces and an SEN set down area; e) two new covered bicycle shelters and relocation of the two existing covered bicycle shelters; f) provision of a new heat pump compound enclosed in 2.1m high palisade fencing; g) construction of an SEN enclosed play area and a sensory garden; h) all ancillary site development works, including new hard and soft landscaping, an underground firefighting static storage tank, a swale and a soakaway, and i) all associated site services, including external lighting and EV charging

Coláiste Dún Iascaigh , Cashel Road , Cahir

158m
2660027N/A15 Jan 2026

development which will consist of: a) Construction of three new extensions with a total combined floor area of 2,484m², comprising - (i) Extension 1 (2,367m²), a part single storey and part two storey extension to the west of the existing school building. Extension 1 comprises a 4no. classroom SEN base, 6 no. general classrooms, 4 no. specialist classrooms, 3no. SET rooms, as well as storage, toilets, locker/social spaces, and other ancillary accommodation. Extension 1 is connected to the existing school by two short link corridors. Extension 1 includes solar PV panels on the roof, and (ii) Extension 2 (58.5m²) and Extension 3 (58.5m²), both single storey extensions located within a service yard to the east of the existing school building. Extensions 2 and 3 are both technology preparation rooms and are attached directly to existing technology classrooms, b) Demolition of part of the existing service yard, including three small stores, c) Construction of a new 2.1m high rendered wall and vehicular gates to the modified service yard, and construction of a new covered storage area, d) Modifications and extension to the existing car park to provide additional car parking spaces and an SEN set down area, e) Two new covered bicycle shelters and relocation of the two existing covered bicycle shelters, f) Provision of a new heat pump compound enclosed in 2.1m high palisade fencing, g) Construction of an SEN enclosed play area and a sensory garden, h) All ancillary site development works, including new hard and soft landscaping, an underground firefighting static storage tank, a swale and a soakaway, and i) All associated site services, including external lighting and EV charging

Coláiste Dún Iascaigh , Cashel Road , Cahir

164m
17600619CONDITIONAL30 May 2017

permission to erect new bicycle shelter and extend existing car park area and associated site development works

Colaiste Dun Iascaigh , Barnora , Cahir

173m
18601097CONDITIONAL7 Sept 2018

(1) retention of living room extension to rear of dwelling and (2) permission to add additional extension there-on (3) permission to construct extension to side of dwelling connecting to existing detached study/playroom structure (including alterations to fenestration to side of study/playroom structure) and incorporating a room of the existing dwelling to facilitate provision of ancillary family accommodation and all associated works

14 Townspark , Clonmel Road Cahir , Co. Tipperary

192m
2660782N/A11 Aug 2026

(i) storage container (until completion of dwelling) and (ii) the existing side boundary walls of site and PERMISSION for the construction of a dwelling, garage, entrance and all associated site works

Site 18 Townparks , Clonmel Road , Cahir Co. Tipperary

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?