← Back to search

Abbey Street , Cahir , Co. Tipperary

CONDITIONAL

Planning application 2561361

Tipperary - Tipperary County Council

Proposed Development

1) the extensive refurbishment of the building and the demolition of a single storey component to the rear elevation, 2) the construction of a two storey modern extension to the rear elevation and also, there will be various alterations to the exterior facades of the existing building, 3) the development of six apartments consisting of 4 two bedroom apartments and 2 one bed apartments, 4) the upgrade and improvement works to the wastewater and stormwater connections, 5) the material change of use from commercial space to residential units, 6) the construction of a bin storage area, bike stands, parking area, footpaths, hard and soft landscaping areas and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    23 Dec 2025

  2. Further information requested

    24 Feb 2026

  3. Further information received

    30 Mar 2026

  4. Decision: CONDITIONAL

    23 Apr 2026

  5. Decision due

    27 Apr 2026

  6. Grant issued

    27 May 2026

Application Details

Location
Abbey Street , Cahir , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.036 ha

Timeline

Registration Date
23 December 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
23 April 2026
Grant Date
27 May 2026
Permission Expires
26 May 2031

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
20232REFUSED1 May 2020

(i) the demolition of an existing building (ii) the erection of a single building containing 9 no. apartments (iii) walled bin storage and bicycle parking & (iv) connection to existing public foul and surface water sewers and all associated site works

Abbey Street , Cahir , Co. Tipperary

1m
211883N/A23 Dec 2021

(i)Demolition of an existing building, (ii) the erection of a single building containing nine apartments, (iii) enclosed bin storage area and bicycle parking and (iv) connection to existing foul and surface water sewers and all associated site works

Abbey Street , Cahir , Co Tipperary

1m
2260460REFUSED5 Sept 2022

(i) the demolition of an existing building, (ii) the erection of a single building containing twelve apartments, (iii) enclosed bin storage area and bicycle parking and (iv) connection to existing foul and surface water sewers and all associated site works

Abbey Street , Cahir , Co. Tipperary

1m
2216CONDITIONAL13 Jan 2022

(i)Demolition of an existing building, (ii) the erection of a single building containing nine apartments, (iii) enclosed bin storage area and bicycle parking and (iv) connection to existing foul and surface water sewers and all associated site works

Abbey Street , Cahir , Co Tipperary

47m
20549CONDITIONAL3 Jun 2020

(i) change the use of an existing restaurant to a beauty salon (ii) to create a window to the rear of the unit and (iii) to reconfigure the internal layout of same and all associated site development works

Abbey Street , Cahir , Co. Tipperary

62m
17600048CONDITIONAL25 Jan 2017

(I) demolition of an existing building and associated boundary wall (ii) the construction of an extension to an existing apartment block which will comprise 3 no. new apartments (iii) a new on site communal area (iv) on-site parking (v) all other associated site development works

Abbey Street , Cahir , Co. Tipperary

77m
2460658CONDITIONAL9 Aug 2024

extension as built, to the rear of dwelling and including rooflights to the front elevation

3 Mountain Road , Cahir , Co. Tipperary

80m
2460657CONDITIONAL9 Aug 2024

an extension as built, to the rear of dwelling and including rooflights to the front elevation

4 Mountain Road , Cahir , Co. Tipperary

85m
2460020CONDITIONAL14 Jan 2024

an existing extension to the existing dwelling and all associated site works

44 Mountain Road , Cahir , Co. Tipperary

92m
24154CONDITIONAL10 Jul 2024

a two storey extension constructed to the rear of the dwelling and associated site works

42 Mountain Road , Cahir , Co. Tipperary

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?