Ballynilard , Tipperary , Co. Tipperary
N/APlanning application 2660031
Tipperary - Tipperary County Council
Proposed Development
RED III application for development which comprises the construction of an anaerobic digestion facility to produce renewable biomethane, CO2 (which will be captured), and a bio-based fertiliser from organic material. The total gross floor area of the proposed development (including internal plant areas and ancillary structures) will be c. 3,301 sq.m. The development will consist of the following: • 3 no. digesters (all c. 15.5m in height), 2 no. digestate storage structures (c. 15.5m and c. 12m in height), a liquid feed tank (c. 4m in height) and a pump room and O2 generation structure (with a GFA of c. 27 sq.m. and a height of c. 2.6m), located in the northern section of the site. • 4 no. pasteurisation tanks (each c. 6m in height), a post pasteurisation cooling tank (c. 4m in height) and a pre fertiliser manufacturing tank (c. 4m in height), located to the southeast of the main digesters. • A part single-storey and part two-storey reception hall (with a gross floor area (GFA) of c. 1,964 sq.m. and an overall height of c. 16.5m) to accommodate a laboratory, panel room, tool store, workshop, and storage areas, with a liquid feed intake adjacent to the reception hall, located to the centre of the site. • Two pump house structures, each with a height of c. 2.6m and GFAs of 14 sq.m. and 21 sq.m., will be provided to the west and east of the reception hall building respectively. • A single-storey solid digestate storage and a nutrient recovery building (with a GFA of c. 880 sq.m and an overall height of c. 12.4m) located to the east of the reception hall, in the central portion of the site. • Odour abatement plant (with an overall height of c. 7m) and equipment and a digestate offtake area will be provided to the east of the solid digestate storage and nutrient recovery building. • Construction of an ESB substation (with a GFA of c. 27 sq.m and a height of c. 3.4m), a grid injection unit (with a GFA of c. 22 sq.m and a height of c. 2.8m) (which will be connected to the gas grid by way of an underground connection by Gas Networks Ireland), a GNI / grid offtake skid, and a fire water storage tank (with a height of c. 7.7m) in the southern portion of the site. • Construction of 2 no. CO2 tanks (c. 10.7m in height), a CO2 loading pump (c. 2.6m in height), CO2 auxiliaries (c. 2.6m in height), CO2 liqueufactor (with an overall height of c. 8.2m), a CO2 compressor (with an overall height of c. 5.9m) and a CO2 pre-treatment skid (c. 3.5m in height), located in the we
View the full application file on the council's planning portal →Application Details
- Location
- Ballynilard , Tipperary , Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 6.03 ha
Timeline
- Registration Date
- 19 January 2026
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
demolition of existing entrance and front boundary wall and replace with new set back entrance and front boundary wall and associated site works
Ballynilard , Galbally Road , Tipperary
(1) Permission for filling and raising of former quarry for agricultural use, using clean, inert construction and demolition waste, soil and subsoil including all necessary re-seeding and preservation of boundaries and boundary features. (2) Permission for retention of crushing of imported inert construction and demolition waste including permission for its continued crushing use along with heaping and storage of all recycled aggregate (3) Permission is also sought for the sale and transport off-site of crushed, recycled aggregate (4) Permission for installation of prefabricated structures comprising staff canteen, office and toilet accommodation including the installation of on-site effluent treatment system and all associated site development works
Ballynilard , Tipperary
Permission to de-commission existing septic tank and for permission to install waste water treatment system and soil polishing filter and associated site works
Clonpet , Tipperary
(1) filling and raising of former quarry for agricultural use, using clean, inert construction and demolition waste, soil and subsoil including all necessary re-seeding and preservation of boundaries and boundary features. (2) Permission for retention of crushing of imported inert construction and demolition waste including permission for its continued crushing use along with heaping and storage of all recycled aggregate. (3) Permission is also sought for the sale and transport off-site of crushed, recycled aggregate (4) Permission for installation of prefabricated structures comprising staff canteen, office and toilet accommodation including the installation of on-site effluent treatment system and all associated site development works. This development will require a Waste Licence.
Ballynilard , Tipperary
1. filling and raising of former quarry for agricultural use, using clean, inert construction and demolition waste, soil and subsoil including all necessary re-seeding and preservation of boundaries and boundary features. 2. crushing of some imported inert construction and demolition waste including permission for heaping and storage of all recycled aggregate. 3. permission is also sought for the sale and transport off site of crushed, recycled aggregate (circular economy) 4. permission for installation of prefabricated structures comprising staff canteen, office and toilet accommodation including the installation of a on-site effluent treatment system and all associated site development works (this development will require a waste licence)
Ballynilard , Co. Tipperary
to fill and raise former quarry for agricultural purposes, using clean inert construction and demolition waste, soil and subsoil. Existing boundaries will be maintained with all mature trees preserved hedgerows strengthened and grass seed will be selected for land restoration
Ballynillard , Co. Tipperary
(1) change of use of part of an existing dwelling to use as general offices (2) PERMISSION for a change of use of the remaining dwelling part of the existing dwelling to use as general offices and staff facilities and (3) PERMISSION to extend this existing building to provide additional offices and associated staff facilities and all associated site works
Ballynilard , Tipperary , Co. Tipperary
the extension of the operational lifespan of a solar pv development permitted by Tipperary County Council under Planning. Ref. 16600359 from 25 no. years as permitted (by reason of condition no. 3 of permission Planning Ref. 16600359) to 40 no. years
Ballynilard , Tipperary , Co. Tipperary
alterations to the previously permitted solar farm as follows: a) Replacement of a permitted single storey terminal electrical station and a separate single storey electrical switchroom (permitted as part of a solar farm permission by Tipperary County Council Reg. Ref. 16600359) with a single storey 20kV substation building on the site of the previously permitted terminal electrical station; repositioning of a permitted storage container, and minor solar panel layout revision adjacent to the proposed substation; repositioning of entrance gate and security fencing at entrance to the solar farm field; and provision of new gate in perimeter security fence adjacent to Ballynilard Stream; and b) Permission to increase the operational period of the solar farm from 25 years to 40 years
Ballynilard , Tipperary , Co. Tipperary
construct entrance, dwelling house, domestic garage, sewage treatment system and soil polishing filter and associated site works
Clonpet , Tipperary
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?