← Back to search

St. Joseph’s CBS Secondary School , Summerhill Nenagh , Co. Tipperary

CONDITIONAL

Planning application 2660126

Tipperary - Tipperary County Council

Proposed Development

change of use from residential use (former CBS brothers residence and ancillary garage) to assembly & recreation use (educational, including proposed changing rooms to existing garage), proposed external fire stairs & related elevational changes and works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    16 Feb 2026

  2. Decision: CONDITIONAL

    7 Apr 2026

  3. Decision due

    12 Apr 2026

  4. Grant issued

    11 May 2026

Application Details

Location
St. Joseph’s CBS Secondary School , Summerhill Nenagh , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
7.25 ha

Timeline

Registration Date
16 February 2026
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
7 April 2026
Grant Date
11 May 2026
Permission Expires
10 May 2031

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2660219CONDITIONAL10 Mar 2026

an all-weather training pitch with 5 metre high precast concrete ball wall, perimeter fencing, 6 no. 12 metre high columns and floodlights and all associated site works

St. Josephs CBS Primary School , Summerhill Nenagh , Co. Tipperary

70m
2660079N/A3 Feb 2026

change of use from residential (former CBS brothers residence) to assembly & recreation (educational) & related works

St. Joseph’s CBS Secondary School , Summerhill Nenagh , Co. Tipperary

111m
18600142CONDITIONAL8 Feb 2018

a single-storey extension to existing school and all related site works

St Josephs CBS , Summerhill , Nenagh

144m
2260620CONDITIONAL15 Nov 2022

a single storey extension to the north western side of the existing house to include bedroom, wc area, utility room and ancillary site works

26 Hawthorns , Summerhill , Nenagh Co. Tipperary

166m
2260274CONDITIONAL4 Jun 2022

the existing first floor extension including dormer roof and windows as constructed to the rear of the dwelling

No. 5 Casement Terrace , Dublin Road , Nenagh Co. Tipperary

176m
19600977CONDITIONAL4 Sept 2019

(a) proposed new single storey extension to existing school building (b) minor alterations to the existing school building & all associated site works

Summerhill , Nenagh , Co. Tipperary

193m
21758CONDITIONAL26 May 2021

standalone prefabricated building and enclosed outside play area and PERMISSION to use the building as a Community Childcare Facility and Permission for ancillary site works including the provision of a ramp and access footpaths

CBS Primary School , Summerhill , Nenagh Co. Tipperary

198m
17600053N/A27 Jan 2017

one single storey free standing prefabricated building and associated external access steps and a ramp, within the grounds of the hotel, for the purposes of offering computed based examinations services to the public

The Great National Abbey Court Hotel , Dublin Road , Nenagh

214m
19600510CONDITIONAL15 May 2019

extension to rear of dwelling

6 Thomas McDonagh Street , Nenagh , Co. Tipperary

215m
2460078N/A8 Feb 2024

1. Solar PV panels to the existing hotel roof 2. Two new wind turbines, not exceeding 21.2m height. 3. A Container battery storage installation with 6 electric vehicle charge points, weather monitoring station and associated site works

Nenagh North and Tyone , Abbeycourt Hotel Dublin Road , Nenagh

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?