Urard , Gortnahoe Thurles , Co. Tipperary
N/APlanning application 2660204
Tipperary - Tipperary County Council
Proposed Development
a slatted house with underground slurry storage and all associated site works
Application Timeline
Application received
6 Mar 2026
Further information requested
13 Apr 2026
Application Details
- Location
- Urard , Gortnahoe Thurles , Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.25 ha
Timeline
- Registration Date
- 6 March 2026
- Status
- FURTHER INFORMATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
construction of a one and a half storey extension to the side of my dwelling, minor modifications to the existing dwelling and all associated site development works
Urard , Gortnahoe , Thurles
a) the construction of a single storey detached dwelling; b) a new detached garage; c) a new site entrance; d) new connections to existing utilities; e) a new waste-water treatment system & percolation area; f) all associated site works. Retention planning permission is also being sought for the following works: g) Temporary retention of the existing mobile home unit all associated site works
Urard , Gortnahoe , Thurles
a detached, single-storey, 71 sq.m ancillary family modular unit to the rear of the existing dwelling comprising of 1-bedroom ancillary family accommodation with an integrated work-from-home office, accessed via the existing entrance and connected to the services and drainage of the existing dwelling, the development utilises the existing vehicular entrance and includes an internal turning area to ensure forward gear egress only, together with all associated site works
Fennor Gortnahoe , Thurles , Co. Tipperary
existing domestic building containing home gym, home office, store and a separate domestic garage/garden store both at rear of dwelling
Fennor , Gortnahoe , Co. Tipperary
a detached, single-storey, 71 sq.m ancillary family modular unit to the rear of the existing dwelling. The unit comprises 1-bedroom ancillary family accommodation with an integrated work-from-home office, accessed via the existing entrance and connected to the services and drainage of the existing dwelling. The development utilises the existing vehicular entrance and includes an internal turning area to ensure forward gear egress only, together with all associated site works
Fennor Gortnahoe , Thurles , Tipperary
construction of three bedroomed bungalow with connection to existing septic tank on site, close-up existing entrance on site and construct new site entrance; with all associated siteworks
Urard , Urlingford , via Thurles
construction of three bedroomed bungalow with connection to existing septic tank on site, close up existing entrance on site and construct new site entrance with all associated site works
Urard , Urlingford , via Thurles
works to the existing single-storey, three-bedroom residential dwelling as follows: 1) the construction of a one-and-a-half-storey extension to the side, south-east-facing elevation; 2) the construction of a single-storey extension to the rear, north-east-facing elevation; and 3) alterations to all elevations, the reconfiguration of internal layouts, and the installation of rooflights. Other works as part of the development include decommissioning the existing wastewater treatment system and installing a new on-site EPA-compliant wastewater treatment system with a percolation area, soakaways, landscaping and all associated site works to facilitate development
Fennor , Urlingford , Co. Tipperary
a dwelling, domestic garage, entrance, install waste water treatment system, including associated site works
Urard , Gortnahoe , Thurles
a dwelling, domestic garage, entrance, install waste water treatment system, including associated site works
Urard , Gortnahoe , Thurles
The submission window has closed
Observations on this application closed on Thursday 9 April 2026, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?