Upper Main Street , Ballyporeen , Cahir Co. Tipperary
N/APlanning application 2660455
Tipperary - Tipperary County Council
Proposed Development
the construction of an extension to the side and rear of existing dwelling
View the full application file on the council's planning portal →Application Timeline
Application received
17 May 2026
Further information requested
9 Jul 2026
Further information received
18 Aug 2026
Decision due (upcoming)
14 Sept 2026
Application Details
- Location
- Upper Main Street , Ballyporeen , Cahir Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.099 ha
Timeline
- Registration Date
- 17 May 2026
- Status
- NEW APPLICATION
- Decision
- N/A
- Decision Due
- 14 September 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
to construct an extension to a height of 4850mm with two unsuite bedrooms. The front will be in line with existing buildings and will comprise of a door and window including a flat roof. There will be a single story extension to the kitchen at the rear of the existing house with access to the two bedrooms, total area 83.4 meters squared 1
Upper Main Street , Ballyporeen , Cahir
construction of an extension to the side and rear of existing dwelling
Upper Main Street , Ballyporeen , Cahir Co. Tipperary
construction of an extension to a height of 4850mm with two en suite bedrooms. The front will be in line with existing buildings and will comprise a door and window, including a flat roof. There will be a single story extension to the kitchen at the rear of the existing house with access to the two bedrooms. total area 83.4 meters squared
Upper Main Street , Ballyporeen , Cahir Co. Tipperary
alterations to front elevation including provision of access to back yard, demolition of flat roofed out building and construction of single storey flat roofed extension to rear of dwelling house
Upper Main Street , Ballyporeen , Co. Tipperary E21 Y472
an extension to their dwelling consisting of a ground floor bedroom and bathroom
Main Street , Ballyporeen , Co. Tipperary
alterations to front elevation including provision of access to back yard, demolition of flat roofed out building and construction of single storey flat roofed extension to rear of dwelling house
Upper Main Street , Ballyporeen , Co. Tipperary E21 Y472
a single storey extension to the rear of the dwelling. The extent of the works consists of a rear lobby bedroom and bathroom
Main Street , Ballyporeen , Co. Tipperary
construction of dwelling including office, rear sunroom, rear living accommodation and all associated site works
Main Street , Ballyporeen , Co. Tipperary
construction of dwelling including office, rear sunroom, rear living accommodation and all associated site works
Main Street , Ballyporeen , Co. Tipperary
construction of dwelling including office, rear sunroom, rear living accommodation and all associated site works
Main Street , Ballyporeen , Co. Tipperary
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?