Coolderry Farm , Norwood , Nenagh
N/APlanning application 2660464
Tipperary - Tipperary County Council
Proposed Development
construction of a new single storey passive house, new entrance, access roadway, septic tank waste water treatment system, percolation area and associated groundworks and landscaping. A new access roadway will be constructed lined by mixed species native Irish hedging and native irish trees. the roadway will have an entrance from the L2255-1. The development will make use of sustainable building materials throughout and solar panels with battery storage for its main power source
View the full application file on the council's planning portal →Application Details
- Location
- Coolderry Farm , Norwood , Nenagh
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.72 ha
Timeline
- Registration Date
- 18 May 2026
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
a new single storey passive house, entrance and associated groundworks, garden and landscaping, a new access roadway will be constructed lined by mixed species native Irish hedging and native Irish trees. the roadway will have an entrance from the L2255-1. The development will make use of sustainable building materials throughout and solar panels with battery storage for its main power source
Coolderry Farm , Norwood , Nenagh Co. Tipperary
the construction of a new single storey passive house, new entrance, access roadway, septic tank waste water treatment system, percolation area and associated groundworks and landscaping
Coolderry , Norwood , Nenagh
refurbishment and extension of an existing single storey vacant property (42m2). The extension will include a new bedroom, bathroom, kitchen and utility room, (149.48m2), tie into existing waste water treatment and water supply from existing site borehole
Coolderry Farm , Nenagh , Co. Tipperary
renovation and extension of existing vacant property, new driveway and associated ancilliary works
Coolderry Farm , Coolderry , Norwood Nenagh
to demolish existing dwelling house and out buildings on site and construct a new dwelling house, garage, waste water treatment system and entrance along with all ancillary site works
Coolderry , Toomevara , Nenagh
to renovate and extend existing cottage on site and construct a new garage, waste water treatment system and entrance along with all ancillary site works in place of the development granted permission under 18601148
Coolderry , Toomevara , Nenagh
construction of a new single storey dwelling, domestic garage, waste water treatment system, entrance and all ancillary site works
Coolderry , Toomevara , Co. Tipperary
RED III Development which will consist of the construction and operation of a renewable energy development comprising the following; - 4 No. wind turbines with a tip height of 160m, a hub height of 92m, a rotor diameter of 136m and all associated foundations. - A permanent meteorological mast with an overall height of 92m - Turbine and meteorological mast temporary and permanent hard-standing areas including crane hardstand areas; - Upgrade of an existing farm entrance and access track off the R498 regional road to the south of the site in the townland of Grenanstown, to serve as construction and operation access; - Upgrade and widening of existing internal tracks and provision of new permanent and temporary site access tracks and all associated site drainage; - 1 no. borrow pit and associated drainage infrastructure to be used as a source of stone material during construction; and as a permanent material storage area. - Construction of 1 no. temporary construction compound with associated temporary site offices, parking areas and security fencing - A permanent 38kV on-site substation to include control building with electrical infrastructure, welfare facilities, car parking, security fencing and lighting, and all associated infrastructure, services, and site works. - All associated underground electrical and communications cabling connecting the turbines to the proposed on-site 38kV substation. - Underground grid connection between the onsite 38 kV substation and the existing Nenagh 110 kV substation comprising approximately 0.75km within the windfarm, 6.2km along the R498, and 1.1km along the L5136. - Biodiversity enhancement areas - All associated site works above and below ground, including site clearance, site drainage, security gates, fencing, permanent and temporary signage, landscaping and revegetation
Townlands of Coolderry Grenanstown Ballinamona Knockbrack Kilconane Kilkeary Ballygasheen Knockalton Upper Lisbunny Tyone and Lissatunney , Nenagh , Co. Tipperary
dwelling house, garage, waste water treatment system, entrance, driveway along with all ancillary site works
Shanbally , Norwood , Nenagh
the construction of a dwelling house, garage and carport, waste water treatment system, entrance, driveway along with all ancillary site works
Shanbally , Norwood , Nenagh Co. Tipperary
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?