← Back to search

Riverstown , Birr , Co. Tipperary

N/A

Planning application 2660605

Tipperary - Tipperary County Council

Proposed Development

the widening of existing vehicular entrance, removal of existing wall and gates, construction of entrance piers and gates together with associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    21 Jun 2026

  2. Further information requested

    30 Jul 2026

Application Details

Location
Riverstown , Birr , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.44 ha

Timeline

Registration Date
21 June 2026
Status
FURTHER INFORMATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

5m
2660553N/A6 Jun 2026

proposed alterations to existing domestic vehicular entrance consisting of removal of existing walls and gates and the widening of the entrance and construction of 2 entrance piers and gates. The purpose of new entrance is to improve ingress and egress for the property and allow for safe vehicular access.

Behans , Riverstown , Birr Co. Tipperary

57m
2560242N/A26 Mar 2025

1) subdivide existing dwelling and adjoining store into two separate sites, 2) change of use of the proposed subdivided store to use as a separate dwelling house and all ancillary works

Ballyloughnane , Riverstown , Co. Tipperary

74m
2560350N/A23 Apr 2025

1) subdivision of existing dwelling and adjoining store into two separate sites and 2) change of use of the proposed subdivided store to use as a separate dwelling house and all ancillary works - the entire development is contained within the curtilage of a protected structure

Ballyloughnane , Riverstown , Co. Tipperary

96m
2560109CONDITIONAL18 Feb 2025

the construction of a new dwelling house, entrance and ancillary works

Ballyloughnane , Riverstown , Co. Tipperary

101m
2592CONDITIONAL30 May 2025

1) the construction of a new agricultural slatted shed complete with an underground slurry storage tank, 2) extension to existing concrete silage slab, 3) all associated ancillary site works to complete the development

Ballyloughnane , Riverstown , Birr

142m
2560342REFUSED31 Jul 2025

Full planning permission for the following: 1/ Proposed subdivision of existing site into 2No. sites. 2/ Construction of new site entrance to service the existing dwelling on proposed Site No.1. 3/ Construction of new dwelling house incorporating existing site entrance in proposed Site No. 2 and all ancillary works

Ballindarra , Birr , Co. Offaly Ireland

142m
2560296N/A9 Jul 2025

1/ Proposed subdivision of existing site into 2No. sites. 2/ Construction of new site entrance to service the existing dwelling on proposed Site No.1. 3/ Construction of new dwelling house incorporating existing site entrance in proposed Site No. 2 and all ancillary works

Ballindarra Riverstown , Birr , Co. Offaly Ireland

171m
22203CONDITIONAL21 Apr 2022

REMOVAL OF CHIMNEY, ALTERATIONS TO THE FRONT OF THE HOUSE TO CONSIST OF THE RELOCATION OF EXISTING WINDOW AND FRONT DOOR OPENINGS, REMOVAL OF GALVANISED ROOF AND REPLACEMENT WITH SLATE ROOF TO MATCH EXISTING, RAISING EAST GABLE WALL, REINSTATEMENT OF ORIGINAL GARAGE ENTRANCE/REAR ACCESS AND OPENING UP WORKS AT THE REAR OF THE PROPERTY TO CONSIST OF 3 NEW WINDOW OPENINGS

RIVERTOWN , BIRR , CO. OFFALY

192m
20612CONDITIONAL18 Jun 2020

construction of 6 no. two-storey semi-detached dwelling houses, new boundaries, inclusive of connection to the existing estate foul and storm drainage and all associated site works

Ballyloughnane , Riverstown , Birr Co. Tipperary

194m
19601085N/A2 Oct 2019

the construction of 6 no. two storey semi detached dwelling houses, new boundaries, inclusive of connection to the existing estate foul and storm drainage and all associated site works

Ballyloughnane , Riverstown , Birr

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?