← Back to search

Ballyhogan , Ballycommon , Nenagh

CONDITIONAL

Planning application 2660677

Tipperary - Tipperary County Council

Proposed Development

the as built single bay constructed to end of previously granted shed, and PERMISSION for the construction of a full length extension to the existing shed, full size to be approx. 39.1m x 19.8m for the purposes of machinery and hay/straw storage. All construction as per existing shed, concrete lower wall with metal cladding upper wall and roof

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    13 Jul 2026

  2. Decision: CONDITIONAL

    26 Aug 2026

  3. Decision due

    6 Sept 2026

  4. Grant issued

    29 Sept 2026

Application Details

Location
Ballyhogan , Ballycommon , Nenagh
Applicant
N/A
Application Type
RETENTION
Planning Authority
Tipperary County Council
Site Area
4.45 ha

Timeline

Registration Date
13 July 2026
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
26 August 2026
Grant Date
29 September 2026
Permission Expires
28 September 2031

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2660542N/A3 Jun 2026

the as built single bay constructed to end of previously granted shed, and permission for the construction of a full length extension to the existing shed, full size to be approx 39.1m x 19.8m for the purposes of machinery and hay/straw storage. All construction as per existing shed i.e. concrete lower wall with metal cladding upper wall and roof

Ballyhogan , Ballycommon , Nenagh Co. Tipperary

200m
211515CONDITIONAL15 Oct 2021

a new dwelling house, garage, new entrance, packaged wastewater treatment system and polishing filter and all associated site works

Ballyhogan , Ballycommon , Nenagh

255m
21550N/A23 Apr 2021

single storey dwelling house, detached garage, waste water treatment system, site entrance and all ancillary site works thereto

Ballyhogan , Ballycommon , Nenagh Co. Tipperary

255m
21631CONDITIONAL7 May 2021

construction of single storey dwellinghouse, detached garage, waste water treatment system, site entrance and all ancillary site works thereto

Knigh , Ballycommon , Nenagh Co. Tipperary

274m
2260183CONDITIONAL22 Apr 2022

the construction of a single-storey dwelling house, detached garage, wastewater treatment system, site entrance and all ancillary site works thereto.

Knigh , Ballycommon Nenagh , Co. Tipperary

276m
2561030N/A14 Oct 2025

extension to the rear of the property

Knigh , Nenagh , Co. Tipperary

277m
2561081N/A28 Oct 2025

the extension to the rear of the property and installation of window to side elevation

Knigh , Nenagh , Co. Tipperary

277m
25245CONDITIONAL10 Dec 2025

extension to the rear of the property and installation of window to side elevation

Knigh , Nenagh , Co. Tipperary

294m
2260184CONDITIONAL22 Apr 2022

the construction of a dwelling house, detached garage, wastewater treatment system, site entrance and all ancillary site works thereto

Knigh , Ballycommon Nenagh , Co. Tipperary

333m
21885CONDITIONAL18 Jun 2021

single storey dwelling, waste water treatment system, new site entrance and all associated site works

Knigh , Ballycommon , Nenagh

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?