← Back to search

Curragharneen , Dolla , Co Tipperary

CONDITIONAL

Planning application 2660766

Tipperary - Tipperary County Council

Proposed Development

a change of house type from that previously granted under Planning Register Reference 2460926. The proposed development consists of the construction of a two storey dwelling house in lieu of the previously approved 2 storey dormer dwelling, together with all associated site development works and ancillary site works. Completion of partly constructed house , blockwork complete to 1st floor level; Overall height approx 8.5m above finished ground floor level

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    6 Aug 2026

  2. Decision: CONDITIONAL

    29 Sept 2026

  3. Decision due

    30 Sept 2026

Application Details

Location
Curragharneen , Dolla , Co Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
2.4 ha
Floor Area
319 sq m
Residential Units
1

Timeline

Registration Date
6 August 2026
Status
DECISION MADE
Decision
CONDITIONAL
Decision Date
29 September 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

9m
2460926CONDITIONAL30 Oct 2024

completion of partially constructed property, install waster water treatment system, garage, entrance, driveway and all ancillary works

Curragharneen , Dolla , Nenagh Co. Tipperary

538m
2660815N/A20 Aug 2026

the construction of a new house, garage, entrance and waste water treatment system with all associated site works

Curragharneen , Silvermines , Nenagh

680m
18600011UNCONDITIONAL5 Jan 2018

single storey house, domestic garage, septic tank, percolation area and entrance - previous Planning No. 12510414

Mountisland , Dolla , Nenagh

794m
2660252CONDITIONAL22 Mar 2026

construction of a vehicular entrance, dwelling house, domestic garage, septic tank and percolation area together with all associated site works

Curragharneen , Silvermines , Co. Tipperary

833m
24174N/A31 Jul 2024

a new single storey house complete with an effluent treatment system and new site entrance

Curryquin , Dolla , Nenagh

842m
23160N/A9 Jun 2023

a new single storey house complete with an effluent treatment system and a new site entrance

Curryquin , Dolla , Nenagh

852m
24167N/A22 Jul 2024

a new single storey house complete with an effluent treatment system and a new site entrance

Curryquinn , Dolla , Nenagh Co. Tipperary

1.1km
18600372CONDITIONAL28 Mar 2018

construct a livestock shed with underground storage and all associated site works

Lisnageenly , Silvermines , Nenagh

1.4km
19601372CONDITIONAL6 Dec 2019

construction of (i) hardcore base, (ii) complete part constructed roadway with hardcore. Permission for retention for (i) agriculture entrance gateway, (ii) man-made pond, (iii) part constructed roadway (iv) removal of hedgerows, (v) hardcore base area and all associated site works

Barnagore , Dolla , Nenagh

1.5km
201365N/A18 Nov 2020

construction of (i) loose shed with underground effluent tank (ii) single-story dwelling (iii) new driveway (iv) wastewater treatment system and percolation area and all associated site works

Barnagore , Dolla , Nenagh

The submission window has closed

A decision issued on this application, so observations can no longer be made. Anyone who made a submission during the five-week window can appeal to An Coimisiún Pleanála within four weeks of the decision — until Tuesday 27 October 2026 — for a fee of €220.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?