D O'Shea Butchers , Patrick Street , Templemore
N/APlanning application 2660771
Tipperary - Tipperary County Council
Proposed Development
the change of use of an existing butcher shop premises to a fast-food takeaway with no customer seating, together with associated internal alterations and fit-out works, installation of extraction and ventilation equipment, replacement fascia signage and all associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
7 Aug 2026
Decision due (upcoming)
1 Oct 2026
Application Details
- Location
- D O'Shea Butchers , Patrick Street , Templemore
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.004 ha
Timeline
- Registration Date
- 7 August 2026
- Status
- NEW APPLICATION
- Decision
- N/A
- Decision Due
- 1 October 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the change of use of an existing butcher shop premises to a fast food takeaway with no customer seating together with associated internal alterations and fit-out works and will include the provision of kitchen and food preparation areas, customer counter area, food storage areas, installation of an under sink grease trap, installation of associated extraction and ventilation equipment, replacement fascia signage to the existing shopfront, use of the existing rear yard for ancillary bin storage and access and all associated site works (no extension, increase in floor area, alteration to the building footprint, alteration to ground levels, new vehicular access, illuminated signage, projecting signage or digital signage is proposed)
D O'Shea Butchers , Patrick Street , Templemore Co. Tipperary
a) unauthorised works comprising alterations to the existing building, including new windows and doors to the front façade, b) PERMISSION for the conversion of vacant upper floor accommodation over the existing commercial unit to provide 3 no. residential units, together with all associated site works, ancillary storage and services
No. 1 Main Street , Templemore , Co. Tipperary
a) demolition of the existing 2-storey extension to the rear of the existing dwelling; b) construction of a new single storey extension to the rear of the existing dwelling; c) associated alterations to existing dwelling external elevations to accommodate proposed new extension & internal layout; d) all associated site works
Main Street , Templemore , Co. Tipperary
a) removal and replacement of ground floor first and second floor timber sash windows to front exterior, b) all associated site works of protected structure TMS28
Main Street , Templemore , Co. Tipperary
the following works: a) demolition of the existing 2-storey extension to the rear of the existing dwelling; b) construction of a new single storey extension to the rear of the existing dwelling; c) associated alterations to existing dwelling external elevations to accommodate proposed new extension & internal layout; d) all associated site works. The above works are proposed to be carried out to a Protected Structure, reference: TMS28
Main Street , Templemore , Co. Tipperary
change of use from previous retail use at part of the ground floor and to reinstate the building as a single residential unit, to demolish an existing lean-to extension and part of a single storey extension to the rear of the dwelling, to re-roof the building in natural slate, for repairs to the shopfront to include replacement glazing, for removal of the rear chimney, for alterations to some rear windows/door openings to carry out internal alterations and modifications together with any associated works. The above proposed works are to protected structure.
Patrick Street , Templemore , Co. Tipperary
(1) the construction of a single-story rear extension to existing 3 storey semi-detached building allowing for the construction of a ground floor commercial unit and ground floor one bedroom apartment; (2) the change of use of existing first floor of existing semi-detached 3 storey building for a one bedroom self-contained apartment to include permission for widening of existing rear window and construction of first floor level extension and balcony to the rear of the building; (3) the demolition of an existing single storey detached shed to allow for the construction of a two storey detached apartment block of two no. one bedroom apartments, construction of a single storey bin and bike store and all associated site works
4 Patrick Street , Templemore , Co. Tipperary
the following unauthorised development:- 1) partial change of use from bank to gym / wellbeing hub, 2) alteration to existing building, including internal alterations, and forming door at east gable of main house to form an access door off shared laneway, 3) installation of modular building to rear yard, 4) erection of lightweight fencing to separate rear yard from garden area, 5) replacement of rear fire exit door and 7 no. rear windows and 6) signage and associated works
128 – 130 Main Street , Templemore , Co. Tipperary
the change of use of the existing disused portion of the ground floor of the former Bank of Ireland premises, from a Financial institution to a crèche to include the following: (a) open two access doors to the side of the building, (b) subdivide the interior, (c) erect a toilet block to the rear of Pre-school room and install a portacabin for staff facilities, along with proposed signage and all associated site works. This is a protected structure TMS 29, NIAH 22308017
128-130 Main Street , Templemore , Co. Tipperary
the relocation of the existing business located at Boylesports, Unit 4, The Orchard, Castletroy, Limerick V94KD7Y to Castletroy Court, Dublin Road, Castletroy, Limerick V94 NX23A. This will involve a change of use from an existing restaurant unit to a betting shop to include all internal demolitions, alterations, revised signage and all associated siteworks
Main Street , Templemore , Tipperary
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?