← Back to search

Fort Henry Business Park , Ballina , Co. Tipperary

N/A

Planning application 2660865

Tipperary - Tipperary County Council

Proposed Development

  1. 1.
    1. (i)
      Works to the existing manufacturing production and administration building to include: (a) Construction of an extension building between the existing production and administration building and the existing warehouse building with associated ramp access, to provide for increased production and store space; (b) Provision of seven modular store units linked to; the existing production and administration building; and, the proposed extension for use ancillary to manufacturing activity; (c) Construction of goods lift to rear of the existing production and administration building; (d) Minor alterations to the existing car park layout to facilitate the proposed extension building
    2. (ii)
      Works to the existing light industrial building (‘Unit 2’) to provide for; (a) extension to the rear of the building to provide for increased storage; and (b) modifications to north-west and south-west elevations of that building to provide for the replacement of roller door and pedestrian door openings
    3. (iii)
      Provision of additional plant area with perimeter fencing
    4. (iv)
      Provision of new surface water management infrastructure including collection of roof water and provision of on-site surface water storage with controlled discharge from that new storage to an existing surface water outfall via a proposed new headwall outlet
    5. (v)
      Provision of new pedestrian gate access along roadside boundary
    6. (vi)
      Proposed lighting within the site;
    7. (vii)
      All associated site development works including the removal of existing temporary modular structures from the site;
  2. 2.
    Retention Permission for the following works:
    1. (a)
      Erection of three flag poles at the entrance;
    2. (b)
      Externally affixed signage on existing buildings
View the full application file on the council's planning portal →

Application Details

Location
Fort Henry Business Park , Ballina , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
1.58 ha

Timeline

Registration Date
4 September 2026Other applications received that week
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

737m
2460612CONDITIONAL5 Dec 2024

to develop a swimming platform, and associated site works. A Natura Impact Statement accompanies this application.

Moys , Killaloe , Co. Clare

744m
2460425REFUSED5 Sept 2024

to develop swimming platform, yoga deck, outdoor recreation area and changing stalls associated site works. A Natura Impact Statement accompanies this application

Moys , Killaloe , Co. Clare

783m
2560221CONDITIONAL28 Apr 2025

for Ballina/Killaloe Sports and Community Facilities Development Company (T/A Clarisford Park) in conjunction with Ballina Killaloe Active Retirement Group Ltd. are applying for full planning permission for 1) The construction of a new Petaque (Boules) Arena, c/w boundary fencing, lighting and spectator seating area and 2) The replacement of the existing grass surface on the sand based training pitch with a 4G Astro All Weather Surface. There are no proposed changes to existing flood lighting and fencing arrangements to the existing pitch area. A Natura Impact Statement has been submitted to the Planning Authority with the planning application

Clarisford Park , Moys , Killaloe Co. Clare

841m
1799CONDITIONAL16 Feb 2017

to develop rugby and athletic training facilities, floodlighting and associated site works. A Natura Impact Statement will be submitted to the Planning Authority with the application

Moys , Killaloe , Co. Clare

961m
18161UNCONDITIONAL6 Mar 2018

to Extend the Appropriate Period of Planning Permission P13-67 for dwelling house, detached garage and store with home office and associated site works

The Moys , Clarisford , Killaloe

1.1km
21406CONDITIONAL28 Apr 2021

to construct a workshop and storage together with associated site works at the rear of the house

Ethekwini , Moys Clarisford , Killaloe Co Clare

1.2km
2660715N/A5 Nov 2026

to carry out the following development: The provision of a new housing development consisting 22 No. houses and 34 No. apartments together with all ancillary works including access way which shall be through the existing Shantraud Woods estate

Moys , Killaloe , Co. Clare

1.4km
19653UNCONDITIONAL13 Aug 2019

to Extend the Appropriate Period of Planning Permission P14-371for the erection of a dwelling house and associated works

Shantraud , Killaloe , Co. Clare

1.4km
20307CONDITIONAL18 May 2020

for development at Shantraud, Killaloe, Co Clare. The application relates to the change of house type, change of site layout and vehicular entrance previously granted under planning ref. 14/371 and 19/653 and all associated site works

Shantraud , Killaloe , Co Clare

1.4km
19652UNCONDITIONAL13 Aug 2019

to Extend the Appropriate Period of Planning Permission P14-370 for the erection of a dwelling house and associated works

Shantraud , Killaloe , Co. Clare

The submission window has closed

Observations on this application closed on Thursday 8 October 2026, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?