Fort Henry Business Park , Ballina , Co Tipperary
N/APlanning application 2660890
Tipperary - Tipperary County Council
Proposed Development
- (i)Works to the existing manufacturing production and administration building to include:
- (a)Construction of an extension building between the existing production and administration building and the existing warehouse building with associated ramp access, to provide for increased production and store space
- (b)Provision of seven modular store units linked to; the existing production and administration building; and, the proposed extension for use ancillary to manufacturing activity
- (c)Construction of goods lift to rear of the existing production and administration building
- (d)Minor alterations to the existing car park layout to facilitate the proposed extension building
- (a)
- (ii)Works to the existing light industrial building (‘Unit 2’) to provide for
- (a)extension to the rear of the building to provide for increased storage;
- (b)modifications to north-west and south-west elevations of that building to provide for the replacement of roller door and pedestrian door openings
- (a)
- (iii)Provision of additional plant area with perimeter fencing
- (iv)Provision of new surface water management infrastructure including collection of roof water and provision of on-site surface water storage with controlled discharge from that new storage to an existing surface water outfall via a proposed new headwall outlet
- (v)Provision of new pedestrian gate access along roadside boundary
- (vi)Proposed lighting within the site;
- (vii)All associated site development works including the removal of existing temporary modular structures from the site; and 2. Retention Permission for the following works:
- (a)Erection of three flag poles at the entrance;
- (b)Externally affixed signage on existing buildings
- (a)
Application Timeline
Application received
11 Sept 2026
Decision due (upcoming)
5 Nov 2026
Application Details
- Location
- Fort Henry Business Park , Ballina , Co Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 1.58 ha
Timeline
- Registration Date
- 11 September 2026
- Status
- PRE_VALIDATION
- Decision
- N/A
- Decision Due
- 5 November 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
3 temporary refrigeration units, air handling units, a gas compound, bin storage area all located in the adjoining rear yard, the amalgamation of unit 3M to units 3H to 3L, extension to first floor area within unit 3L, and alterations and omissions to previously approved Planning reference 13510354. The alterations include internal alterations, the extension and reconfiguration of north east corner of units 3J, 3H 3I, elevational changes, parking and associated site works. The omissions include omitting the approved extensions to units 3A - 3G2 and to the east of units 3J, I and H, including part of the extension to the west of units 3J, I and H and the covered walkway
Fort Henry Business Park , Garrynatineel , Ballina Co. Tipperary
3 temporary refrigeration units, air handling units & generator, a gas compound, bin storage area all located in the adjoining rear yard, the amalgamation of unit 3M to units 3H to 3L, extension to first floor area within unit 3L. Modifications to previously approved Planning reference 13510354. The modifications include the as built building works, internal alterations, the extension and reconfiguration of north east corner of units 3J, 3H 3I, elevational changes, parking and associated site works.
Fort Henry , Business Park , Garrynatineel Ballina
3 temporary refrigeration units, air handling units & generator, a gas compound, bin storage area all located in the adjoining rear yard, the amalgamation of unit 3M to units 3H to 3L, extension to first floor area within unit 3L. Modifications to previously approved Planning reference 13510354. The modifications include the as built building works, internal alterations, the extension and reconfiguration of north east corner of units 3J, 3H 3I, elevational changes, parking and associated site works.
Fort Henry , Business Park , Garrynatineel Ballina
1. (i) Works to the existing manufacturing production and administration building to include: (a) Construction of an extension building between the existing production and administration building and the existing warehouse building with associated ramp access, to provide for increased production and store space; (b) Provision of seven modular store units linked to; the existing production and administration building; and, the proposed extension for use ancillary to manufacturing activity; (c) Construction of goods lift to rear of the existing production and administration building; (d) Minor alterations to the existing car park layout to facilitate the proposed extension building; (ii) Works to the existing light industrial building (‘Unit 2’) to provide for; (a) extension to the rear of the building to provide for increased storage; and (b) modifications to north-west and south-west elevations of that building to provide for the replacement of roller door and pedestrian door openings; (iii) Provision of additional plant area with perimeter fencing; (iv) Provision of new surface water management infrastructure including collection of roof water and provision of on-site surface water storage with controlled discharge from that new storage to an existing surface water outfall via a proposed new headwall outlet; (v) Provision of new pedestrian gate access along roadside boundary; (vi) Proposed lighting within the site; and (vii) All associated site development works including the removal of existing temporary modular structures from the site; and 2. Retention Permission for the following works: (a) Erection of three flag poles at the entrance; and (b) Externally affixed signage on existing buildings
Fort Henry Business Park , Ballina , Co. Tipperary
- A single storey extension to the northern end of the Production/Administration Building - New single storey link corridor between Production/Administration Building and Warehouse - New single storey extension accessed from new Link Corridor - Retention of existing single storey refrigeration building with new connection to new corridor - Relocation of containerised refrigeration unit from the northern end of Production/Administration Building to be connected to new link corridor - Retention of 2nr. existing containerised refrigeration units to the south-west of unit 2 - New first floor windows to north elevation of Production/Administration Building - All associated ancillary site works. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and accompanies this application
Technopath Manufacturing Ltd , Fort Henry Business Park , Ballina
a single storey extension to the northern end of the Production/Administration Building, new single storey link corridor between Production/Administration Building and Warehouse, new single storey extension accessed from new link corridor, relocation of containerised refrigeration unit from the northern end of Production/Administration Building to be connected to new link corridor, new first floor windows to north elevation of Production/Administration Building, all associated ancillary site works and PERMISSION for RETENTION of existing single storey refrigeration building with new connection to new corridor, 2 nr. existing containerised refrigeration units to the south-west of unit 2 - A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and accompanies this application
Fort Henry Business Park , Ballina , Co. Tipperary
decommissioning the existing wastewater treatment system and constructing a new wastewater treatment system with overground tankage up to 6.5m high with ancillary civil works such as drainage, roads, fencing and landscaping at existing facility. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and accompanies this application.
Technopath Life Sciences Park , Fort Henry , Ballina Co. Tipperary
construction of an overflow car park with associated lighting and all associated works serving the existing manufacturing facility
Fort Henry Business Park , Ballina , Co Tipperary
a new wastewater treatment plant with above ground storage and treatment tanks and associated infrastructure to replace existing wastewater treatment system serving the existing manufacturing facility, including; construction of a headwall with outfall discharge point; service/access road; decommissioning of existing wastewater treatment system; and, all associated site development and decommissioning works. A Natura impact statement will be submitted to the planning authority with the application.
Fort Henry Business Park , Ballina , Co Tipperary
the construction of an overflow car park with associated lighting and all associated works serving the existing manufacturing facility
Fort Henry Business Park , Ballina , Co Tipperary
Affected by this application?
Open for submissionsObservations close on Thursday 15 October 2026, five weeks from the date the application was received. The fee is €20, and only planning grounds count.
Check if you have grounds — freeTwo questions, no payment: we'll tell you whether what concerns you is something the council can actually take into account.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?