← Back to search

Ballincurry , Killenaule , Thurles

N/A

Planning application 2660975

Tipperary - Tipperary County Council

Proposed Development

proposed two storey dwelling, septic tank and percolation area, new site entrance and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    5 Oct 2026

  2. Decision due (upcoming)

    29 Nov 2026

Application Details

Location
Ballincurry , Killenaule , Thurles
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.404 ha
Floor Area
208.6 sq m
Residential Units
1

Timeline

Registration Date
5 October 2026
Status
NEW APPLICATION
Decision
N/A
Decision Due
29 November 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

195m
18600786CONDITIONAL21 Jun 2018

to erect a three ring high Permastore effluent storage tank and all associated site works on my farm

Ballincurry , Killenaule , Thurles

1.1km
19601392N/A13 Dec 2019

the construction of one (1) wind turbine with an overall tip height of up to 150 metres. The construction of a crane hardstand area located beside the turbine. The construction of a 20kV substation building with associated electrical plant, equipment, and security fence. The construction of internal windfarm underground cabling. The construction of a new site access track. Installation of a drainage system for the proposed hardstand and road areas and all associated site development and ancillary works

Knockanattin and Broomhill , Ballingarry , Co. Tipperary

1.1km
19600193CONDITIONAL6 Mar 2019

the conversion of an existing stable block to residential use as well as Planning Permission to (I) reduce the existing fire damaged dwelling from a two storey dwelling and renovate same (ii) create a link extension between the fire damaged dwelling and the aforementioned converted stable block to form a single extended dwelling and all associated site works

Highland Croft , Ballincurry Ballingarry , Thurles

1.2km
19601312N/A26 Nov 2019

the construction of one (1) wind turbine with an overall tip height of up to 150 metres. The construction of a crane hardstand area located beside the turbine. The construction of a 20kV substation building with associated electrical plant, equipment, and security fence. The construction of internal windfarm underground cabling. The construction of a new site access track. Installation of a drainage system for the proposed hardstand and road areas and all associated site development and ancillary works

Knockanattin and Broomhill , Ballingarry , Co. Tipperary

1.2km
2560673CONDITIONAL14 Jul 2025

the as-constructed domestic extension & all associated site development works

Killleheen , Ballingarry Thurles , Co. Tipperary

1.2km
21503CONDITIONAL15 Apr 2021

construction of a new agricultural building consisting of cattle shed with cubicle and slatted accommodation and underground effluent storage, in addition, with ancillary site works

Broomhill , Killenaule , Thurles

1.2km
2560065N/A4 Feb 2025

the as-constructed domestic extension and for PERMISSION to construct a domestic storage building & all associated site development works

Killeheen Ballingarry , Thurles , Co. Tipperary

1.2km
2172N/A25 Jan 2021

construction of a new agricultural building consisting of cattle shed with cubicle and slatted accommodation and underground effluent storage, in addition, with ancillary site works

Broomhill , Killenaule , Thurles

1.2km
21462N/A8 Apr 2021

construction of a new agricultural building consisting of cattle shed with cubicle and slatted accommodation and underground effluent storage, in addition, with ancillary site works

Broomhill , Killenaule , Thurles

1.2km
21270N/A4 Mar 2021

construction of a new agricultural building consisting of cattle shed with cubicle and slatted accommodation and underground effluent storage, in addition, with ancillary site works

Broomhill , Killenaule , Thurles

Affected by this application?

Open for submissions
26days left to make a submission

Observations close on Sunday 8 November 2026, five weeks from the date the application was received. The fee is €20, and only planning grounds count.

Check if you have grounds — free

Two questions, no payment: we'll tell you whether what concerns you is something the council can actually take into account.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?