Deerpark North , Lismore , Co. Waterford

CONDITIONAL

Planning application 17498

Waterford - Waterford City and County Council

Proposed Development

installation of a biomass boiler and drying kiln and all associated works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    10 Jul 2017

  2. Decision: CONDITIONAL

    17 Aug 2017

  3. Decision due

    3 Sept 2017

  4. Grant issued

    21 Sept 2017

Application Details

Location
Deerpark North , Lismore , Co. Waterford
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Waterford City and County Council

Timeline

Registration Date
10 July 2017
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
17 August 2017
Grant Date
21 September 2017
Permission Expires
20 September 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
20164CONDITIONAL13 Mar 2020

for installation of a drying kiln and all associated works at

Deerpark North , Lismore , Co Waterford

43m
21360CONDITIONAL30 Apr 2021

indefinite retention of single storey rear extension as constructed and permission for the construction of a single storey extension at side of dwelling house at

Deerpark North , Lismore , Co Waterford

105m
21761CONDITIONAL6 Aug 2021

formation of access to the lands from adjoining sawmill, alteration of site levels, hardcore surfacing of lands comprising 1.87 hectares and permission for retention and continued use of lands for storage, circulation areas and uses ancillary to adjoining sawmill

Deerpark North , Lismore , Co. Waterford

105m
21453CONDITIONAL19 May 2021

for construction of three sheds for storage and uses incidental to existing Sawmill business, portakabin structure for use as canteen, portakabin structure for use as toilets, new septic tank and percolation area, provision of hard standing areas, new vehicular entrance and all ancillary works at

Deerpark North , Lismore , Co Waterford

188m
2560330CONDITIONAL17 May 2025

of existing lean-to to side of dwelling until such time that the proposed works have been complete, indefinite retention of 2no. existing storage sheds and PERMISSION for Extension to existing dwelling, installation of wastewater treatment system, alterations to existing entrance, and all ancillary site works.

Deerpark East , Lismore , Co Waterford

233m
2360469CONDITIONAL6 Oct 2023

1) demolition of an existing derelict dwelling and adjacent derelict agricultural buildings, 2) de-commissioning and infilling of a former slatted tank unit, 3) construction of a new setback dwelling house, 4) new wastewater treatment system & percolation area, 5) alterations to existing roadside entrances and roadside boundary wall and all other associated site works

Deerpark North , Lismore , Co.Waterford

300m
2660270REFUSED25 Apr 2026

Planning permission to construct a single storey dwelling to be accessed by the existing site entrance, wastewater treatment system and all associated site development works.

Deerpark East , Lismore , Co. Waterford

372m
2660316CONDITIONAL13 May 2026

Construction of single storey dwelling house (change of house design to that permitted under planning ref. 21/539).

Deerpark East , Lismore , Co. Waterford

372m
21539CONDITIONAL9 Jun 2021

Construct new dwelling, garage, waste water treatment system, upgrade existing site entrance and all associated site works and services

Deerpark East , Lismore , Co. Waterford

429m
2460487N/A26 Aug 2024

Proposed change of house type from the previously approved single-storey dwellinghouse granted under permission reference number 21/999 to part one and a half-storey, part single-storey split level dwellinghouse and all associated site development works. This application is for the construction of 1 dwellinghouse ranging in height from 8.615 metres to 7.388 metres.

Deerpark East , Lismore , Co. Waterford

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?