Ballyshonock , Kilmacthomas , Co. Waterford
CONDITIONALPlanning application 17683
Waterford - Waterford City and County Council
Proposed Development
single-storey dwelling house, new entrance, wastewater treatment system and percolation area, borewell and all other associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
15 Sept 2017
Further information requested
6 Nov 2017
Further information received
22 Nov 2017
Decision: CONDITIONAL
12 Dec 2017
Decision due
19 Dec 2017
Grant issued
2 Feb 2018
Application Details
- Location
- Ballyshonock , Kilmacthomas , Co. Waterford
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Waterford City and County Council
- Floor Area
- 211 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 15 September 2017
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 12 December 2017
- Grant Date
- 2 February 2018
- Permission Expires
- 1 February 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for the (1) Construction of a new storey and a half side extension, (2) New single storey front, side and rear extensions, (3) Front, side and rear façade changes, (4) The addition of a new rooflight to the front slope of existing roof and two rooflights to the rear, (5) The replacement of the existing rooftiles with a corrugated metal roof, (6) The demolition of the existing storage building and (7) The installation of a new waste water treatment system and percolation area and all associated site works
Ballyshunnock , Kilmacthomas , Co Waterford
to construct an extension and modifications to dwelling. Extension will comprise of a single storey rear extension, a single storey porch to front, modification of window sizes, new windows and door in existing dwelling, removal of one chimney, addition of Roof lights to existing roof and all associated site development works to facilitate development
Ballyhussa , Kilmacthomas , Waterford
the construction of a new single storey house, a waste water treatment system, a bored well and an entrance along with all associated site works
Ballyshunnock , Kilmacthomas , Co. Waterford
Planning permission for the construction of a garage along with all associated site works at Ballyshunnock, Kilmacthomas, Co. Waterford.
Ballyshunnock , Kilmacthomas , Co. Waterford.
to construct a dormer style dwelling, garage, wastewater treatment system, percolation area, splayed entrance and all ancillary site works
Ballyhussa , Kilmacthomas , Co. Waterford
a Dormer style two-storey house, a separate utility/ garden store building, set back at entrance, driveway and parking, treatment system and percolation area, a well and associated siteworks at Greenan, Co. Waterford.
Greenan , Kilmacthomas , Co. Waterford
for the refurbishment of the existing cottage including raising the roof to allow a storey and a half, the addition of gable windows and rooflights to the front, elevational changes to the front façade, the construction of a rear storey and a half extention with dormer window and rooflights, the widening of the existing driveway entrance and the installation of a new waste water treatment system and polishing filter, the construction of a garage workshop and all associated site works at
Carrolls Cross , Kilmacthomas , Co Waterford
construct a store which is to incorporate the existing Forge and all ancillary site works
Parkeennaglogh , Kilmacthomas , County Waterford
To construct a Garage / Store and all ancillary site works
Parkeennaglogh , Kilmacthomas , Co. Waterford
a ten-year planning permission for a solar energy development comprising photovoltaic solar panels on ground-mounted frames; photovoltaic solar panels on roof-mounted frames to be installed on the roof of an existing industrial building; inverters; transformer unit; electrical and communications cabling; access track and associated site entrance; security fencing; pole-mounted security cameras; and all associated and ancillary site development, landscaping and reinstatement works. The operational lifetime of the proposed development is 35-years. The development is for the purposes of an activity requiring an Integrated Pollution Control Licence and an Industrial Emissions Licence
Carroll's Cross , Ballyshonock , Kilmacthomas
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?